Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Design and Installation of a Booster Fan at Tahmoor CollieryBy M Ogle
"Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the
Jun 1, 2012
-
Synthetic Rutile from Westport Ilmenite by the Austpac ERMS ProcessThe ERMS Process was developed during four years of testwork by Austpac Gold NL to overcome the severe metallurgical problems of the ilmenite atWestport, in the South Island. These deposits have been
Jan 1, 1993
-
Technology Based Innovation - The Next DecadeThe minerals industry focus over much of the past twenty years has been on cost reduction and production growth supported, but not driven, by technology improvements. Mergers and acquisitions, and the
Sep 13, 2010
-
The Solvent Extraction of Uranium from SlurriesA great range of contacting equipment is used in solvent extraction. However, a tower filled with a regular packing offers many advantages in the direct extraction from slurries. A study was made of
Jan 1, 1969
-
Digital geological mapping – pay-offs, pitfalls and pathways to successful mapping digitalisationBy N Anderson
The world-class Golden Mile gold deposit in the Eastern Goldfields of Western Australia is part of the Kalgoorlie Consolidated Gold Mines (KCGM) operation, which is wholly owned by Northern Star Resou
Mar 22, 2022
-
Environmental Investigations and Procedures to Support Mining Consent ApplicationsBy M Foster
The new environmental legislation of 1986 was left incomplete and to date remains so. The 'missing' process by which environmental consideration should be applied was never embodied in law a
Jan 1, 1988
-
Improving Blasting by a Team Approach at the Henty Gold MineBy R Wedmaier
Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û
Jan 1, 2001
-
Goafstream Sampling and the BarometerBy M Brady
"It has long been recognised that the barometer infl uences areas of underground coal mines that havebeen sealed off from the current, or active, mine workings but it appears litt le formal research h
Jun 1, 2012
-
Results of Self-Heating Tests of Australian Coals Conducted in a 16 m<sup>3</sup> ReactorA research and testing facility has been developed at Simtars to allow the spontaneous combustion testing of coal on a large scale. In this adiabatic reactor, the coal particle sizing is closer to tha
Jan 1, 2005
-
What is Expected of ExplorersMiners and explorers in New Zealand are expected to consult with stakeholders, keep out of core conservation areas, and operate a high standard of environmental management and rehabilitation. These re
Jan 1, 1997
-
Changing the Ground Support in Cemented Hydraulic Backfill at CSA MineCSA mine, which is a deep level copper operation, located 12 km north of Cobar, NSW, currently uses a top down stoping method, utilising cemented hydraulic backfill (CHF) to fill and stabilise the sto
Nov 25, 2010
-
Performance Optimisation of the Imhoflot G-Cell for Fine Coal CleaningBy V Gupta, Z Huang, S K. Biswal
G-Cell is a new design modification of the Imhoflot pneumatic flotation technology, which utilises a self-inducing aerator inside a downcomer, where bubble-particle attachment takes place. The present
Jan 1, 2005
-
Optimum Equipment Management Through Life Cycle CostingLarge mining operations need equipment that consistently performs as expected. The most effective way of ensuring this is to have a defined life cycle with an optimised maintenance strategy. The deter
Dec 6, 2010
-
-
Maturity of Jurisdictional Abandoned Mine Programs in Australia Based on Web-accessible InformationBy C J. Unger, A M. Lechner, A Walton, V Glenn, M Edraki, D R. Mulligan
In Australia, responsibility for abandoned mines can be unclear. With a few exceptions, state and territory governments have become responsible for abandoned mines on Crown land and private landholder
Jul 16, 2014
-
Real-Time Simulation in Process Engineering - Dream or Reality?Computation is believed to be a powerful tool in scaling-up chemical processes and in designing materials, however, is being challenged by low predictability and limited scalability. This presentation
Sep 13, 2010
-
The Dynamics of Coupling Between Deformation and Fluid Flow in the EarthÆs Crust: Implications for Ore GenesisPermeability and fluid pathways in fracture-controlled hydrothermal systems are governed by a dynamic competition between permeability-creation processes and permeability-destruction processes. Permea
Jan 1, 2005
-
Update on Precious Metals in Deep Geothermal Waters of the Taupo Volcanic Zone (TVZ)By K L. Brown
Sampling and analyses of deep waters from Wairakei and Rotokawa geothermal systems indicate a wide range of precious metal concentrations (<0.1 to 23 ppb Au; 6 to 2400 ppb Ag), suggesting that east
Jan 1, 2006
-
Development of the Maui Gas FieldThe offshore Maui gas/condensate field was discovered by Shell BP and Todd on Services Limited in 1969. Subsequent appraisal drilling and negotiatio
Jan 1, 1994
-
Taxonomy of Interactive Computer-Based Visualisation Systems and Content for the Mining Industry û Part OneBy C Caris, K Fowle, M Schmid, E van Wyk, D Schofield, A Squelch, M S. Kizil
This paper has been written collaboratively by members of the International Mining VR Group. It is the first of a series of papers. Mining in the 21st century is a high technology industry that strive
Jan 1, 2008