Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - Summary
By Francis D. Leathers
Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform
Jan 1, 1994
-
Design And Construction Of A Cut-Off Wall In Warm Permafrost
By Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010
-
A Unique Solution To Mitigate Movement At The Jefferson Memorial Seawall
By Jesús E. Gómez
In the Summer of 2011, emergency repairs to the Jefferson Memorial North Plaza and Seawall were completed. These repairs were necessitated by settlement and lateral movement of the seawall and North
Jan 1, 2011
-
Dynamic Monitoring And Analysis Of Pile Foundation Installations ? Introduction
By Patrick J. Hannigan
The pile foundation designer typically performs a subsurface exploration program and static pile capacity calculations before selecting a pile foundation type, length, and capacity. During constructio
Jan 1, 1990
-
Downtown Seattle Transit Project - International District Station
By Richard K. Sandaas
Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th
Jan 1, 1990
-
Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? Introduction
By Daniel L. Hanson
This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently
Jan 1, 1994
-
A Comparison Of Open Drilled Shafts To Temporarily Cased Drilled Shafts In Clay Soil
By W. Tom Witherspoon
Many Engineers are skeptical and cautious about skin friction factors for the portion of drilled piers where temporary casing is used. This has led Texas engineers in many cases to eliminate skin fric
Jan 1, 2009
-
The World In Steel Sheet Piling ? Synopsis
By M. Dondelinger
This paper presents a comprehensive review of steel sheet piling including internationally manufactured hot rolled sections, their history, applications, installation and driving techniques. The di
Jan 1, 2010
-
A Historic Capitol And A Deep Excavation
By Richard F. Sliwoski
The Virginia State Capitol was designed by Thomas Jefferson and constructed in 1785. The Capitol is of great historic and architectural significance to not only the Commonwealth of Virginia but to the
Jan 1, 2006
-
Response to Load for Four Different Types of Bored Piles
By Mario Terceros H., Bengt H. Fellenius
"ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore
Jan 1, 2014
-
Analysis Of Strain-Dependent Concrete Modulus From Mass Instrumented Test Pile Samples
By Lee Sieng Kai
This paper presents the result of the analysis of strain-dependent concrete modulus from full-scale static axial compression load tests conducted on more than 200 instrumented cast-in-place barrettes
Jan 1, 2006
-
Present To Future Design Considerations Of Deep Foundations ? 1. Introduction
By William S. Gardner
It is certainly an honor to have been invited to address the Deep Foundation's Annual Meeting on such a vast and weighty topic as "Present to Future Design Considerations of Deep Foundations." Ac
Jan 1, 1991
-
Combined Loading Tests On Large Diameter Piles
By A. Lyndon
Combined loading tests are described to three 1.2m diameter cast-in-place bored piles, 12m long, formed through cohesionless material into stiff sandy clay. The maximum loading conditions imposed at t
Jan 1, 1989
-
Structure Support on Laterally Swept Piles
By Morgan L. Race, Matthew R. Glisson
"Most driven pile projects have plumbness limits from 0.25 in/ft (21 mm/m) to 0.5 in/ft (42 mm/m) to control bending stresses. For two projects, the project teams performed static load testing to eval
Jan 1, 2017
-
Pile Design, Testing, And Installation For A Gated Dam ? Synopsis
By B. H. Moore
The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori
Jan 1, 2010
-
Seismic Hazards Evaluation and Lateral Pile Design in Diatomaceous Earth
By Arash Khosravifar, Matt Steffan
An expansion of the City of Klamath Falls Wastewater Treatment plant required geotechnical seismic hazard evaluations and deep foundation design. The site is located on the shore of Lake Ewauna and is
Jan 1, 2018
-
Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:
By Robert W. Bergwall
The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T
Jan 1, 1997
-
Discussion of Differences in Design Methodology between Granular and Grouted Inclusions
By Brandon Buschmeier, Frederic Masse
"Inclusions are a type of ground improvement that provide an improvement of a soil mass by insertion of a material with better characteristics than the surrounding soils. There are primarily two types
Jan 1, 2015
-
Design-Build Support Of Excavation For Block 76, Salt Lake City, Utah
By Rick Deschamps
The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake
Jan 1, 2009
-