Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Computational Simulation for Mineral Processing

    By Jancar T, de Guzman M M, Matthews B, Tu J. Y

    The use of computational simulation to predict the performance of existing equipment or for the design of improved mineral processing equipment will be referred to as Computational Mineral Processi

    Jan 1, 1995

  • AUSIMM
    VHMS Deposit

    By Georgi H, Farquhar J. W, Lorrigan A. N

    The potential for major new lenses of Volcanic Hosted Massive Sulphide (VHMS) beneath the existing Rosebery Deposit is extremely high. Recent deep drill hole intersections of massive sulphides, inc

    Jan 1, 1993

  • AUSIMM
    Mining and the Environment

    Opinions vary widely within the community on what are legitimate environmental social respon- sibilities. The extreme conservationists see the responsibility as the total preservation of the natura

    Jan 1, 1978

  • AUSIMM
    Profitable and Productive Partnerships ù Optimising Coal Recovery in Close Proximity to the Hunter River

    By D Stacey, J Matthews

    Hunter Valley Operations in partnership with Orica Explosives designed a process to optimise coal extraction at depths greater than 65 m below the Hunter River in a safe and cost effective manner. The

    Jan 1, 2001

  • AUSIMM
    QPM hematite by-product as an ironmaking feed material

    By G Reynolds, L Lu

    Queensland Pacific Metals (QPM) is developing its flagship Townsville Energy Chemicals Hub (TECH) facility to produce nickel and cobalt sulfates from imported high-grade nickel laterite ore for nickel

    Sep 18, 2023

  • AUSIMM
    When Nothing is What You Need – The Importance of Using Blanks at All Stages of Sample Preparation

    By J Webb

    "It is vitally important in projects where the cut-off grade is low that there is no contamination during the sampling and sample preparation process, both in the ore and the waste zones. Failure to i

    Jul 29, 2014

  • AUSIMM
    The Consequences for Pillar Stability of Zero Confining Stress Brought about by Forced or Natural Drainage

    By I Gray

    This paper examines the effects of the changes in stress that a coal may undergo as part of the drainage process. As a consequence of this, some coal seams will come to the situation that they have ze

    Nov 5, 2014

  • AUSIMM
    A Critique of the Push-Pull Hybrid Ventilation System

    By A S. Derrington

    This paper describes a hybrid ventilation system, which uses secondary fans that also act as de-facto primary fans to extract fresh airflow from the mine intake raise system. Also discussed are the as

    Jul 1, 2013

  • AUSIMM
    Dingo – an optimisation tool to solve complex short interval control at Telfer underground mine

    By S Graskoski

    The allocation of boggers and trucks at Telfer’s sublevel cave mine is currently assigned by manual techniques, with decision-making primarily dependant on the judgement of the operators and mine cont

    Oct 16, 2017

  • AUSIMM
    The McArthur River Project (734176fa-ffb4-43c7-95c3-495d0f273632)

    The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/

    Jan 1, 1984

  • AUSIMM
    Vaporization During the Combustion of a Complex Copper Concentrate

    A laminar-flow furnace technique was used to study the combustion of 37-53 µm size fraction of Woodlawn copper concentrate containing 7.4 per cent zinc, 5.0 per cent lead and 22.5 per cent copper

    Jan 1, 1985

  • AUSIMM
    The Introduction and Application of Carbon-in-Pulp in a Heap Leach Project

    By Mann LD

    The Haveluck gold deposit, located 2.5km north of Meekatharra, contained 1,284,000 tonnes at an average grade of 1.8 g/t gold of drill delineated proved and probable ore prior to commencement of pro

    Jan 1, 1982

  • AUSIMM
    The Effect of Detonating Fuse Downlines on Ammonium Nitrate/Fuel Oil Charges

    The effects of detonation of downlines and downline-booster systems on lodse-poured charges of 94% porous prilled ammonium nitrate/6% fuel oil (AN/FO) were determined. Detonation stability was indica

    Jan 1, 1970

  • AUSIMM
    Quantitative Mineral Analysis of Ores and Minerals Processing Products using X-ray Diffraction

    Characterising the weight percentage of each mineral in base metal ores is an integral part of assessing the quality of an ore in terms of its processing properties. The Rietveld method, which uses X-

    Jan 1, 1998

  • AUSIMM
    The Porgera Gold Deposit, Papua New Guinea: The Influence of Structure and Tectonic Setting on Hydrothermal Fluid Flow and Mineralisation at a Convergent Plate Margin (16186b1d-6c25-4af8-9364-e7daeb6b3e56)

    The structure and tectonic setting has had a strong influence on gold mineralisation at the Porgera gold deposit. Here, the structural controls on the mineralisation at Porgera are discussed and plac

    Jan 1, 1995

  • AUSIMM
    Mining Reconciliation in Long Hole Open Stopes at George Fisher Mine

    By J J. Grobler

    The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified

    Mar 21, 2011

  • AUSIMM
    Stope Performance at Olympic Dam Mine

    By M J. Pascoe

    The performance of 460 stope surfaces at WMC ResourcesÆ Olympic Dam Operation (ODO) has been used to investigate the confidence that can be placed in the Stability Graph Method for design of stope dim

    Jan 1, 2005

  • AUSIMM
    A Survey of Stores Operations at Broken Hill Associated Smelters Pty. Ltd.

    An efficient stores organisation is essential for an efficient undertaking. Unless the stores organisation is able to meet the requirements of its requisitioners promptly and economically, the underta

    Jan 1, 1951

  • AUSIMM
    Evaluation of the Effects of Organic Matter on the Net Acid Generation (NAG) Test

    By S Miller, R Smart, J Thomas

    Single-addition and sequential net acid generation (NAG) experiments were carried out on natural and prepared samples with varying contents of organic matter and pyritic S. Results show that carbonace

    Jan 1, 2003

  • AUSIMM
    The use of the Main Ramp as a Mine Exhaust at the Kencana Mine, Indonesia

    By D J. Brake

    Faced with the need to improve workplace conditions in both its development and production headings in its existing K1 orebody, as well as its new K Link and K2 orebodies, the Kencana mine in Indonesi

    Mar 21, 2011