Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Underwater Blast Pressures From A Confinded Rock Removal During The Miami Harbor Deepening ProjectBy Terri Jordan, Gregory Hempen, Thomas Keevin
Water-borne blast pressures from confined blasts were recorded as part of a submerged blasting program in Florida for channel deepening. The blasting was confined within the rock floor by stemming. Sh
Jan 1, 2007
-
Method of Blasting Using Air Tubes Charged in a BlastholeBy Dae-Woo Kang, Sang-Wook Kim, Shin Lee
The Air-tubes blasting method is provided in which a series of aligned boreholes are charged with explosive s and air tubes in a predetermined blasting pattern. The air tube is composed of cylindrical
Jan 1, 2005
-
The Thermal Basis for Explosive Decomposition with Heat due to External heating or reactive groundBy Alastair Torrance, Gary Cavanough
Over the past two years a research project has been performed on reactive and hot ground. A key finding is that host materials including carbonates and coal are inhibitors to the reaction of sulphide
Jan 21, 2025
-
Advanced Blasting Optimization for Enhanced Productivity: The X-2Mill SolutionBy Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Martínez, Juan Navarro
This study introduces the X-2Mill solution, a refined two-step methodology aimed at optimizing blast designs by aligning explosive energy with rock properties. The approach employs the X-4Traits Model
Jan 21, 2025
-
Western Europe's Largest Underground BlastBy P McConnell, T Garrigan
Tara Mines Limited, in Ireland, is Western Europe's largest zinc mine. Annual metal production, from 2.5 million tonnes of ore, consists of 180,000 tonnes of zinc and 34,000 tonnes of lead.
Jan 1, 1989
-
Inco Limited Upper Blind Slot Raise 8M (25') to 12M (40') Longhole Carbide Drilling (L.C.D.) MethodBy Steven Richardson, E A. Cameron, Reza "Ray" Jambakhsh
This paper outlines the design and implementation of a method to use Long hole Carbide drilling to blast an "Upper Blind Slot Raise" in the range of 12m (40 ft).
Jan 1, 1992
-
Blasting for the Enhanced Western Groundwater Extraction System - Modern LandfillBy Jay Smerekanicz, Florin: Pedersen Gheorghiu, Alan Cameron
In order to expand the capacity of Modern Landtill, a groundwater extraction system consisting of a linear system of pumping wells over 2,700 feet long had to be replaced. The new system would be cove
Jan 1, 2001
-
Efficient Blasting for Bench Stability and Fragmentation Results ImprovementBy Javier Illanes Pizarro, Gustavo Huerta Valer, Jorge Cárdenas Miranda
Bench stability is the basis of sustainability in an open pit mining operation. Taking care of the pit walls while maintaining fragmentation results can prove a challenge. In this study, technical pro
Feb 6, 2023
-
Blasting Topologies for Electronic Initiation SystemsBy D. Lansburg
Electronic detonators are increasingly being used in today’s blasting in quarries, seismic, surface and underground mines. Electronic detonators offer several distinctive features over electric and no
Jan 1, 2011
-
Modern Underground Raise and Slot DesignBy N. Rouse
Underground raises and slots are a vital part of underground blasting operations. Raises and slots are vertical shafts or openings used for ventilation, ore passes, or creating voids in stopes. In the
Jan 1, 2024
-
Rock Fragmentation Prediction Using Machine LearningBy Ankit Jha, RICHARD AMOAKO
In this paper, we examine the challenges associated with the use of empirical rock fragmentation models. We highlight key parameters omitted by these models, and propose a machine learning approach th
Feb 1, 2020
-
Blasting, Material Flow & Ore Dilution in Sublevel Cave Mining; State-of-the-Art ReviewBy Ayman Tawadrous
Cave mining offers a flexible technique to exploit large, low grade, deep ore bodies with low operating costs. It is typically done in either a top down approach; i.e. sublevel caving, or in a bottom
Jan 1, 2015
-
Performing decking with the use of an inflatable plug in high or total submergence applications in blastholes to improve final wall profile & stabilityBy Glenn Tobin
The overarching goal in modern drill and blasting operations is that of optimising mining operations to achieve higher levels of productivity, safety, profitability and sustainability. Air decking, a
Jan 1, 2012
-
Blasting Near a CrusherBy Scott G. Giltner, Alex Schwenk
Blasting within 250 ft of a crusher was successfully executed through the application of electronic detonators, 3-D imagery, signature hole analysis, custom loading of blast holes. The blast was well
Feb 1, 2020
-
Valdez, Alaska Glacier Point Quarry – One Shot / One Chance for SuccessBy Billy Rosseau, Mike Cammack, Richard O’Meara, Gustavo Azpilcueta
During the summer of 2014, the U.S. Army Corps of Engineers (USACE) sought proposals to vastly improve and expand the small boat harbor in Valdez, Alaska. It would be a multi-year project, and constru
Jan 1, 2017
-
Fragmentation Mill Throughput Improvement Through a Dual-Salt Sodium Nitrate Emulsion ProductBy Khushaal Popli, Vanessa Roeland, Brian Hall, Carl Diederichs
Highland Valley Copper (HVC) has embraced an integrated Mine to Mill approach to comminution since the late 1990s. Previous blasting optimization was carried out through adjustments to blast pattern g
Feb 6, 2023
-
Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel CavingBy Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro
This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit
Feb 1, 2020
-
Blasting Conditions Couldn't be WorseBy John Atkinson, Steve Repola
This paper will describe two blasting plans that have been developed for American Aggregates' Marble Cliff Quarry located near Columbus, Ohio. Two different limestone formations are mined on different
Jan 1, 1993
-
Blasting Next to an Unsupported Road using Electronic DetonatorsBy Tony Rorke, Sydney Thabethe
A large overburden blast was carried out at Douglas Colliery, Middelburg Mine Services, close to a national road in South Africa. The road is a busy route between Witbank and Bethal and damage to the
Jan 1, 2004
-
Signature Hole Analysis and Vibration Modeling: An Indonesian Case StudyBy Wawa Jaka Sungkawa, Slamet Rachman Jaka, Tom Dermody
A project was undertaken to research and develop a method to confidently predict vibration. It was decided that the scaled distance formulas were not adequate to predict vibration when using non-elect
Feb 1, 2020