Installation And Testing Of Instrumented Tieback Anchors - IntroductionBy Joan Stoupa
The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili
Jan 1, 1990
-
Spin-Fin Pile TechnologyBy Dennis Nottingham
Spin-fin pipe piles can develop large loads in tension, thus have evolved as a foundation product of great potential. Currently, over 500 spin-fin piles have been used successfully in dolphins, docks,
Jan 1, 1990
-
The Challenges Of Construction In Karstic Limestone: Three Major Case HistoriesBy Donald A. Bruce
The construction of major structures in karstic limestone terrains poses difficult problems to designer and contractor alike. This reflects the inherent variability of such conditions, and also the si
Jan 1, 2002
-
Influence Of Urbanization And Geology On Deep Foundation Design And ConstructionBy Hiren J. Shah
The urban environment and geology create unique challenges for design and construction of deep foundations. The effect of these is prominently experienced in New York City. Three such project case his
Jan 1, 2011
-
Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based InclinometersBy Peter Chou
A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st
Jan 1, 2009
-
New Technology of Force Monitoring of Post-Tensioning Ground AnchorsBy Shahid Islam, Lucian Bogdan
There is a rapid expansion of world’s infrastructure and simultaneously existing infrastructure is aging. The maintenance of infrastructures has been of particular concern to the engineering community
Jan 1, 2018
-
RD Pile Wall – A Water Tight Retaining Wall StructureBy Antti J. Perala, Teemu J. Yli-Kovero
"Efficient use of land is constantly requiring more underground construction. Minimized execution time and disturbance to surroundings and nearby structures are essential benefits for all construction
Jan 1, 2017
-
Displacement Dependent Stiffness And Damping Constants Of Pile GroupsBy Shamsher Prakash
Equivalent spring constants for analysis of footings is a function of Young's modulus of pile material (Ep), shear modulus of soil (Gs), and geometry of the footing and/or piles. Shear modulus is
Jan 1, 2002
-
Design and Installation of Gudrun Platform Jacket PilesBy Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr
"Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall
Jan 1, 2014
-
Analysis of the Uncertainty by the Random Finite Elements Method of a Vertical Load Test of a Piled Raft Founded in Tropical SoilBy Cristhian C. Mendoza, Renato da Cunha, Bernardo Caicedo, Max Barbosa
"Abstract This paper shows that a raft alone is not sufficiently appropriate to address the uncertainty of underlying soil variability; therefore, a piled raft system is a better option for mitigating
Jan 1, 2014
-
Evaluating Efficiency of Geo5 in the Analysis of Pile FoundationBy Elizabeth Varghese, Sanket Rawat, Prachuryya Kaushik, Ravi Kant Mittal
"Geo5 Software is gaining popularity worldwide due to its expediency in analysis and design of pile foundation. The analysis is based on various theoretical, empirical and semi-empirical methods avail
Jan 1, 2017
-
Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley SiteBy Gyimah Kasali
Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)
Jan 1, 2002
-
A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test ResultsBy Richard D. Short
The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field
Jan 1, 2000
-
An Investigation of Grouted Pile Capacity Using Instrumented Pile Load TestsBy Hayel M. El-Naggar, Sherif A. Akl
Although grouted piles have been used for several decades since the idea was proposed in the 1970s, their design is mostly based on experience and unpublished proprietary methods. There is little rese
Jan 1, 2018
-
I - 280 / San Francisco Pile Load Test Results And Seismic Design Guidelines - 1. Earthquake Loading Of Structures - A Brief Overview - 1.1 The 1989 Loma Prieta Earthquake - 1.1.1. CSMIP Records - Recorded Time-History DataBy James A. Mason
The State of California has instrumented numerous buildings, bridges, and dams throughout the state with earthquake recording devices. These accelerometers are strategically placed to measure the resp
Jan 1, 1993
-
Interlocking H-Sections For Cofferdams Resist High PressureBy Marc Dondelinger
Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca
Jan 1, 1985
-
Secant Pile Walls - Design, Construction And Case HistoryBy Ketan H. Trivedi
This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile install
Jan 1, 2006
-
Doyle Drive - Extreme Pile InstallationBy Peter Faust
The foundations for the new South Viaduct Bridge in San Francisco were extremely challenging due to the requirement for very large and deep piles installed adjacent to historic structures. Drilled sha
Jan 1, 2011
-
The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. LouisBy Dan A. Brown
The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia
Jan 1, 2011
-
Design And Construction Of A Cut-Off Wall In Warm PermafrostBy Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010