Viceroy Minerals Corporation = Brewery Creek Mine Process Overview

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 10
- File Size:
- 698 KB
- Publication Date:
- Jan 1, 1999
Abstract
"LOCATIONViceroy Minerals Corporation owns and operates the Brewery Creek heap leach gold mine located approximately 55 kilometers northeast of Dawson City, Yukon Canada. Dawson was home of the Klondike Gold Rush 100 years ago. Upon startup in November 1996, the Brewery Creek Mine was the northernmost operating heap leach gold mine in North America and one of the most northern in the world. Located at 64"" 02' latitude, the mine is less than 300 km south of the Arctic Circle. Access to the mine is available at Kilometer 14 of the Dempster Highway, linking Inuvik, NWT and the Klondike Highway, 40 kilometers east of Dawson City. The immediate vicinity is the only part of Canada not glaciated in the Wisconsin advance, which has resulted in an oxide ore deposit due to approximately 80,000 years of weathering - an area unique in Canada.DESCRIPTION OF OPERATIONSIn order to utilize heap-leaching technology successhlly in an extreme northern climate, a number of design features were incorporated into the process flow sheet to operate on a year round uninterrupted basis. Winter temperature may dip below minus 50 ""C, demanding an approach to mining and leaching that is different from heap-leach operations in more temperate climates. Because of the severe winter temperatures, the mine operates approximately 2 10 days per year, while the leaching process is continuous on a year round basis. Run of mine ore (ROM) is placed on the heap beginning in mid April until late October. Overall gold recovery is projected to be 78% over a 325 day leaching cycle with annual production levels of 2.3 million tonnes of ore placed on the pad, with an average of 75,000 ounces of gold recovered per year. The recovery process utilizes conventional sodium cyanide leaching, carbon adsorption, high pressure stripping, thermal reactivation and acid washing, and on-site smelting.HISTORYFollowing a comprehensive governmental and public review of the proposed project, a Class A Yukon Water license was issued in August, 1995. Construction started in 1995 and leaching commenced in October 1996.A Socio-Economic Accord with the Tron Dek Hwech'in First Nations provides for employment, contract, and scholarship opportunities for First Nations citizens."
Citation
APA:
(1999) Viceroy Minerals Corporation = Brewery Creek Mine Process OverviewMLA: Viceroy Minerals Corporation = Brewery Creek Mine Process Overview. Canadian Institute of Mining, Metallurgy and Petroleum, 1999.