Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An Application of Trend Surface Analysis to the Preparation of Cover Isopach Maps for Coal Seams

    Conventional hand drawn isopach maps of the cover of the Bulli Seam are too eomplex for use in the delineation of large domains of similar cover. Isopach maps prepared from trend surfaces fitted to th

    Jan 1, 1968

  • AUSIMM
    Optimising Metallurgy at the Planning Stage to Minimise Environmental Impact - A Feedback Loop from Geochemical Waste Characterisation

    By P Mulvey

    "Currently mine process studies and geochemical waste characterisation are considered as two interdependent studies, necessary for the development of the mine and inclusion in the environmental impact

    Jul 15, 2013

  • AUSIMM
    Zero Base Design and Risk Mitigation

    This paper examines the integration of risk management into the design philosophy of a project to produce a æzero baseÆ design, which targets a minimum capital cost without adversely impacting upon th

    Jan 1, 2004

  • AUSIMM
    Research Into the Revegetation of Concentrator Tailings Dams at Mount ISA

    By Whiteman P. C, Stacey G. S, Hunter G. D

    Processing of lead-zinc and copper ores by Mount Isa Mines Limited produces large quantit- ies of concentrator tailings waste which is pumped as a slurry to special dams where the solids are allowed

    Jan 1, 1974

  • AUSIMM
  • AUSIMM
    Verified Stability Modelling of Highwalls

    By D Fergusson, J D. St George

    Highwall stability is a major consideration in optimising opencast mine geometry. It involves assessing the risk of those slope failures that are large enough to have significant cost, safety and/or o

    Jan 1, 2006

  • AUSIMM
    Off to a Good Start with Lift #2: Drawbell Extraction ù Northparkes

    By M Lovitt, T Hewitt

    The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside

    Jan 1, 2005

  • AUSIMM
    Prediction of Yttrium, Lanthanum, Cerium and Neodymium Leaching Recovery from Apatite Concentrate Using Artificial Neural Networks

    By A H. Bagherieh, S Mesroghli, H Jorjani, S Chehreh Chelgani

    The rare earth elements (REEs) assay and recovery in leaching processes is being determined using expensive analytical methods, ICP-AES, and ICP-MS. This paper presents a neural network model to predi

    Jan 1, 2008

  • AUSIMM
    Using Best Practice Operations as a Strategy for Attracting and Retaining Professional People

    By T Trott, G Lumley

    "The mining industry suffers from a shortage of professional and other workers. Research and analysis has demonstrated a close correlation between high performance in productivity, maintenance and saf

    Nov 20, 2012

  • AUSIMM
    Translating the Challenges of Sustainability and Eco-Efficiency into Improved Business Performance at Newmont Operations

    By A J. Minns

    This paper addresses the question: how can the minerals industry remain viable; viable in the sense that we are able to access land for exploration and discovery, we are able to develop and operate mi

    Jan 1, 2004

  • AUSIMM
    Sand Mining Restoration on the Swan Coastal Plain using Topsoil – Learning from Monitoring of Previous Rehabilitation Attempts

    By E J. B van Etten

    This paper reports on the results of several years of monitoring rehabilitation at a silica sand mine on the Swan Coastal Plain, south of Perth. Mining here occurs below the regional watertable and le

    Oct 5, 2011

  • AUSIMM
    A Potential Use of Oxygen and Carbon Isotope Zonations of Wall Rocks in Prospecting Skarn Pb-Zn Deposits at Kamioka, Central Japan

    By H Peiming, W Sakurai, Y Matsuhisa, H Shimazaki, Y Fukahori

    Oxygen and carbon isotope mapping of hydrothermally altered wall rocks was applied to the blind ore prospecting of skarn Pb-Zn deposits in the Kamioka mining district, centralJapan, where the wall roc

    Jan 1, 1995

  • AUSIMM
    Some Aspects of Rank Variation and Utilization of Coal

    The proper selection of a coal for a particular use depends on knowledge of fundamental data concerning the coals that offer, particularly their type and rank. Type of coal depends on the nature of th

    Jan 1, 1955

  • AUSIMM
    Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground Conditions

    By M Norbert, D O’Connor

    The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set

    Sep 17, 2014

  • AUSIMM
    Modelling Channel Scale Flow in Heap Leaching Using Smooth Particle Hydrodynamics (SPH)

    Modelling Channel Scale Flow in Heap Leaching Using Smooth Particle Hydrodynamics (SPH)

    Sep 13, 2010

  • AUSIMM
    Operation of the sluice box under conditions of low water flow

    Small scale gold mining operations in Papua New Guinea (PNG) have been observed to use very low flow rates of water in sluice boxes. In a series of laboratory experiments carried out to determine whet

    Jan 1, 1986

  • AUSIMM
    New Technology for Refractory Gold Ores

    This paper reviews hydrometallurgical processing technology for refractory gold ores, which form an increasing resource stock for gold. The reasons fQr ore refractoriness and pressure, chemical and

    Jan 1, 1992

  • AUSIMM
    Supergene Enrichment of the Khanong Copper Resource, Sepon Project, Lao PDR

    The Khanong supergene-enriched copper resource, (~23 Mt at 3.0 per cent Cu), is one of several resources recently discovered in the intrusive-centred, sediment-hosted Au-Cu Sepon mineral field located

    Jan 1, 1999

  • AUSIMM
    Design Developments of the Jameson Cell

    By S Bourke, R Stone, B Hill

    Since Jameson Cell flotation technology was first installed in a coal flotation application in 1988/89 at Newlands Coal Handling and Preparation Plant (CHPP) there have been fundamental improvements t

    Jan 1, 2005

  • AUSIMM
    High Pressure Grinding Rolls Scale-Up and Experiences

    High Pressure Grinding Rolls Scale-Up and Experiences

    Sep 13, 2010