Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mining at Giant Yellowknife

    By D. C. McDonald

    "IntroductionTHE GIANT YELLOWKNIFE property is on the west side of Yellowknife bay, Great Slave lake, N.W.T., some 600 air miles north of Edmonton. This paper deals with the underground development an

    Jan 1, 1953

  • CIM
    Heating and Physical Separation for Cobalt Recycling from Spent Lithium Ion Battery

    By S. Usui, Y. Shinohara, C. Tokoro, K. Horiuchi, S. Owada

    Process optimization of heating and physical separation for Cobalt (Co) recycling from spent lithium ion battery (LIB) was investigated. LiCoO2 in spent LIB was transformed to LixCoO2 which was more e

    Jan 1, 2015

  • CIM
    Numerical analysis of coupled electron and mass transport in the gas diffusion layer of a PEMFC

    By P. C. Sui

    Numerical investigation and parametric simulations of the coupled electrical conduction and mass diffusion in the GDL of a PEMFC are reported. The coupled transport is solved using a 2D, "under-the-ri

    Jan 1, 2005

  • CIM
    Start-Up of The Iron Ore Company of Canada's Carol Concentrator

    By S P. Giambra

    The 50,000-ton-per-day Concentrator and Crushing Plant, complete with its related water supply, tailings disposal and concentrate handling systems, was started up in a five-month period, with the enti

    Jan 1, 1963

  • CIM
    Air-decking principle and its applications in production and presplit blasting

    By P. Pal Roy, R. B. Singh

    "This paper focuses on a number of interesting results to establish the theory and principle of air-deck blasting. It also gives the mechanism of breakage that takes place in air-deck blasting under v

    Jan 1, 2001

  • CIM
    Geological Setting and Characteristics of the Red Chris Porphyry Copper-gold Deposit, Northwestern British Columbia (ca399b4d-6ba4-48c8-871a-229dc866c010)

    By C. H. Ash

    "The Red Chris Cu-Au deposit (522.7 Mt at 0.35% Cu and 0.27 g/t Au), northwestern British Columbia, is one of several pre-accretionary porphyry systems in the Cordillera of westernCanada. It is hosted

    Jan 1, 1997

  • CIM
    Brève comparaison des casques à principe actif pour une utilisation dans l’environnement minier

    By R. Le

    "The principles of noise control aredescribed with particular emphasis on personalactive units as opposed to passive ear muffspresently in general use. A discussion followsfor their potential use in a

    Jan 1, 1997

  • CIM
    Progressive Texture Evolution during Annealing of Hot Deformed Mg-Al-Sn Alloy

    By A. S. H. Kabir, I-H. Jung, J. Su, Yue. S., M. Sanjari

    One of the major problems associated with conventional wrought magnesium alloys is the unwanted basal texture that forms during plastic deformation which generally does not change markedly after post-

    Jan 1, 2015

  • CIM
    Implementation of an Advanced Thickener Underflow Density Control at Loulo Gold Mine, Mali

    By D. Sagara, V. G. Makhado

    "A model based control strategy was implemented at Loulo Gold Mine in Mali, to stabilise the thickener underflow stream density. This stream acts as the feed to the leaching circuit. pH control of the

    Jan 1, 2017

  • CIM
    Vertical crater retreat mining at the Centennial Mine of Hudson Bay Mining & Smelting Co., Limited

    By C. S. Crocker

    The Centennial orebody was discovered and named in 1970, Manitoba's centennial year. It is relatively small, about 2 million tons. Strike length varies from 400 to 600 feet and widths from 10 to

    Jan 1, 1979

  • CIM
    Assessment of the Impact of Water-Cooled Chill Technology on Microstructure Length-Scales in an A319 Engine Block Casting

    By Daan Maijer, Wade Marquardt, Robert MacKay, Steven Cockcroft, Farzaneh Farhang Mehr

    "To comply with the new Corporate Average Fuel Economy (CAFE) standards, the automotive industry is aiming to reduce weight and increase the power and efficiency of small displacement engines through

    Jan 1, 2017

  • CIM
    Formability Correlation between Texture Weekening and Deformation Mechanism in a Rolled AZ31 Magnesium Alloy COM 2014 - 54th Annual Conference of Metallurgists held in Conjunction with AMCAA - America's Conference on Al Alloys

    By H. Utsunomiya, J. Su, K. S. Tamimi, S. Yue, M. Sanjari, L. Kestens, A. S. Kabir, R. Petrov

    The recrystallization and texture evolution of AZ31 sheets obtained through two stages was investigated at different stages of post-rolling annealing. The specimens were rolled at the temperature of 1

    Jan 1, 2015

  • CIM
    Backfill Optimization and in-House Shotcrete Production at the Cluff Lake Mine

    By Jamel Sgaoula

    During 1998 COGEMA Resources Inc. announced that operations at the Cluff Lake mine will be suspended indefinitely by the end of year 2000 as a result of deteriorating uranium market conditions. To rem

    May 1, 2001

  • CIM
    Lidar System for Mine Shaft Inspection, Surveying and Monitoring

    By B. Vorobyov

    A Canadian company, Sight Power Inc., has developed a revolutionary, fully automated shaft monitoring and inspection system for deep-level mining based on a 3D mobile laser scanning technology. It con

    Aug 1, 2013

  • CIM
    Hydraulic Air Compressors ? A Forgotten Solution for Mine Air Power And Mine Ventilation?

    By D. L. Millar

    The hydraulic air compressor (HAC) is driven only by water, held up by a dam, to create relatively low head (typically 10-20 metres), such that the developed hydropower is used to cause flow in openin

    Aug 1, 2013

  • CIM
    High-Intensity Waterless Cooling for Refractory Lined Vessels

    By B. Wasmund, M. Parravani, M. Jastrzebski, Z. Coull

    "One of the main drivers of overall profitability of pyrometallurgical vessels is refractory lining campaign life. Increased economic pressure to improve vessel life requires innovative solutions to t

    Jan 1, 2015

  • CIM
    Predicting Locked Cycle Flotation Test Results from Batch Data (9b93f081-168f-46c4-8d36-c19edeaa341b)

    By G. E. Agar, W. B. Kipkie

    "This paper deals with the prediction of locked cycle flotation results from data developed from individual batch tests. A postulate is made that the distribution of material in a separation stage is

    Jan 1, 1978

  • CIM
    Wear & Design Improvements in Discharge Cones for Large SAG/AG Mills (a95ef7ab-6071-475c-8b9c-363d74a295c8)

    By Craig Faulkner

    Discharge cones for large Semi Autogenous Grinding (SAG) and Autogenous Grinding (AG) mills are subjected to high wear as significant volumes of ground ore and slurry exit the mill. With the larger di

    Jan 1, 2012

  • CIM
    Devonian Limestone Reef Reservoir, Swan Hills Oil Field, Alberta

    By Dr. Ralph W. Edie

    The limestone reef reservoir at Swan Hills consists essentially of a "buildup" of successively smaller atoll-like layers. Precipitation of calcium carbonate within the lagoonal area of each layer esse

    Jan 1, 1961

  • CIM
    Comparison of Chalcocite Leaching In Ferric Chloride and Cupric Chloride Media

    By M. Hashemzadeh

    The efficiency of water use is a top priority for the global minerals industry, especially in regions with limited freshwater supplies. In these areas, the freshwater shortage has prompted mining comp

    Jan 1, 2019