Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Using Geostatistics to Assist in Optimising Grade Control Estimation at KCGM's Fimiston Open PitBy Kelly D, Moore C
The Golden Mile, which has been mined continuously for the past 100 years by both underground and more recently open pit methods, occupies an area of 1.2 km by 4 km adjacent to the city of Kalgoorli
Jan 1, 1994
-
In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case studyBy K Grohs, A Satriawan, S R. Pearce
Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi
Aug 2, 2023
-
Phosphorus Phase Analysis of Medium-Low-Grade Rare-Earths-Bearing Phosphate OresPhosphorus Phase Analysis of Medium-Low-Grade Rare-Earths-Bearing Phosphate Ores
Sep 13, 2010
-
Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground SupportBy V Louchnikov
Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th
Mar 21, 2011
-
Fluxing options and slag operating window for Metso’s DRI smelting furnaceBy K Vallo, T Haimi, J Pihlasalo, J Hamuyuni, M Lindgren, F Tesfaye
Decarbonisation of the steel industry has recently attracted a lot of research and technological development. Most of the technological developments are centred around the replacement of blast furnace
Jun 19, 2024
-
Use of Robust Design Methodology for Production Scale Definition in Open Pit MiningBy M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova
"Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus
Nov 15, 2016
-
Copper-Molybdenum Concentrator Surveys Using Mineralogy and Process Benchmarking Tools to Improve Overall Plant PerformanceBy P Thompson, D Rose, S Yu, W Baum, R Zahn, D Meadows, G Hall
Opportunities to improve mill operations are often cited by mining companies and recognised in many concentrators spread throughout the world but are not always followed through. Copper-molybdenum con
Sep 1, 2014
-
Synthetic Rutile from Westport Ilmenite by the Austpac ERMS ProcessThe ERMS Process was developed during four years of testwork by Austpac Gold NL to overcome the severe metallurgical problems of the ilmenite atWestport, in the South Island. These deposits have been
Jan 1, 1993
-
Lithospheric Footprints of Giant Orogenic Gold SystemsBy R J. Goldfarb, A B. Christie, D I. Groves
Small orogenic gold deposits have the same deposit-scale geological and geochemical features as those that characterise giant orogenic gold systems (>16 Moz Au). Therefore, a broader-scale approach
Jan 1, 2005
-
The Sams Creek Peralkaline Granite Hosted Gold Deposit, Northwest Nelson, New Zealand û Evolution of the Host Granite and Mineralising SystemBy K Faure
At Sams Creek a gold-bearing, peralkaline granite pophyry dyke intrudes Ordovician-Silurian metapelite and quartzite. The granite porphyry dyke has a thickness of up to 40 m, extends discontinuously f
Jan 1, 2004
-
Fluorine Removal From Ok Tedi Copper/Gold ConcentratesBy J W. Glatthaar, M Mavotoi
The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho
Jan 1, 2003
-
Ion Exchange in Hydrometallurgy - Secondary Metal Removal or Primary Production Technique?By J D. Illescas, S N. Arnold, D R. Shaw
Ion exchange (IX) as a primary production technique has been applied commercially since the 1950s; its application in the uranium industry continues to be widespread and is utilised to a lesser degree
Oct 29, 2012
-
Effectively Installing and Commissioning Flotation EquipmentBy B Murphy, J L. Heath
Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th
Sep 1, 2014
-
Robust construction and quality assurance culture for tailings storage facilities – equally important as robust design and review practiceBy M Laxman, A Kundu
After multiple tailings dam failures in recent times, the owner organisations have made increased efforts to step up the governance systems to industry best practise in the design, construction and op
Jul 23, 2018
-
The EMESRT Approach to Equipment Design - Bringing End Users into the PictureThe Earth Moving Equipment Safety Round Table (EMESRT) was established by mining companies in 2006 to influence manufacturer's equipment design through a process of engagement. 2010 EMESRT member
Dec 6, 2010
-
Technology Based Innovation - The Next DecadeThe minerals industry focus over much of the past twenty years has been on cost reduction and production growth supported, but not driven, by technology improvements. Mergers and acquisitions, and the
Sep 13, 2010
-
Exploration of the Horn Island Gold Deposit, Torres StraitThe Horn Island gold and mineral field produced 194 kilograms of gold in the 4 years subsequent to its discovery in 1894, from an area of shallow workings 1.5 kilometres x 0.5 kilometres. Gold deposit
Jan 1, 1986
-
A Banker's View of Cash Flow Methods in Mineral ValuationBanks' focus in using cash flow methods can differ markedly from that of equity investors. This paper attempts to explain and describe bankers' approach by: ò outlining the fundamental dif
Jan 1, 1994
-
Effect of Mineral Density for Milling Magnetite OresBy P Holtham, W Valery, P Baguley, A Jankovic
There is a growing interest in magnetite ores because of the increasing demand for this commodity. With these ores, there is significant cost associated with milling the ore to fine sizes using ball m
Jul 13, 2015
-
Life-of-Mine Ventilation System Upgrade at Springvale Colliery - A Case StudyBy B Smith, R Gelson
Springvale Colliery is an underground longwall mine situated approximately 10 km north-west of Lithgow in the western coalfields of New South Wales. Following a full-scale review of the mineÆs ventila
Jul 1, 2013