A Case Study in Successful Progressive Design Build Tunneling - RETC2023

Society for Mining, Metallurgy & Exploration
Leo C. Weiman-Benitez Nik Sokol Mike Jaeger
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
14
File Size:
221 KB
Publication Date:
Jun 13, 2023

Abstract

Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline tunnel in Redwood City, CA. Owner and Design-Builder teamed with designer Arup to provide a final product: 3.3 miles of 182 in. O.D. precast concrete segmentally lined tunnel with 10 ft. and 11 ft. I.D. Fiberglass Reinforced Polymer Mortar (FRPM) carrier pipe, complete with two FRPM Drop Structures. BBJV and Arup collaborated with SVCW to evaluate alternative design concepts, negotiate an agreeable price and reduce contingencies through a transparent estimating process, and deliver the project ahead of schedule.
Citation

APA: Leo C. Weiman-Benitez Nik Sokol Mike Jaeger  (2023)  A Case Study in Successful Progressive Design Build Tunneling - RETC2023

MLA: Leo C. Weiman-Benitez Nik Sokol Mike Jaeger A Case Study in Successful Progressive Design Build Tunneling - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account