Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Using Tracers To Evaluate The Design Of An In-Situ Leach Cell In Abandoned Mine And Mill Wastes At The Kellogg, Idaho Superfund Site

    By Jr. Kirschner

    An abandoned waste impoundment located within a portion of the Kellogg, Idaho Superfund site constitutes a field research area for studying the feasibility of recovering heavy metals in-situ from unsa

    Jan 1, 1993

  • SME
    World’s Largest Tunnel Gates and Reservoir Connection go Online as Part of Chicago’s Tunnel and Reservoir Plan

    By Faruk Oksuz, Dave Schiemann, Miguel Sanchez, Patrick Jensen

    "The McCook Main Tunnel connects Chicago’s Tunnel and Reservoir Plan (TARP) Mainstream Tunnel to the McCook Reservoir. The tunnel system consists of a 10 m (33 ft) finished diameter and 490-m (1,600-f

    Mar 1, 2019

  • SME
    Application of DInSAR for Short Period Monitoring of Initial Subsidence Due to Longwall Mining in the Mountain West United States

    By Jessica M. Wempen

    "Differential Interferometric Synthetic Aperture Radar (DInSAR), a satellite-based remote sensing technique, has application for monitoring subsidence with high resolution over short periods. DInSAR u

    Jan 1, 2019

  • SME
    Optimum Scheduling Of Room And Pillar Operations ? Introduction

    By Prashanta K. Chatterjee

    The planning of an underground coal mine requires a complex blend of technical expertise, experience and subjective design criteria implemented by the mining engineer. Currently the procedure is large

    Jan 1, 1986

  • SME
    Characteristics of Drawing Body Shape in LTCC: Theoretical Model and Experimental Validation

    By Weijie Wei, Jinwang Zhang, Jiachen Wang, Yang Li

    "Longwall top-coal caving (LTCC) mining technique is one of the important methods for underground thick seam extraction in China. The coal seam in LTCC panel is divided into two parts: bottom-coal and

    Jan 1, 2019

  • SME
    Contracting Practices for Underground Freight Transportation Projects: A Look at Cargo Sous Terrain - RETC2021

    By Jürg Künzle

    The use of the underground space has been a recurring issue in human history, whereas the reasons for building subsurface structures have changed over time. In the decades to come, the world will be m

    Jun 13, 2021

  • SME
    Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions - RETC2021

    By Francesco Chiappalone, Tanner Murt, Lance Waddell, Cristina Oñate Salazar

    The 3RPORT project is a 5-mile-long, 16-foot-internal-diameter tunnel excavated in hard rock by Slurry TBM in Fort Wayne, Indiana. Two-component grouting can be separated into two core areas of operat

    Jun 13, 2021

  • SME
    Automatic Computation of TBM Face Pressure Using 3D Ground Model - RETC2021

    By CK Tsang, Jack Muir, Dharman Gersch, Joshua Barry

    Correct face pressure is critical to safe operation of a closed face TBM. If inadequate face pressure is applied, this will lead to excessive ground movement, and may result in collapse of the tunnel

    Jun 13, 2021

  • SME
    Updating the GBR Gold Book - NAT2022

    By David Hatem, Paul Madsen, Daniel Adams, James Morrison, Randall Essex

    Managing commercial risks associated with subsurface construction may be the greatest challenge the underground industry faces. The Geotechnical Baseline Report (GBR) was developed in the U.S. to help

    Dec 1, 2022

  • SME
    Investing in Sustainable Tailings Management: Reduce Risk by Considering Environmental and Utility Costs During Pre-Feasibility - SME Annual Meeting 2024

    By Jacob Bouke, Jason Janisch, Erik Vlot

    The use of conventional tailings deposition methods has been the standard for decades. With the need to reduce the impact of mining, alternative methods are considered when expanding or upgrading tail

    Feb 1, 2024

  • SME
    Cobalt Recovery from Mill Tailings at Mantoverde Copper Mine - SME Annual Meeting 2025

    By Peter Amelunxen, Kain Nugent, Brandon Akerstrom, Willem Duyvesteyn, Todd Harvey

    In 2024, Capstone Copper Corp commissioned a new sulfide flotation plant at Mantoverde in the Atacama region of Chile to process copper ore at a design rate of 32,000tpd. The pyrite associated with th

    Feb 1, 2025

  • SME
    Hierarchical Training Pipeline for Event-Based Robotic Perception Models for Autonomous Roof Bolting - SME Annual Meeting 2024

    By Akram Marseet, Andrew J. Petruska, Rik Banerjee

    Event cameras are used for their performance in high dynamic-range lighting conditions which are canonical to active mining environments. Direct labeling of event-based image data to train a model to

    Feb 1, 2024

  • SME
    Construction of an Underground Niche for TBM Repair and Permeation Grouting in Flooded Shaft—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Brad Yoder, Fabrizio Fara

    The Ship Canal Water Quality Project includes a 2.7-mile, 18-ft and 10-in internal-diameter tunnel that extends from Ballard to Wallingford, two popular neighborhoods in the West of Seattle. During th

    Jun 23, 2024

  • SME
    A Derivative Method to Calculate Resistance Sensitivity for Mine Ventilation Networks (Mining, Metallurgy & Exploration)

    By Lihong Zhou, DAVOOD BAHRAMI

    A reliable and stable ventilation system is essential to the safe operation of underground mines. The stability of a mine ventilation system becomes extremely critical while responding to a fire incid

    Jun 7, 2022

  • SME
    A Case Study in Successful Progressive Design Build Tunneling - RETC2023

    By Nik Sokol, Mike Jaeger, Leo C. Weiman-Benitez

    Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline tunnel in Redwood City, CA. Owner and

    Jun 13, 2023

  • SME
    Analysis of extensometer, photogrammetry and laser scanning monitoring techniques for measuring floor heave in an underground limestone mine - SME Transactions 2018

    By B. A. Slaker, T. Miller, M. M. Murphy

    An underground limestone mine in eastern Ohio was experiencing significant floor heave and roof falls, attributed to high horizontal stresses. Areas of the mine showing floor heave were monitored with

    Jan 1, 2018

  • SME
    New instrumented method to measure the true loading profile along grouted rockbolts - SME Transactions 2015

    By A. J. S. Spearing, B. Forbes, T. Kostecki, A. Hyett

    Improving upon the past understanding of the interaction between installed rock bolts, the immediate roof and sidewalls is vital for the implementation of sound support system design, as this has a di

    Jan 1, 2015

  • SME
    Ground Penetrating Radar Application to Detect the Watertight Clay Layer at Tailing Dump - Mining, Metallurgy & Exploration (2023)

    By Yerkezhan Madenova, Kairat Kalmurzayev

    This study intends to demonstrate the engineering application of ground penetrating radar (GPR) that would enable site engineers to prevent the high cost of blind drilling. At the tailing dump located

    Jan 12, 2023

  • SME
    In-mine study of high-expansion firefighting foam - SME Transactions 2010

    By R. S. Conti, M. R. Krump, C. P. Lazzara Ph. D., R. L. Derick, L. L. Chasko

    A mine fire is one of the most challenging safety issues facing a mine operator and can occur at any location underground. The National Institute for Occupational Safety and Health (NIOSH) and the Twe

    Jan 1, 2010

  • SME
    Copper Extraction From Smelter Flue Dust By Lime Roast/Ammoniacal Heap Leaching

    By E. E. Caba

    Copper smelter flue dusts containing arsenic are hazardous materials requiring environmentally accept-able disposal, preferably with re-source recovery under the RCRA and CRCLA regulations. However, t

    Jan 1, 1992