Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A new look at detrital iron deposit geology of the Hamersley Province of Western AustraliaBy C Simpson, J M. F Clout, G Plummer
Detrital iron deposits (‘DID’) in the Hamersley Province of Western Australia have been successfully mined and processed as small quantities of saleable standalone or blended lump and fine ore product
Nov 8, 2021
-
Tunnelling Projects in SingaporeBy A J. Burchell
The introduction reviews the tunnelling carried out in Singapore since the early 1980s. Between 1983 and 1990, Phases 1 and 2 of the mass rapid transit system were constructed. These included some 20
Jan 1, 1999
-
A Flotation Study for Effective Separation of the Heavy Mineral SandsBy Takiuchi T, Kurita M, Owada S
This paper describes the possibility of the application of flotation to the separation of monazite from xenotime and of columbite from ferberite, which have been said to be difficult with generally
Jan 1, 1993
-
Chamfered backs to improve open stope stability in poor ground conditionsBy G Capes
A novel open stope design approach is presented that delivered improved performance in a mining area with poor ground conditions at the Olympic Dam mine. During 2019, a large open stope had an unplann
Mar 29, 2023
-
Bias Testing of Mechanical Sampling Systems for Coal - A Review of Test Results and Call for Use of Multivariate Statistical AnalysesBy C D. Rose
A review and summary of the results of 120 coal sampling system bias tests is presented. This review supports new methodology using multivariate statistics currently being considered by ISO TC27 SC4.
Aug 21, 2012
-
Potential and Applications of Underground In Situ BioleachingBy R Schlueter, H Mischo
The mining industry is facing a variety of geological, technological and social challenges. Future deposits show a general tendency towards increasing depth with complex ores and decreasing grades. On
Nov 4, 2015
-
Modelling Dust Plume Movement Resulting from Surface Blasting OperationsBy S Bhandari
A model for predicting dust plume dispersion from blasting operations using the Eulerian mathematical algorithm has been developed. This model considers atmospheric stability, and wind velocity and di
Nov 8, 2011
-
Mine to Mill Reconciliation - Three Case StudiesBy J T. Carswell, N A. Schofield
Fluctuations in periodic reconciliations between the mine and the mill are an expected and common experience in mining and processing operations. These fluctuations are caused in part by errors in the
Nov 20, 2012
-
Learning from and managing a significant saprolite instabilityBy M Bouare, C Holland, K N’Diaye
Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant
Jun 22, 2022
-
ShovelSense measuring grade at bucket resolution – the new tool in the mine geologist toolboxBy F Faraj, M Pal, M Haest, M Bradshaw, H Lang, K Hume
MineSense Technologies Ltd. is revolutionising grade control at mining operations by installing ShovelSense® sensors on buckets that measure the grade of every load before it is dumped in the truck. T
Mar 22, 2022
-
Enough is Enough ù Environmental Fallacies Confronted by the Mining IndustryFor too long we, as an industry, have borne the brunt of irrational claims, poor science and even worse, journalism with regards to our affect on the environment. To some of us, the overwhelming media
Jan 1, 2004
-
Mine to mill study – Bond Work index as factor for intrusive and non-intrusive rock typeBy W F. E Ouedraogo
This study data has been collected on a three-month period from November 2020 to January 2021 and based on three different pits: Vindaloo Main, Vindaloo Central and Bouere. Both pits having specific g
Jun 22, 2022
-
Application of Design Concepts and Engineering Controls Necessary to Deliver Well-designed and Rehabilitated LandformsBy T Leidich, M Van Zyl, H Lacy
Mining ‘as usual’, until the most recent decades has resulted in limited landform planning and a general lack of mine waste landform design. Material characterisation, mine planning and dedicated prof
Jul 16, 2014
-
Backfilled Pits – Laboratory-scale Tests for Assessing Impacts on Groundwater QualityBy C Linklater, J Chapman, A Watson
Closure options under consideration at some sites include backfilling mined-out pits with waste rock. Backfill may include mineralised and non-mineralised waste rock. Following groundwater rebound, fl
Jun 28, 2016
-
Effectively Installing and Commissioning Flotation EquipmentBy B Murphy, J L. Heath
Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th
Sep 1, 2014
-
Mining-RoX – Mobile Robots in Underground MiningBy H Mischo, M Ferber, M Donner, B Jung, S Grehl, A Dietze
Mobile robots have been making impressive inroads in a variety of domains. Within the Mining-RoX project, Technical University Bergakademie Freiberg is exploring a further frontier for mobile and auto
Nov 4, 2015
-
Implementation of a High Energy Dissipation Ground Support SchemeBy E Villaescusa, A Kusui, R Talebi, R Hassell, C Arcaro
Northern Star Resources (NSR) operates several seismically active mines as part of its Kalgoorlie Operations. In order to successfully continue mining at depth in increasing stress conditions, strateg
Mar 15, 2021
-
DeGrussa Copper Mine – mine closure experienceBy M Bellamy
The DeGrussa copper deposit was discovered by Sandfire Resources in April 2009. Construction of the 1.6 Mt/a concentrator, open pit and underground mining operations commenced in March 2011 with first
Mar 29, 2023
-
Life-of-mine Planning Tools for a Changing Climate – Intuitive, Interrogative, IterativeBy M Grigorescu, S Crimp, J H. Hodgkinson, P Kokic, W Jin
Mines are typically located in remote, inhospitable locations and movement of materials between site, processor and port are often at risk from extreme weather events. Mining companies have recorded m
Jun 28, 2016
-
The Evolution of Wall Control Programs at Kidston Gold MinesBy A Marton
Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega
Jan 1, 2001