Predicting Carbonation of Concrete in TunnelsCarbonation of reinforced concrete is a potential durability issue for vehicular tunnels. This is particularly the case where elevated carbon dioxide concentrations exist and when the design life is 1
Jan 1, 2008
-
Project Management Procedures Adopted for Control of the Engineering Aspects of the Melbourne Underground Rail Loop ProjectBy Smith G. A
The scope and complexity of the Melbourne Underground Rail Loop Project and the budget restraints on the planning, design and construction of the works necessitated sound manage- ment procedures fo
Jan 1, 1981
-
Northern New Caledonia High-Pressure Metamorphic Core Complex; from Continental Subduction to Extensional ExhumationBy J Aitchison, G Clarke
A reappraisal of the stratigraphy, new regional kinematic analysis and thermobarometric data allow a new interpretation of the metamorphic zoning and tectonic structure of the Upper Eocene high-pressu
Jan 1, 1995
-
Rapid Sealing with Parachute StoppingsBy Buizen M, Eagleton A. C
The results of calibration trials conducted on parachute stoppings both overseas and in Australia under a recently completed NERD&DC grant, are presented. Applications of parachute stoppings, for
Jan 1, 1988
-
Construction CostsBy Cerutty L
To those who have been engaged in the construction of mining and metallurgical plants during the war and post-war periods, it is quite unnecessary to point out the large increases and violent fluctuat
Jan 1, 1922
-
Technical and Economic Coparison of Gaseous Based Direct Reduced Iron (DRI) Production TechnologiesCurrently there is considerable interest in the production of DRI in Western Australia to take advantage of intense interest from the Asian market. Most DRI is produced using gas-based processes and
Jan 1, 1996
-
Fold and Fracture Patterns Resulting from Basement Wrenching in the Fitzroy Depression, Western AustraliaWrenching between basement blocks is considered to be the mechanism whereby a well developed set of en echelon folds and an associated fracture system are developed in the Fitzroy Depression, Western
Jan 1, 1967
-
Modern X-Ray Diffraction Methods for Process Optimisation in the Minerals Industry û Case StudiesBy S M. C Verryn
Through the application of the Rietveld method, X-ray diffraction analysis has developed into a fully quantitative method for phase analysis of metallurgical products. The Rietveld method itself has p
Jan 1, 2008
-
Determination of Noble Metals at Crustal AbundancesBy Ryan CG, Cousens DR, Suter GF, Griffin WL
A novel method utilizing PIXE with microbeams following fire-assay has been developed to determine PGE and Au at sub-ppm levels suitable for application in exploration. Analyses of the prills from
Jan 1, 1989
-
Selective flocculation of hematite and silicaBy C A. Thomas, J C. Eardley, G V. Franks
As valuable minerals are more disseminated, there is a need for low-grade ores to be finely ground to liberate these valuable minerals. However, this has a negative impact on ultrafine mineral recover
Aug 24, 2022
-
Real-Time Image Analysis of Size and Shape Distributions of Rock FragmentsAn image analysis system has been built which automatically digitizes camera input of rock fragments, analyses the digitised data to determine the sizes and shapes of the rock fragments, and outputs
Jan 1, 1988
-
Some Aspects of the Manufacture of Portland CementPortland cement is a finely ground mineral powder obtained by intergrinding a mixture of 95 parts of clinker and five parts of gypsum. It is the generic name for hydraulic cement a man made product wh
Jan 1, 1978
-
Accounting and Costing at the Broken Hill Associated Smelters Proprietary Ltd. Works, Port PirieAs this paper is being written primarily for perusal by milling workers, metallurgists and engineers, an attempt will be made to avoid the use of accounting technicalities. Its scope will be confined
Jan 1, 1922
-
Mining of the Fitzpatrick Orebody, North Mine, Broken Hil, NSWBy Kidman B. E
The Fitzpatrick area is the deepest section of the North Mine, with the orebody located between 1450 and 1800 m below the surface and some 600 m NE of the main No. 3 Shaft orebody and separated fr
Jan 1, 1988
-
Optimisation & Control Development For An Expanded Grinding Circuit In NHBC ConcentratorBy Marsham B, Baker D. C
The expansion of New Broken Hill Consolidated Limited (NBHC) concentrator necessitated the installation of hydrocyclone classifiers where rake classifiers had previously been used. Commissioning o
Jan 1, 1983
-
Fires in Metalliferous MinesAs a number of underground fires have unfortunately happened in the Broken Hill mining district, the writer trusts that a paper dealing with such a subject may prove of interest. To simplify matters,
Jan 1, 1911
-
Using Value at Risk for Integrated Project Risk EvaluationBy W Stange
Assessing the risks in a mining project is a key aspect of project evaluation. This is an exacting and demanding task because of the complexity due to the need to deal with uncertainty over long time
Jan 1, 2009
-
Installation of 17 Cubic Metre Flotation Cells at North Mine, Broken HillBy Harris HR
This paper documents the selection, installation and performance of six, seventeen cubic metre, Dorr-Oliver flotation cells for primary zinc flotation at the North Mine in Broken Hill. The cells wer
Jan 1, 1988
-
Optimum Determination of Sub-Grade Stockpiles in Open Pit MinesDepending on material commodity market conditions, material contained in open pit waste disposals can hold potential value, Segregating subgrade material into separate disposals i.e. 'sub ore&apo
Jan 1, 1988
-
The Mathematical Modelling of Rock Fragmentation by High Pressure Arc DischargesThe mathematical modelling of rock fragmentation by blasting is one of the most difficult and challenging problems of applied mathematics. Not only is complex mathematics required but there is incom
Jan 1, 1990