Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dilution, Ore Grade and Blast Movement Calculation Model

    By I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite

    This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope

    Aug 24, 2015

  • AUSIMM
    KEYNOTE: Back to the Future – Still on the Dark Side

    By P D. Munro

    "This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and

    Oct 10, 2016

  • AUSIMM
    Bituminous Geomembranes in Mine Construction

    By R McIlwraith, B Breul

    "This paper discusses the successful use of bituminous geomembranes (BGMs) in mining applications since their development in 1974. It explains and illustrates the structure of a BGM composite, which i

    Jul 27, 2015

  • AUSIMM
    New risk assessment method for coal mine excavated slopes

    By I Canbulat, J Oh, A Mcquillan, D Payne

    This paper presents a new risk assessment tool for coal mine excavated slopes. This new empirical-statistical Slope Stability Assessment Methodology (SSAM) is intended for use by geotechnical engineer

    Nov 30, 2018

  • AUSIMM
    Optimal slope profiles for maximum mine pit-wall steepness in banded iron formation rocks

    By S Utili, A Agosti

    The Overall Slope Angle (OSA) of pitwalls plays a crucial role in the financial return of an open pit mine. In current practice, pitwall profiles are designed to be planar in cross-section within each

    Nov 29, 2022

  • AUSIMM
    From Face to Surface – a Fragmentation Study

    By A Gustafson, D Johansson, K Jonsson

    The underground mining process, from in situ characteristics of the unmined rock mass to the final mill product with fully liberated minerals, consists of a chain of unit operations. Some of them infl

    May 9, 2016

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Are our closure planning and regulatory processes adequate to identify, quantify and appropriately transfer residual risks after successful mine rehabilitation?

    By P B. Swart, P D. Erskine

    Despite an increasing focus by media, communities and activists driving an elevated regulatory focus in Australia and indeed some other mining jurisdictions, the mining industry globally has had limit

    Jul 25, 2018

  • AUSIMM
    An estimation error

    By D A. Sims

    This paper outlines the contributing factors to a series of erroneous Mineral Resource estimates which led to considerable loss, including significant reduction of mine life and consequently a large w

    May 24, 2023

  • AUSIMM
    State-of-the-art of electroslag refining and challenges in the control of ingot cleanness

    By G Stovpchenko, G Jianjun, L Medovar

    Electroslag remelting (ESR) today and into the future, will still be the main process for producing high-quality ingots by suppressing segregation, not just refining chemical composition from impuriti

    Jun 19, 2024

  • AUSIMM
    Presentation of Certificate of Honorary Membership to Robert Colville Bradshaw, O.B.E.

    ADDRESS BY THE PRESIDENT OF THE INSTITUTE (MR. J. G. SYMONS) IN PRESENTING THE CERTIFICATE TO ROBERT COLVILLE BRADSHAW, O.B.E.Today it is my privilege and pleasure to introduce to you, Robert Colville

    Jan 1, 1977

  • AUSIMM
    Why Reinvent the Wheel when there are Established Methodologies to Aid the Design and Assessment of Restored Natural Ecosystems on Mined Land?

    By R N. Humphries

    The aim of this paper is to question the need to develop bespoke monitoring and assessment methodologies and criteria, thereby ‘reinventing the wheel’, when designing and assessing the success of impo

    Jul 16, 2014

  • AUSIMM
    Bulk carrier vessel tracking automation – the Dalrymple Bay use case

    By W Russell, P Wighton, J Franke

    Recent advances in ruggedised industrial control system technology and architecture in combination with latest technologies in the fast-evolving 3D LiDAR sensor sector becoming available have enabled

    Nov 8, 2021

  • AUSIMM
    The emerging role of the operational geotechnical engineer

    By C G. Sweeney

    The underground mining industry is seeing unprecedented shortages in skilled labour. Migration to Australia being at an all-time low is a leading concern, with pandemic-induced border closures and loc

    Nov 29, 2022

  • AUSIMM
    Pike River Coal - Hydraulic Mine Design on New Zealand's West Coast

    Pike River Coal Limited is in the process of developing the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine will be developed to extract a coking coal deposit of the

    Jan 1, 2006

  • AUSIMM
    Sludge Conditioning Technology to Reduce Sludge and the Cost of Acid Mine Drainage Treatment

    By K Banerjee, C Dube

    Veolia Water Technologies was contracted by a global coal mining company to design a retrofit acid mine drainage treatment facility using DenseSludge™ technology on a former coal refuse disposal site.

    Jul 27, 2015

  • AUSIMM
    An attempt towards ferrochromium production using molten oxide electrolysis

    By L Klemettinen, J Biswas, W Malan, D Sukhomlinov, D Lindberg

    In order to mitigate the effects of climate change, our society must be able to drastically reduce its CO2 emissions. As the metallurgical industry is a considerable contributor to these emissions, ne

    Jun 19, 2024

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    Maximising Value Through Maintaining Your Flotation Equipment

    By B Murphy, S O’Connell, J L. Heath

    In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat

    Sep 1, 2014

  • AUSIMM
    Solving a Large Stochastic Integer Programming Model for Production Scheduling at a Gold Mine with Multiple Processing Streams and Uncertain Geology

    By M de Freitas Silva

    One of the main steps during the decision-making process of long-term mine planning is the definition of the optimal sequence of extraction, which usually is synonymous with maximising the discounted

    Nov 24, 2014