Safety of a Tailings Storage Facility against Dam InstabilityBy D Veneziano, J Van Dyck, R Snow, W Pytel, O Zanoli
Best practice standards generally recommend assessment of the environmental and societal risks posed by tailings storage facilities, but they rarely specify how the analysis should be made. As a case
Jul 27, 2015
-
Metal cap versus steel lining system at Philsaga Mining Corporation’s Ø6100 mm SAG millBy N S. Weerasekara, S Town, E Lessing, J A. De Torres
Philsaga Mining Corporation (Philsaga) had three main aims in converting their lining system from steel to metal cap. They wanted to increase mill availability, minimise localised high wear and optimi
Aug 29, 2018
-
Improved Flotation Process Control at Newcrest's Telfer OperationBy S Hille, J Karageorgos
With the increased variability of todayÆs large-scale mining operations, consistent flotation performance is important to improving and sustaining overall recovery through the circuit. The Newcrest Te
Jan 1, 2007
-
Geomechanical Modelling of the Mount Isa Copper Deposit – Predicting MineralisationBy R O’Sullivan, D Taylor, J G. McLellan, B Miller
The Mount Isa copper deposit is located adjacent to the city of Mount Isa, Queensland, and lies within a series of Palaeoproterozoic to Mesoproterozoic Superbasins. The deposit is hosted almost entire
Aug 18, 2014
-
Developing Process Control Standards for Optimal Plant Performance at PanAust LimitedBy D Baas, D Bennett
This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr
Sep 1, 2014
-
Technology and Changes in Mines RescueAs the mining industry looks to new technologies for a safe work environment and increased production rates, so should emergency response teams when dealing with organisational incidents. Implementati
Jan 1, 2004
-
Analysis of Twin Road Tunnels Using Numerical Modelling TechniquesBy D R. Wines
The design of near-surface civil infrastructure requires detailed consideration of the geological/ geotechnical conditions, excavation geometry and sequence and ground support measures to ensure stabi
Mar 8, 2011
-
Anglo American Research LaboratoriesÆ (AARL) Experiences with Flotation Plant ModellingBy V Ser, R Crosbie
To date, Anglo American Research Laboratories (AARL) has carried out several projects, based on the techniques developed in AMIRA International LimitedÆs (the mineral industries research association)
Jan 1, 2005
-
Changing Restoration Priorities in the 21st Century – Opportunities for Novel Ecosystem Design in Mine ClosureBy P Audet, D Doley
The mining industry often embraces mine closure criteria that require the reinstatement of predisturbance or even presettlement (ie historic) ecosystems. However, the extent and severity of disturbanc
Jul 16, 2014
-
Underground Mine Radio Automation SystemsBy S Munn
Today, it can be said that the majority of mines utilise communications equipment in one form or another. Either for communications between staff making their day-to-day operations more efficient, or
Jan 1, 1999
-
Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South AustraliaBy A Querzoli, B Williams
In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann
Jul 25, 2018
-
Blast Design Parameters and Their Impact on Rock FragmentationBy B Prasad, M P. Roy, P K. Singh, C Drebenstedt
Blasting operations play a pivotal role in the overall economics of opencast mines. The blasting subsystem affects all the other associated subsystems, ie loading, transport, crushing and milling oper
Aug 24, 2015
-
Correlated Valuation MethodologyBy E C. Holloway
"The financial valuation of mining assets has a number of fundamental differences to the valuation of many other asset groupings. One such difference is that typically, the greater proportion of both
Mar 8, 2016
-
Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West AfricaBy G du Toit, P L. Gillot, M Swanepoel
Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of
Sep 1, 2014
-
Project Hobson – New Technology in AucklandBy T Ireland
The Project Hobson tunnel excavation was the first use in New Zealand of an earth pressure balance (EPB) tunnel boring machine (TBM). The tunnelling on the project was very successful and break-throug
Mar 8, 2011
-
Mineragraphy or the Petrology of Ores and its Economic SignificanceMineragraphy is a coined term to signify the field of microscopic investigation of ore minerals. The term is not euphonius and is sometimes regarded as superfluous because the subject is no more than
Jan 1, 1932
-
Effective Use of Mine Waste in the Design of a Residue Storage Facility, Pilbara Region, Western AustraliaBy A Wanninayake, E Novello, I Gillani
A residue storage facility (RSF) was designed to cater for Davidson Creek Area and Robertson Range Area operations under the FerrAus Pilbara iron ore development project in the Pilbara Region, Western
Aug 12, 2013
-
Sunrise Dam Short- to Long-Term Ventilation PlanningBy M Podreka, P Merry, L van den Berg
Anglo Gold AshantiÆs Sunrise Dam operation is located in Western Australia approximately 55 km south of the town of Laverton. Currently, the mine is producing from both its open pit and underground op
Jul 1, 2013
-
Geochemical Assessment of Mine Waste Materials and Prediction of Final Pit Lake Water Quality at a Proposed Gold Mine in MongoliaBy I Swane, R Rait, A Robertson
Geochemical assessment of mine waste materials prior to commencement of a proposed mining operation is a fundamental component of mine feasibility studies and the regulatory approvals process. Static
Sep 29, 2013
-
Cape Lambert Port B Shiploading, Sampling and AnalysisBy M Graham, R Brunning, C Andringa-Bate, S Westergren
In 2010, Rio Tinto Iron Ore’s operations commenced the planning and design of a sampling and analysis system for the new 50 Mt/a Cape Lambert Port B (CLB) facility. Current sampling systems at the por
Jul 29, 2014