Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Jet Grouting for Echo Dam Seismic Rehabilitation

    By Tara Schenk-McFarland, Mark Bliss

    Echo Dam, located near Coalville, Utah, is a facility that provides storage for irrigation and municipal use. Original construction of the dam was completed in 1931. Because of seismic concerns, the s

    Jan 1, 2017

  • DFI
    Bentonite Self-Hardening Slurry Mix Variations and Field Implementation Methods

    By Christopher R. Harris

    "Considerations are presented for developing and implementing self-hardening slurry mix designs to be utilized in barrier seepage walls. Slag-cement-cement-bentonite (SCCB) slurries are the primary fo

    Jan 1, 2016

  • DFI
    On Driven Piles In The Arabian Gulf: Imperfections, Potential Challenges, And Lessons Learned

    By Waddah Akili

    The demand on pile installation in the offshore of the Arabian Gulf has, over the last two decades, experienced unprecedented boom, triggered by the construction of platforms, to help facilitate the p

  • DFI
    Development of Lattice-Shaped Cement Treatment Method for Liquefaction Countermeasure

    By Seiji Mizutani, Hirofumi Taguchi, Makoto Yoshida, Hidenori Takahashi, Naotoshi Shinkawa, Kazuo Konishi, Yoshiyuki Morikawa, Masaya Kawata

    "The lattice-shaped cement treatment method has been used to improve the seismic performance of liquefied sandy soil in Japan. The efficacy of the method has been confirmed by the huge earthquake in J

    Jan 1, 2015

  • DFI
    Failure Modes for Embankments over Ground Improved with DCM Column Walls beneath the Slope

    By Manasi Wijerathna, D. S. Liyanapathirana

    "Deep cement mixing is a popular soft ground improving technology that improves the bearing capacity and settlement characteristics of natural soil. When Deep Cement Mixed (DCM) columns are installed

    Jan 1, 1900

  • DFI
    The Development and State of Practice of Cutter Soil Mixing in North America – The First 10 Years

    By Brian Wilson, Franz-Werner Gerressen

    "Cutter Soil Mixing, also known as CSM, was developed in Europe as an alternate method of Deep Mixing to the more traditional single and multiple auger techniques, and brought to market by Bauer Masch

    Jan 1, 2015

  • DFI
    Building The Devil’s Playground: How a Ground Improvement Program Eliminated the Need for Pile Foundations

    By Christian B. Woods, Joe C. Drumheller

    "Kenneth A. Huber, P.E., Langan Engineering & Environmental Services, New York, New York, USAThe dream to bring New Jersey Devils hockey to the largest city in New Jersey became a reality in the summe

    Jan 1, 2015

  • DFI
    Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)

    By John C. Niedzielski, A. Frances Ackerman

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l

    Jan 1, 2017

  • DFI
    Optimization Of Drilled Shaft Design For A Highway Bridge In Arizona Using Load Test Results

    By John C. Niedzielski

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter)

  • DFI
    Back Analysis of Field Instrumentation Results during Reclamation & Ground Improvement Works- A Case Study

    By Prasanta Paul, Aminul Islam

    "Nhava Sheva (India) Gateway Terminal Private Limited proposed to construct a container terminal yard, comprising a back-up area at Jawaharlal Nehru Port Terminal (JNPT), Uran, Maharashtra. The propos

    Jan 1, 2015

  • DFI
    Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, OR

    By Vince Luongo

    "INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project

    Jan 1, 2006

  • DFI
    Selection And Quality Control Of Deep Foundations At Ontario Hydro's Darlington Nuclear Generating Station - Synopsis

    By F Debidin

    The progressive rise of an H-pile during driving of an adjacent pile is described in this case history in which piles 15 to 18 m long were driven to end-bearing for the foundations for a 230 m long bu

    Jan 1, 2010

  • DFI
    Introducing VCE's: Support Of Excavation Without Tie-Backs

    By Rick Deschamps

    A reoccurring problem with support of excavations in urban areas involves the placement of external support components like anchors or nails in right-a-ways, subway and utility setbacks, in areas occu

    Jan 1, 2008

  • DFI
    Foundation Stabilization of the Morris Island Lighthouse

    "The Morris Island Lighthouse (MIL) is located between the jetties leading to the Charleston Harbor and Folly Beach, S.C. The present structure is the third lighthouse to occupy this location. The fir

    Jan 1, 2017

  • DFI
    Pile Design And Construction Challenges In Partially Thawed Alaskan Soils

    By John D. Thornley

    Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alas

  • DFI
    Pile Design and Construction Challenges in Partially Thawed Alaskan Soils (f9ca4371-20bf-4196-a495-4aa1bd15a8c0)

    By John D. Thornley

    Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alask

    Jan 1, 2017

  • DFI
    Frustum Confining Vessel (FCV) For Investigation of Deep Foundation Performance

    By Abolfazl Eslami, Masoud Zare, Ali Asadi, Ali Abrang

    "Physical small scale models for study of deep foundations can be performed in simple chambers (1g), calibration chambers (CC), and centrifuge apparatus (ng) which involve some limitations and difficu

    Jan 1, 2015

  • DFI
    The Progress Of Jet Grouting In The Last 10 Years In Japanese Market

    By H. Yoshida

    Jet grouting was first introduced in Japan in the second half of the 1960s, approaching 50 years ago. By the end of the first 40 years, jet grouting from single to triple fluid systems had become a g

    Jan 1, 2010

  • DFI
    New Orleans Levee Improvement Project: An OPA Contender

    By Filippo Leoni, Wesley Schmutzler

    "The LPV-111 East Back Levee Improvement Project lies along the Gulf Intracoastal Waterway (GIWW) in Orleans Parish of New Orleans, La., and is an essential component of the New Orleans Hurricane Prot

    Jan 1, 2013

  • DFI
    Caisson Foundations For Mississippi River Bridges In The New Orleans Area (2e66a216-6dc8-4479-804e-25f5836f407e)

    By William B. Conway

    This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du

    May 11, 2007