Search Documents

  • AIME
    Zeolites - Synthetic Zeolites: Properties and Applications

    By D. W. Breck

    Zeolites were first recognized as a new group of minerals by Cronstedt with the discovery of stilbite in 1756. The word zeolite was coined from the two Greek words meaning "to boil" and "a stone" beca

    Jan 1, 1975

  • SME
    The History Of Aggregate Development In The Denver, Co Area - Preprint 09-044

    By W. H. Langer

    At the start of the 20th century Denver?s population was 203,795. Most streets were unpaved. Buildings were constructed of wood frame or masonry. Transport was by horse-drawn-wagon or rail. Statewide,

    Jan 1, 2009

  • CIM
    Mechanical Integrity versus Process Safety Management Requirements

    By Hugo Julien

    According to OSHA 29 CFR Part 1910.119 (Process safety management of highly hazardous chemicals), Canadian Provincial Safety Standard Acts or Federal laws, the owner of stationary equipment (Boilers,

    Jan 1, 2014

  • IIMP
    Modelamiento y Simulación Sistémica (software) para facilitar la evaluación del proceso molienda - Clasificación en plantas concentradoras

    By Juan Oswaldo Alfaro, Angel C. Nuñez, Hildebrando A. Cóndor

    Se ha desarrollado un software para facilitar la evaluación del proceso molienda-clasificación en plantas concentradoras. Se ha modelado en UML-Lenguaje Unificado de Modelado; los datos e información

    Sep 1, 2017

  • AUSIMM
    Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western Australia

    By D R. Anstey

    The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from

    Jul 11, 2011

  • AUSIMM
    What Project Managers must Demand from an Economic Evaluation!

    By P Card

    Some project managers accept unsatisfactory economic evaluation modelling because they are unaware of what constitutes good practice. They tend to leave it to the evaluation specialist or others to de

    May 24, 2012

  • SME
    Applying Computers On-Board Surface Mining Equipment

    Application of microprocessors, programmable logic devices, and other computer-oriented hardware and software on-board large surface mining equipment to optimize availability and productivity, stretch

    Jan 1, 1990

  • SME
    Job Site Security: Risk Management beyond Gates, Guards and Guns

    By Eric Jacobs

    "Building and operating tunnels has been a highstakes endeavor in terms of costs, complexity, safety and impact on contractors, owners and the public for a long time. There are many variables that nee

    Jun 1, 2019

  • RMCMI
    The Tire Market

    By Clyde Sitterud

    Presentation Agenda ?Global Mining Tire Demand ?What is driving it? ?Latest Situation ?How long it will last? ?Michelin?s Response to Increase Supply ?New plant ?Additional presses ?Reco

    Jan 1, 2005

  • AIME
    Reservoir Engineering - General - The Effect of Partial Penetration on Pressure Build-up in Oil Wells

    By Robert G. Nisle

    The classic theory of pressure build-up in shut-in oil wells as developed by Horner and van Everdingen is based on two-dimensional radial symmetry in the well-reservoir system. Such symmetry does not

  • SME
    Kinetic And Equilibrium Effects In Gold Ore Cyanidation

    By M. I. Brittan

    Cyanide leaching of two West African gold ores was studied in multiple laboratories to provide process-engineering data for plant design purposes. Unusually slow leach extraction kinetics were observe

    Jan 1, 2008

  • DFI
    The Effect Of Vertical Pile Loading On Subsequent Lateral Behaviour

    By A. Lyndon

    Vertical and lateral load tests were carried out on two 13 m deep bored cast-in-place instrumented piles, socketed into weathered sandstone. The first pile, 1200 mm in diameter, was loaded vertically

    Jan 1, 1989

  • AUSIMM
    KEYNOTE: Upgrades, Modernisations and Expansions Where Will the Expertise, Capability and Skills Come from in the Future?

    By J King, T Hunter, R Coleman

    "The industry that supports operations and new projects is suffering a rapid decline in the currently severely curtailed capital investment environment. This is evidenced by a decline in the number of

    Oct 10, 2016

  • SME
    Comparing Simulated And Interpreted Geologic Models

    By M. Rossi

    Geologic ore controls are usually interpreted and modeled from cross sections and plans, as they are critical to construct meaningful and accurate ore reserves models. The geologic boundaries are oft

    Jan 1, 2004

  • AUSIMM
    How Can You Get Mining Equipment to Work to its Real Capacity?

    Most mining operations have been happy to live in blissful ignorance of what their equipment is really capable of. Shareholders have been shown increasing tonnes output per employee (due to rationalis

    Jan 1, 2009

  • AUSIMM
    Flint Clays of the Merrygoen-Digilah Area

    The area between Merrygoen and Digilah is located on a structural high that separates the Sydney Basin from the Great Artesian Basin, and hence the stratigraphic succession of younger rocks overlying

    Jan 1, 1973

  • SME
    Leica Dozer 2000 At The San Miguel Lignite Mine: The Uses Of GPS Grade Control In Surface Mining

    By M. Heger

    February 2, 1999 marks a milestone in earth-moving technology at the San Miguel Lignite Mine. It was on that date that The North American Coal Corporation (NAC) took delivery of three Leica Dozer 200

    Jan 1, 2002

  • CIM
    Lessons Learned From Expanding Al-Agoza Hospital in Egypt

    By Nehad Elsafty

    It is always necessary to expand existing buildings, so that they could meet the growing societal needs. Compared with demolishing them and then constructing new ones, the expansion of existing buildi

    Aug 1, 2013

  • SME
    Building the East-West Cross Drift Tunnel at Yucca Mountain

    By Brian Fulcher

    In April 1997, Kiewit/Parsons Brinckerhoff (K/PB) completed the 7,600-m (25,000-ft) primary access tunnel for the Yucca Mountain, NV proposed high-level nuclear waste site. K/PB then began boring an

    Jan 1, 2000

  • DFI
    Seal Slab Prestressed Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p

    Jan 1, 2013