Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Measurement and Assessment of Bulk Explosive Products

    By G Cavanough, A Olsson, J Rock, A C. Torrance

    There are various methods currently in use to determine detonation performance of bulk explosive products including velocity of detonation (VOD), high speed photographic analysis, fragmentation analys

    Aug 24, 2015

  • AUSIMM
    Description of Lead Refinery

    The building is a lofty, well-ventilated one of hardwood frame, with galvanized-iron walls and roof, and consists of five spans running north and south, covering a total length of 236 ft. Each span is

    Jan 1, 1918

  • AUSIMM
    Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai Mine

    By D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah

    Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected

    Aug 24, 2015

  • AUSIMM
    Realisation of Value through Identification of Various Oxidation Fronts and Mineralisation Styles at Trilogy Cu-Au-Ag-Pb-Zn Deposit

    By B Armstrong

    The Proterozoic poly-metallic Trilogy deposit was discovered in 1997, and until recently, mining evaluation was stalled due to poor metallurgical performance. Unlocking the substantial economic value

    Sep 5, 2011

  • AUSIMM
    Should earthquake loading be considered for open pit slope design in Australia?

    By F Weir, B Estrada

    The impact of seismic loading on open pit slope stability in Australia is often only considered where the slopes are located adjacent to tailings facilities or other major infrastructure. The debate r

    Jun 22, 2022

  • AUSIMM
    Maximising the value of a drilling program – case study in a challenging environment

    By A A. Latscha, D O’Connor

    Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO

    May 24, 2023

  • AUSIMM
    Tubular Drainage and Lining Geocomposite for Mine Tailings and Heap Leach Pads

    By Y Durkheim, P Saunier, L Ameglio

    "In the last decade Afitex developed the Draintube™ geocomposite, which provides simultaneous drainage and waterproofing functions. This new type of drain tubes planar geocomposites (DTPG) differs fro

    Jul 27, 2015

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    Developing dephosphorisation technique for iron ore with reductionprocess

    By K Higuchi, K Saito, O Ishiyama

    Iron ore in Australia is predicted to increase in its phosphorus content in the near future, which is detrimental to properties of steel product. Steelmakers are concerned by the content of phosphorus

    Sep 18, 2023

  • AUSIMM
    Wet High Intensity Magnetic Separators Circuit Modelling

    By J D. Grobler

    In the heavy minerals industry wet high intensity magnetic separators (WHIMS) are widely applied for primary magnetic separation of magnetic minerals and non-magnetic minerals. This piece of equipment

    Oct 5, 2011

  • AUSIMM
    The Scratch Test – An Attractive Method to Measure the Strength of Iron Ore Material

    By L Mariano

    Three selected iron ore samples from the major bedded and channel iron deposits of Western Australia were analysed using a scratch test commonly used in the oil and gas industry. The portable commerci

    Jul 11, 2011

  • AUSIMM
    Improving Extraction Efficiency from Witwatersrand Gold Tailings using Flotation and Ultra-Fine Grinding of Concentrates

    By D Capstick, M B. Ebell

    This paper describes the test work, process design, commissioning and operation of a processing system at the Ergo gold operation that improves the extraction efficiency from gold tailings material. T

    Sep 26, 2013

  • AUSIMM
    Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut Mine

    By Tilley H. L

    The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio

    Jan 1, 1989

  • AUSIMM
    The Inter-dependence of Mining and Mineral Beneficiation Processes on the Performance of Mining Projects

    By McKee D. J

    Much research is aimed at providing a revolutionary advance in technology that has the potential to render current mining and beneficiation problems obsolete. Such revolutionary advancements have b

    Jan 1, 1994

  • AUSIMM
    Managing Safety: Management's Role in Preventing Accidents

    An intensive safety campaign at Mount Isa Mines Limited from 1956 to 1966 saw the lost time accident frequency rate fall to half its original level. A review of the safety programme was carried out

    Jan 1, 1975

  • AUSIMM
    An Integrated Approach to Proactive Tailings Management

    By T Huynh, K Tungpalan, E Wightman, M Edraki, S Palaniandy

    Most preventive environmental management practices promote proactive integrated approaches to waste management. For example, life cycle assessment is often used to find the ‘hot spots’ of environmenta

    Jul 27, 2015

  • AUSIMM
    AEROPHINE® 3418A Promoter as a Secondary Collector to Boost Nickel Recovery at Forrestania Nickel Operations

    By C Munro, S Emery, M Flynn, K Tan

    "AEROPHINE® 3418A Promoter is a well-known and widely used collector and is an industry standard for its excellent selectivity and efficacy in the processing of complex polymetallic sulfide ores,

    Oct 10, 2016

  • AUSIMM
    Design of a Leaching Strategy to Extract Gold from Eleonore Mine Ultra-Fine Sulfide Concentrate

    By G DeschOnes, M Fulton

    The Eleonore property (James Bay district of Northern QuTbec), owned by Goldcorp, hosts gold within stockworks of quartz-tourmaline-arsenopyrite veins and veinlets contained within microcline (potassi

    Sep 26, 2013

  • AUSIMM
    Telfer Processing Plant Upgrade - The Implementation of Additional Cleaning Capacity and the Regrinding of Copper and Pyrite Concentrates

    By D R. Seaman, B Adamson, F Burns, B A. Seaman, P Manton

    The Telfer concentrator, located in the Great Sandy Desert of Western Australia, consists of a dual train gold/copper operation processing ore from one underground and, currently, two open pit mines w

    Oct 29, 2012

  • AUSIMM
    Northparkes Mines – Flotation and Planning for the Future

    By G Harbort, D Clarke, D Morgan, C Sola

    Northparkes Mines commenced production in 1994 and the mine has significant reserves to allow operation into the future. There are a number of potential future concentrator feed sources with variable

    Sep 1, 2014