Back Analysis of Field Instrumentation Results during Reclamation & Ground Improvement Works- A Case Study

Deep Foundations Institute
Aminul Islam Prasanta Paul
Organization:
Deep Foundations Institute
Pages:
7
File Size:
836 KB
Publication Date:
Jan 1, 2015

Abstract

"Nhava Sheva (India) Gateway Terminal Private Limited proposed to construct a container terminal yard, comprising a back-up area at Jawaharlal Nehru Port Terminal (JNPT), Uran, Maharashtra. The proposed container terminal yard is located on a recent reclamation on the Thane Creek, which was developed by land-based reclamation method. The underneath soft marine clay was treated, using vertical band drains and placement of surcharge upon.Settlement of the reclamation during its construction was monitored using settlement plate installed at +4.8m CD elevation which was above the highest high water level.This paper examines the settlement behaviour of the reclamation during the ground improvement works. The geotechnical parameters are back-analyzed by the authors from the field settlement results and the concerned preloading details. The back analyzed coefficients of consolidation due to horizontal flow (Ch) are compared with laboratory determined parameters and the estimated value, using Asaoka Method (1978). The authors also studied field compression ratio [CR= Cc/(1+e0)] vs. the compression ratio determined by laboratory test using back-analysis method.1. INTRODUCTIONNhava Sheva (India) Gateway Terminal Private Limited proposed to construct a container terminal yard, comprising a back-up area of approximately 27 hectares, complete with associated buildings and services on a part brownfield/ greenfield site. The back-up area shall include a heavy duty block paved pavement with band beams for electric Rubber-Tyred Gantry Crane (eRTGC) alongwith surface water drainage system and other services including area lighting, provision of fire-fighting facilities , sources for potable water and power.Based on the Employer’s Requirement and the available geotechnical investigation report, ground improvement scheme is designed by the construction contractor. Ground improvement works included the installation of prefabricated vertical drains and subsequent placement of surcharge for accelerating the consolidation of the underlying soft marine clay."
Citation

APA: Aminul Islam Prasanta Paul  (2015)  Back Analysis of Field Instrumentation Results during Reclamation & Ground Improvement Works- A Case Study

MLA: Aminul Islam Prasanta Paul Back Analysis of Field Instrumentation Results during Reclamation & Ground Improvement Works- A Case Study. Deep Foundations Institute, 2015.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account