Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Rock Reinforcement Longevity

    By Francis S. Kendorski

    Rock reinforcement has been in widespread use and generally has been accepted in underground mining and tunneling since the 1950s. The first rock reinforcement technologies employed were mechanical an

    Jan 1, 2000

  • SME-ICGCM
    Multiseam Mining On South African Collieries

    By R. W. Hill

    Multiseam mining has been carried out at many collieries in South Africa. It the seams are In close proximity difficult and dangerous mining conditions may arise. In the Witbank area multiseam bord an

    Jan 1, 1995

  • SME-ICGCM
    Subsidence Prediction In Illinois Coal Basin

    By Ed D. Doney

    Based on the subsidence data collected through a comprehensive subsidence monitoring program con: ducted over two longwall panels in an Illinois coal mine, mathematical models have been proposed for p

    Jan 1, 1990

  • SME-ICGCM
    Classification Of Mine-Related Subsidence East Of Mississippi River, U.S.A.

    By Jesse L. Craft

    Field investigation of surface subsidence events associated with both active and abandoned underground coal mines in the United States has established criteria that enable the prediction and classific

    Jan 1, 1992

  • SME-ICGCM
    Surface And Borehole Microseismic Monitoring Of Longwall Faces; Their Potential For Three-Dimensional Fracture Imaging And The Geomechanical Implications.

    By Styles P.

    To determine whether 130 felt earth tremors around Edwinstowe, Nottinghamshire U.K, which also experienced severe surface fissuring, were caused by coal extraction, a surface seismometer array was est

    Jan 1, 1992

  • SME-ICGCM
    The Effect Of Hazardous Geologic Structures On Gateroad Stability

    By Frank E. Chase

    Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g

    Jan 1, 1990

  • SME-ICGCM
    Laboratory Study Of Shear Loading And Bolt Load Transfer Mechanisms Under Constant Normal Stiffness Conditions

    One of the most important parameters in rock/resin/bolt load transfer mechanism is the surface property of the bolt. Although there are various bolt surface configurations available in the market, ver

    Jan 1, 1999

  • SME-ICGCM
    Stress Control Method Applied to Stabilization of Underground Coal Mine Openings (e5cbe8ad-30a8-4144-a7b5-db19e81a247a)

    By Shosei Serata

    Serious floor heave of up to 2.4 m in a 2.4-m high mine entry was eliminated by applying the stress control method of mining, as a last resort, at the No. 5 coal mine of Jim Walter Resources, Inc., in

    Jan 1, 1984

  • SME-ICGCM
    Resupporting High Roof Falls

    By Nicholas Chlumecky

    One of the most dangerous jobs in mining is that of resupporting the roof after a fall has occurred. The resulting cavity may be more than 30 feet high, with relatively unstable sides and roof. It is

    Jan 1, 1981

  • SME-ICGCM
    Failure Modes Of Mine Tunnels In Stratified Rock Structures With Reference To Stress Field Conditions

    By Hui Chen

    The paper describes the use of a physical model technique to investigate the failure modes of mine tunnels with reference to the in situ stress field. The characteristics of stratification commonly en

    Jan 1, 1993

  • SME-ICGCM
    Strata Mechanics Of Pillar Extraction Goaf Edges (001afab8-c7ac-48fa-af96-b8de57c1318e)

    By John Shepherd

    Pillar extraction carried out using various methods (split and lift, Wongawilli and old Ben) involves the formation of narrow fenders (commonly 7 m of coal) formed by driving "splits" for lifting off

    Jan 1, 1992

  • SME-ICGCM
    Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine

    In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,

    Jan 1, 1997

  • SME-ICGCM
    Developments in Sealant Support Systems for Ground Control (21st international Conference on Ground Control in Mining)

    By Deno Pappas

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) has been evaluating developments in sealant support systems from a gr

    Jan 1, 2002

  • SME-ICGCM
    Review Of Pillar Design Equations Including The Effects Of Constraint

    By C. Babcock

    This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships

    Jan 1, 1981

  • SME-ICGCM
    Prediction Of Subsurface Subsidence For Longwall Mining Operations

    By Yi Luo

    Subsurface strata movements and deformations associated with underground mining activities could cause problems to subsurface structures and water bodies. By incorporating the methods for surface subs

    Jan 1, 2000

  • SME-ICGCM
    Improving Roof Control At A South African Coal Mine

    By Alan Bugden

    Goedehoop Colliery produces 8 million tonnes of coal a year, principally from room and pillar mining, and is situated in the Witbank Coalfield in the Republic of South Africa. The mine has a long and

    Jan 1, 2001

  • SME-ICGCM
    Imaging Ahead Of Mining With Radio Imaging Method (RIM-IV) Instrumentation And Three-Dimensional Tomography Software

    By Larry Stolarczyk

    A clear vision of the future coal mining industry was developed into a hierarchy of technology needs by the National Mining Association (NMA) and the Chief Executive Officers of the mining industry. A

    Jan 1, 2003

  • SME-ICGCM
    Roof Geology Mapping In Underground Coal Mines

    By Daniel W. H. Su

    Underground roof geology reconnaissance is being conducted by CONSOL Inc. to enhance mine productivity. Often, roof instability within mine entries is the consequence of highly variable geology that c

    Jan 1, 1999

  • SME-ICGCM
    The Stress And Failure Paths Followed By Coal Mine Roofs During Longwall Extraction And Implications To Tailgate Support

    By Ross Seedsman

    Discussion on the design of roof support in tailgates has often been conducted without a clear statement of the stress and failure conditions acting. There is general agreement that in the tailgate th

    Jan 1, 2001

  • SME-ICGCM
    Rock Mass Classification As An Aid To Estimating The Strength Of Coal Pillars (77026f3a-8230-4eb0-afbc-609f7a2ad471)

    Coal mass strength properties must be estimated to obtain realistic estimates of coal pillar strength. The limitations of existing techniques for approximating these properties are discussed. The coal

    Jan 1, 1992