Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Vibrations Caused by Pile DrivingBy K. Rainer Massarsch
"Part 2 of 2 (Continued from Summer 2004 edition) By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenVibrations, which are caused by the installation of piles in dry or permeable soils, can
Jan 1, 2004
-
Electronic Instrumentation in Support of Installation of Special Foundation Projects as Part of the Digital Future - Ensuring Safe Production and Improving Quality ControlBy Franz-Werner Gerressen
New developments are required each day as our industry becomes more competitive. To improve performance, continue and to ensure future demands can be met. This requires the development of technical su
Jan 1, 2019
-
Tomographic Dst Algorithm For Stone Column Site Imaging And CharacterizationBy Gerald Verbeek, Erick Baziw
Stone columns are used in geotechnical site remediation to increase load-bearing capacity and reduce settlement of foundations. Stone columns also improve slope stability and increase the shear streng
-
Session 30 "Grouting for Tunnels 2"By Raymond Henn
Yes we have also used some however, again because of the nature of the maintenance window where we have that two hour (at best) window every night and due to the numerous other crews that are wanting
Feb 10, 2003
-
Risk Management For Dam Rehabilitation ProjectsBy Dave Paul
Dam rehabilitation involves a range of design, construction, and operation risks, some of which are not encountered in new dam construction. These risks can have significant impact on project schedule
-
TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
Diaphragm Walls for Infrastructure Projects how to Deal with Complex Demands?By Franz-Werner Gerressen, Manfred Schoepf
"Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. It can be anticipated that,
Jan 1, 2015
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016
-
Current Business Trends In The People's Republic Of China ? SynopsisBy V. Tang
In this paper, Chinese economic situation are estimated and prospective developments predicted to assist those US firms who have been trying to do business in China, or are considering to pursue the C
Jan 1, 2010
-
Buckling Resistance of Steel Micropiles with Mechanical SplicesBy Fredrik Sarvell, Harald. Ihler, Veli-Matti Uotinen, Jukka Rantala
"Many of the valid international building codes state that the lateral support provided by the soil is sufficient to prevent buckling of fully embedded piles. However, the development of small diamete
Jan 1, 2014
-
Foundation in Simsima Lime Stone for an Underground ReservoirBy Chandramohan P. V., Ravi Kishore
"An underground reservoir was to be constructed at Doha in Qatar. Simsima lime stone is present at the bottom. When the reservoir is empty, there will be uplift at the bottom but this will change to d
Jan 1, 2017
-
Piled Foundations for the New Wembley Stadium, LondonBy Anthony L. Reynolds, Clifford J. Wren
"The adoption of a significant pile testing regime, the use of Eurocode 7 as the design standard, the development of lean construction techniques, and lateral thinking in overcoming some considerable
Jan 1, 2005
-
Experiment to Determine the Influence of Groundwater Level on Grid-Form Deep Mixing Walls for Liquefaction ControlBy Tsuyoshi Honda, Kazuhiro Kaneda, Masayuki Imai, Kazuo Konishi, Kunio Higashinaka
"In recent years, the demand for measures to control liquefaction of existing airport runways and harbor structures has increased. However, from the perspectives of constructability and cost, applicat
Jan 1, 2015
-
Shoring Design of Historic LA Metro StationBy Babak Mamaqani
The Regional Connector Transit Corridor (RCC) is the Los Angeles Metro area's ambitious light rail project, running under the city's main thoroughfares, Flower and 2nd streets. When com- pleted, it wi
Apr 1, 2022
-
DFI46 Panel on Foundation ReuseBy Andy Boeckmann
In early 2021, DFI formed a Foundation Reuse Task Force due to concurrent and coincidental discussions of this topic during meetings of the Subsurface Char- acterization for Deep Foundations and Test
Feb 1, 2022
-
Pile-Supported Raft Foundation SystemBy Emre Biringen
Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howeve
-
A Case Study of Multichannel Analysis of Surface Waves (MASW) as a Tool to Characterize Unknown FoundationsBy Joseph T. Coe, Siavash Mahvelati, Philip Asabere
Characterization of existing foundations remains an important issue as foundation reuse and rehabilitation continue to garner increased attention. In the case of unknown foundations, geophysical and n
Jan 1, 2016
-
Unusual Geology At Brooklyn's Edge And Its Influence On Design And Installation Of PilesBy Hiren J. Shah
Across much of New York City, the geology of glacially deposited soils follows a common sequence. Outwash sands generally overlie varved silts and clays, which lie above a basal till deposit underlai
Jan 1, 2008
-
Recent Experiences With Optical Fibre Monitoring Of Geotechnical StructuresBy Gust Van Lysebetten, Monika de Vos
The objectives of monitoring geotechnical structures can be very diverse, including optimisation of the design, quality control, long term performance assessment, and approval of innovative execution
May 1, 2022
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab