Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Development Of A Gas Monitor Simulator And Mine Rescue Contest Field TrialsBy D. W. Alexander
Researchers from the U.S. Office of Mine Safety and Health Research (OMSHR) of the U.S. National Institute for Occupational Safety and Health (NIOSH) completed field trials during coal mine rescue con
Jan 1, 2012
-
Software - Benefits Of Building An Efficient Mine Planning ProcessBy W. A. Wilkinson
Mine planners are under pressure to evaluate the impact of changing economic times and newly acquired data on their mine plans. Incorporating changes such as commodity prices, customer sales, fluctuat
Jan 1, 2010
-
Gypsum In Canada - Present Status And Future Developments (479c4cf0-fa9c-40e9-9981-59c7eddf44b3)By J. H. Fowler
Canada's gypsum industry began over two hundred years ago in the Maritime Provinces when farmers attempted to supplement their incomes by selling "land plaster" to traders bound for the United St
Jan 1, 1987
-
Hunter Valley Coal Rail Network to be optimized by GE Transportation"Australia’s largest rail freight network operator, the Australian Rail Track Corporation (ARTC), has selected GE Transportation’s Movement Planner solution as the key technology enabler for its Hunte
Jan 1, 2018
-
Pawtucket CSO Tunnel Design Build—Construction Project Updates - NAT2024By Irwan Halim, Stephane Polycarpe, Brian Hann
The Narragansett Bay Commission Phase III CSO Program includes construction of the 11,600-foot long, 30-foot ID, deep rock Pawtucket Tunnel in Rhode Island. This paper provides an overview of the Desi
Jun 23, 2024
-
Gravity Concentration - A Process At The CrossroadsBy R. O. Burt
The paper examines the role of gravity concentration in both an historical contest and within the modern mineral processing industry. It discusses the principles of the process on both a theoretical a
Jan 1, 1982
-
Structural Stability Of Large Cavities For Project Payette ? IntroductionBy Keshavan Nair
In connection with Project Payette, which is concerned with the detection of underground nuclear explosions, it was necessary to determine the technical feasibility of constructing and maintaining a l
Jan 1, 1968
-
Tailing Dam Monitoring – Safety Enhancement Through Data Fusion - SME Annual Meeting 2022By J. Kretschmann, A. Müterthies, T. Rudolph, C. Yang, P. Goerke-Mallet
Catastrophic failures of dams and tailing storage facilities (TSF) have triggered the development of integrated ground monitoring concepts for hazard assessment, risk management and public safety. The
Mar 2, 2022
-
Assessment of environmental impact of digging and loading equipment in surface coal mining - SME Transactions 2013By A. Lashgari, V. Kecojevic
This paper presents research on the environmental impact of digging and loading equipment used in surface coal mining. Environmental impact was assessed through the measurement of equipment exhaust an
Jan 1, 2013
-
Geology And Mineralization Of The Santa Rosa Gold Deposits, Panama (db14143c-3c9a-4e78-82ee-0b3a79359f96)By Don C. White
Santa Rosa is a mid-Tertiary, volcanic-hosted, bulk-mineable, open-pitable, heap-leachable, gold-silver deposit. It is the product of hydrothermal mineralization along an arcuate segment of a caldera
Jan 1, 1993
-
Subsidence Over Room and Pillar MiningBy W. M. Ma, Daniel W. H. Su, K. Centofanti, Yi Luo, W. L. Zhong, Syd S. Peng
8.1 INTRODUCTION Under room and pillar mining if the extraction ratio is low, (i.e., < 50%) a pillar can support the overburden without collapse and there will be no surface subsidence whatsoever. In
Jan 1, 1992
-
Chemical And Biological Upgrading Of Stillwater Platinum-Group Metal Converter MatteBy D. L. Langhans
Platinum-group metal (PGM) converter matte from the Stillwater Complex, MT, was subjected to chemical and biological leaching in an effort to upgrade the matte by decreasing the Cu and Ni content. Cop
Jan 1, 1993
-
Threading the Needle: Design and Construction of the Parallel Thimble Shoal Tunnel - NAT2024By Joan Carles Casado Ortega, Mitchell Gerdtau, Sandeep Pyakurel, Eric Crocker, Frank Perrone
The Parallel Thimble Shoal Tunnel (PTST) project is a part of the Chesapeake Bay Bridge- Tunnel (CBBT) complex. The project involves the construction of a two-lane bored tunnel under the Thimble Shoal
Jun 23, 2024
-
Technical Note – Solubility Of Iron In Spent Pickling SolutionsBy R. G. Reddy
Iron solubility's in spent pickling (HFHNO3 -H2O) solutions were determined as a function of HF and HNO3 acid concentrations. A chemical analysis of the industrial pickling solutions and sludges
Jan 1, 1994
-
Modeling Immiscible Gas-Water Flow In Deforming Mining EnvironmentsBy Angelus S. C. Owili-Eger
Although the foundation of a unified treatment of fluid flow in variably saturated porous media was established more than seventy years ago, no serious attempt was made to develop it until the early 1
Jan 1, 1980
-
Engineering Online: Program Development to Address the Educational Needs of the Mining IndustryBy D. Yokom, T. Katsabanis, E. Tremblay
"The mining industry has always faced the problems of replacing retired mining professionals, retaining their knowledge, continuously developing the skills of local talent and employing under-represen
Jan 1, 2017
-
Surface Coal Mine Planning With An Interactive Graphics Personal Computer ProgramBy M. E. Kuchta
Surface coal mine design can be facilitated with the use of an interactive graphics personal computer program. This mineral inventory and planning program (POLY CALC) is described and its use is illus
Jan 1, 1986
-
New Findings On The Reduction Behavior Of Sinter (1b90a217-fbf3-4f2c-8576-810660ec6774)By Klaus Grebe
Recent investigations by Mannesmann Research have shown that disintegration of sinter with widely varying quality levels is subject to a much more complex set of influences than was previously assumed
Jan 1, 1981
-
AMAX Process Evaluation Executive (Apex): A General Purpose Simulator For Computing Steady State Material And Energy Balances Of Metallurgical Process FlowsheetsBy Vishnu S. Gupta
A modular computer program APEX (AMAX Process Evaluation Executive), has been developed at AMAX Extractive R&D, Golden, Colorado to facilitate rapid simulation of steady state material and energy bala
Jan 1, 1980
-
Slope Stabilization At ?El Cerrejon? Coal Mine, Columbia, South AmericaBy M. Jaramillo
The Expanded West Pit of the 15 MTY El Cerrejon Mine will reach a maximum depth of270 m. Slope stability evaluations indicated that this depth, combined with structural complexities, would create a se
Jan 1, 1995