Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • CIM
    Seismic Risk Management at LaRonde Mine

    By Frederic M. Langevin

    ?? Introduction ?? LaRonde ?? History of Seismicity and Rockbursting ?? November 27th 2002 Rockburst ?? April 1st 2006 Rockburst ?? December 11th 2006 & January 11th 2007 Rockbursts ?? Seismic R

    Feb 1, 2008

  • CIM
    Viceroy Minerals Corporation = Brewery Creek Mine Process Overview

    By Brad Thrall, Howard Bradley, Michael Samuels

    "LOCATIONViceroy Minerals Corporation owns and operates the Brewery Creek heap leach gold mine located approximately 55 kilometers northeast of Dawson City, Yukon Canada. Dawson was home of the Klondi

    Jan 1, 1999

  • CIM
    Ground granulated blast-furnace slag for cemented mine backfill: production and evaluation

    By E. Douglas, V. M. Malhotra

    "This report presents the results of a laboratory study undertaken to evaluate ground granulated blast-furnace slag from Algoma Steel Corporation, as a replacement for Portland cement in cemented mine

    Jan 1, 1989

  • CIM
    Improving Concentrate Grade through Smart Design and Piloting

    By T. Strong

    "Selectively recovering pentlandite from high levels of pyrrhotite presents a technical and operational challenge. The liberation characteristics and also the chemical environment is critical to perfo

    Jan 1, 2017

  • CIM
    The Cigar Lake project - mining, ore handling and milling (1463a4ec-6903-4c1d-b800-831570ba9799)

    By C. R. Edwards

    "The Cigar Lake project will develop the world’s second largest high grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U

    Jan 1, 2002

  • CIM
    The Business Case for LHD Automation at Kidd Creek ? the World?s Deepest Base Metal Mine

    By Zachary Mayer

    Agenda ? Kidd Mine ? Background ? Problem & Opportunity ? Challenges associated to depth - Production Rates - Productive Work Time - Operational Delays - Transfer Levels - Mucking Time - Impa

    Aug 1, 2013

  • CIM
    A study on the effects of potash contamination on the performance of hydraulic components using fire resistant fluids

    By K. Szafran, R. E. L. Seal, M. Tansey

    Conversion of hydraulic equipment to fire resistant fluids has been hampered by less than satisfactory component performance and in some cases, catastrophic equipment failure. Concern over identifying

    Jan 1, 1988

  • CIM
    Utilization of gold mill tailings as a secondary resource in the production of a high strength total tailings paste fill

    By L. M. Amaratunga, G. G. Hein, D. N. Yaschyshyn

    Fine tailings produced in the milling process have traditionally been disposed of in tailings ponds. Attempts have been made to use these fine tailings in backfill, however, to date the majority of ba

    Jan 1, 1997

  • CIM
    Computerized cost estimating for underground mines

    By J. B. Scott

    "A computerized cost estimating program developed with the use of the Lotus 1-2-3 spreadsheet program has produced dramatic savings in preparing estimates for operating costs, equipment fleet size and

    Jan 1, 1988

  • CIM
    Wastewater Treatment at Hudson Bay Mining and Smelting Company Limited, Flin Flon, Manitoba

    By R. V. Typliski, G. J. Labarre

    "Hudson Bay Mining and Smelting Co., Limited, Flin Flon, Manitoba, Canada, has developed a metallurgical wastewater treatment system employing two-stage lime neutralization, sludge recirculation and c

    Jan 1, 1980

  • CIM
    MLA: The New Sherlock Holmes of the Mining and Metallurgical Engineering Industry

    By Paul Miranda, Corby Anderson

    "The Center for Advanced Mineral and Metallurgical Processing (CAMP) has recently obtained a Mineral Liberation Analyzer (MLA). CAMP has utilized the technology for several projects with excellent res

    Jan 1, 2007

  • CIM
    Starting Koala North ? North America?s First Underground Diamond Mine

    By Paul Harvey

    Following initial discovery in 1991, BHP Billiton Diamonds Inc opened Canada?s first diamond mine, the Ekati Diamond Mine TM (Ekati) in the Northwest Territories on October 14th, 1998. Four short year

    May 1, 2003

  • CIM
    A Best Practice Database for Energy Management Initiatives in the Mining Industry

    By M. Y. Levesque

    The Australian Government?s Energy Efficiency Opportunities (EEO) program launched in 2006 obliges companies that use more than 0.5 PJ (petajoule) or roughly 139 GWh (gigawatt hour) per year to conduc

    Aug 1, 2013

  • CIM
    A Review of Gas Dispersion Studies in Flotation Plants

    By Jan E. Nesset, Julie Fournier, Jorge Torrealba, Colin Hardie

    "Gas dispersion studies have been used to benchmark and optimize plant flotation performance for more than a decade, although this technology is not as widely in use as it likely should be based on th

    Jan 1, 2015

  • CIM
    The genesis of giants: lessons from the Tambogrande VMS district, Perú - (POWER POINT)

    By Lawrence Winter

    why are these deposits significant? (i) economically and (ii) in a VMS/geological context. ?Significance of the tectonic setting. ?New understanding of the regional geology: volcanic stratigraphy, f

    May 1, 2006

  • CIM
    The Benefits and Challenges of “Split Milling” at the Williams Mill

    By Glenn Norris, Tyler Buckingham

    "Gold recovery gains in the order of one to two percent have been realized in 2009 due to changes in the operation of the grinding circuits at Barrick Gold Corporation’s Hemlo - Williams Mill. The ini

    Jan 1, 2010

  • CIM
    The evolution of cut-and-fill mining techniques at the Inco Limited Levack Area mines

    By D. M. May

    "Cut-and-fill mining is a stoping method that has been widely utilized in the mining industry over the past forty years. It took preference over shrinkage methods at Levack in the early 1930sbecause o

    Jan 1, 1981

  • CIM
    Concepts for the Extraction of Rare Earths from Spent Phosphors

    By S. Luidold, A. Poscher, H. Antrekowitsch

    "The rare earth elements (REE) are nowadays mainly used for permanent magnets, catalysts, hydrogen storage alloys in rechargeable batteries, for glasses, ceramics, and polishing agents. Other importan

    Jan 1, 2012

  • CIM
    Commissioning of a Brownfield CDS Plant: Victories and Pitfalls (48th Annual Canadian Mineral Processors Operators Conference)

    By N. Romani, R. Provost

    "Commissioning of a circulating dry scrubber (CDS) plant was recently completed at an existing facility in Québec, Canada. The CDS plant treats the sulphur dioxide off-gas emitted from rotary kilns i

    Jan 1, 2016