Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    In Situ X-ray and Neutron Diffraction Studies of Silico-Ferrite of Calcium and Aluminium Iron Ore Sinter Phase Formation

    By M I. Pownceby, N A. S Webster, A J. Studer, I C. Madsen, J A. Kimpton, M J. Fisher-White, L Lu

    In situ synchrotron X-ray and in situ neutron diffraction-based experimentation have been implemented to characterise the formation of the complex calcium ferrite iron ore sinter bonding phases silico

    Aug 12, 2013

  • AUSIMM
    Rehabilitation of Pasminco Broken Hill Mine North Operation

    By J Burgess, G Scanlan

    In 1993 after over 110 years of mining operations, production ceased at the Broken Hill North Mine. Following the cessation of operations a rehabilitation program was developed to satisfy the requirem

    Jan 1, 1998

  • AUSIMM
    Deoxidation of Ti-Ni alloy by the calcium and CaF2-MgCl2 flux

    By K S. Park, J K. Kim, J H. Park, Y Su

    The present study investigates the possibility of the direct removal of oxygen from the Ti-30Ni (wt per cent) alloy melt through the thermodynamic equilibrium reactions at 1623 K in the vertical tube

    Aug 21, 2024

  • AUSIMM
  • AUSIMM
    Statistics in the Study of Ventilation Problems

    Multiple regression analysis applied to ventilation records of stopes on the Witwatersrand showed that it was possible to estimate the temperature increase per 100 ft for a new stope with a standard d

    Jan 1, 1962

  • AUSIMM
    A Simultaneous Optimisation Tool for Open Pit Mine Scheduling

    By Y Ren

    The algorithms employed by the commercial tools are either heuristic algorithm or iterative optimisation of a subsystem. This often results in a suboptimal schedule. In this paper, the author presents

    Sep 26, 2013

  • AUSIMM
    Frother Analysis ù Procedure and Plant Experience

    By F Cappuccitti

    A colourimetric technique, originally developed for methyl iso butyl carbinol (MIBC) based on the Komarowsky reaction, has been extended to a wide range of common mineral flotation frothers. The proce

    Jan 1, 2005

  • AUSIMM
    Process Integration and Optimisation - A Case Study in Productivity Improvement

    By J Col, D La Rosa, W Valery, A Jankovic

    Metso Minerals Process Technology Asia-Pacific and South America (MMPT) has been working with operations around the world to increase their efficiency through æMine-to-MillÆ or Process Integration and

    Jan 1, 2007

  • AUSIMM
    Peak Gold Mine - A Different Approach to Underground Mining

    By R H DAVIES

    Peak Gold Mine is a new gold and base metal mining project being developed by Enterprise Metals (a 100 per cent subsidiary of CRA) at Cobar in the centre of New South Wales. The Cobar district has a

    Jan 1, 1992

  • AUSIMM
    Determination of the Transition Point from Open Pit to Underground Mining

    By A K. Ghosh, J Chung, E Topal, M Asad

    "Many open pit (OP) mines with considerable vertical extent are approaching the end of their life-of-mine; some of them are seeking the opportunity to make the transition from OP to underground (UG) m

    Nov 15, 2016

  • AUSIMM
    An Overview of the Weathering Process, Preliminary Density and Unconfined Compressive Strength Correlations for Fresh Itabirites in Vale Mines on the Western Side of the Iron Quadrangle, Brazil

    By E A. G Marques, P M. Dight, T A. V Costa, K Mercer

    Brazilian banded iron formation (BIF), known as ‘itabirite’, is the main host rock for iron ore in the Iron Quadrangle mines, Brazil. Their geneses are controversial and it is agreed that diagenetic,

    Jul 13, 2015

  • AUSIMM
    Mine productivity and equipment selection impacts with operational grade engineering

    By A F. von Wielligh, M Scott, L Keeney

    Operational Grade Engineering (GE) is the early (pre-processing) discard of low-grade mineralised and/or barren rock to improve the ore grade and/or reduce deleterious elements within the run of mine

    Nov 10, 2020

  • AUSIMM
    Characterisation of SFCA phases in iron ore sinter by combined optical microscopy and electron probe microanalysis (EPMA)

    By M I. Pownceby, S Hapugoda, H Han, E Donskoi, L Lu

    Iron ore sinter mineralogy and its associated macro-/micro – structure has a strong impact on sinter quality. At a macroscopic scale, sinter ideally consists of a strong, porous matrix which bonds rel

    Nov 8, 2021

  • AUSIMM
    Environmental Geotechnics in Spoil Dump Design for Erosion Management - A Probabilistic Approach

    By J S. Kuszmaul, T O. Aspinall

    The applicability of environmental geotechnics for erosion management is increasing in importance worldwide. The environmental impact of mining and evolving environmental legislation has been receivin

    Jan 1, 1998

  • AUSIMM
    The production of green steel using Hismelt

    By N J. Goodman

    The HIsmelt technology was developed and proven in Western Australia (WA) after more than 30 years and several billion dollars of research and development. The HIsmelt technology was transferred to Ch

    Nov 8, 2021

  • AUSIMM
    Fimiston Open Pit

    By Neill A, O&apos

    The City of Kalgoorlie/Boulder is situated approximately 600 kilometres to the east of Perth (Fig. 1), and is the major regional centre of the Eastern Goldfields, supporting a population of approxim

    Jan 1, 1991

  • AUSIMM
    The Development of Models in Minerals Processing

    By I Cameron

    Simulation is increasingly being used to analyse mineral processing operations and explore efficiency options. Engineers that use simulation are rightly concerned with the quality and applicability of

    Jan 1, 1998

  • AUSIMM
    Mineralisation of the Tom's Gully Gold Deposit, Northern Territory

    By Mizuta T, Sakurai M

    The Pine Creek Inlier produced 12 440 kg of gold in the period from the first gold discovery in the 1860s to the early-1900s. During the 1930s renewed large-scale prospecting took place and gave a

    Jan 1, 1994

  • AUSIMM
    Statutory Compliance of Sealing Plans and Information Required by Queensland Industry Regulators

    Following the Moura No 2 Wardens Court of Inquiry and subsequent changes to the Queensland Mining Legislation there is a requirement in Queensland coal mines for: a person with the recognised competen

    Jan 1, 2005

  • AUSIMM
    Undersea Tunnel Design with Reference to the Channel Tunnel

    Design and construction techniques used to develop two highway tunnels in inaccessible mountainous terrain are described. Measures used to adapt the design to the unusual geology and topography are

    Jan 1, 1976