Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Engineering Geophysics - Mine Subsidence Risk Assessment Study

    By Kanaan Hanna

    Abandoned mines pose a serious threat to public health and safety, as well as the environment. When active workings approach old mine workings, miners could encounter significant hazards. Additionally

    Jan 1, 2011

  • SME-ICGCM
    Effect of In Situ Stresses on the Stability of Coal Mine Development Workings

    By Murali Gadde

    Among different types of ground control problems associated with underground coal mining, those related to in situ stresses are the most common ones affecting the safety and economy of a mining operat

    Jan 1, 2004

  • SME-ICGCM
    Tunnel Deformation Monitoring "Action Levels" In Coal Mines For Support/Reinforcement Design

    By Lorraine Kent

    Mine tunnel support using rockbolts was introduced in UK coal mines over the period 1987- 1992 and is now used in over 70% of all mine tunnels. In every case the reinforcement design has been based on

    Jan 1, 1999

  • SME-ICGCM
    Validation of Entry Stability Factors Determined By the Strength Reduction Method Against Empirical Approaches

    By Gabriel S. Esterhuizen

    The design of support for underground excavations is a complex process in which the interaction between supports and the rock mass must be evaluated. The strength reduction method (SRM) is useful beca

    Jan 1, 2013

  • SME-ICGCM
    The Effect Of Hazardous Geologic Structures On Gateroad Stability

    By Frank E. Chase

    Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g

    Jan 1, 1990

  • SME-ICGCM
    Review Of Pillar Design Equations Including The Effects Of Constraint

    By C. Babcock

    This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships

    Jan 1, 1981

  • SME-ICGCM
    Effect of Geological and Mining Factors on Roof Stability of a Room and Pillar Mine in US

    By Taghi Sherizadeh, Pinnaduwa H. S. W. Kulatilake

    "This paper examines the effect of different geological and mining factors on roof stability in underground coal mines by combining the field observations, laboratory testing, and numerical modeling.

    Jan 1, 2015

  • SME-ICGCM
    A Case History of Computer-Aided Lineament Analysis for Ground Control Planning

    By C. D. Peters

    The Bureau of Mines has been researching remote sensing analysis of an underground coal mining area in Utah and computer-aided methods of defining ground control hazards in this mining area. As a resu

    Jan 1, 1986

  • SME-ICGCM
    Jointing Effects On Pillar Strength

    By Gabriel Esterhuizen

    When designing pillars in coal and hard rock mines it is necessary to determine the strength of the rock mass forming the pillars. Empirical strength equations, based on rock mass classification techn

    Jan 1, 2000

  • SME-ICGCM
    Investigation And Analyses Of Sudden Outbursts Of Gas During Driving Of Mine Roadways (7ec61323-5f2c-44cc-b7ed-dc20f9515d9b)

    By Uros Bajzelj

    When driving mine roadways in the vicinity of tectonic disturbances and fault zones, sudden outbursts of gas, along with ejections of fine coal, occur. Substantial dynamic changes occur around the roa

    Jan 1, 1992

  • SME-ICGCM
    Numerical Modeling the Interburden Impact on Multiple-Seam Coal Mining in Western China

    By Jimin Su, Enguang Zhu, Kangning Zhang, Yang Li

    "The effect of interburden on overlying strata movement during the mining of a lower group coal seam is still a challenge in China. Based on the multiple coal seams in western China, numerical simulat

    Jan 1, 2017

  • SME-ICGCM
    Fiber Reinforced Polymer Rockbolts for Ground Control in a Strong Jointed Rock Mass

    By Samrat Mohanty

    The construction of underground hydrocarbon storage caverns in Jurong Island, Singapore, is nearing completion. The facility, located beneath the seabed of Banyan Basin, is comprised of five storage

    Jan 1, 2014

  • SME-ICGCM
    Mitigation of a Massive Sandstone Channel's Impact on a 1,500 Ft Wide Longwall Face

    By Daniel W. Su

    This paper presents the implementation and evaluation of the hydraulic fracturing technique and Longwall Visual Analysis (LVA) software to mitigate the impact of a 1,000-ft (305-meter) widemassive san

    Jan 1, 2012

  • SME-ICGCM
    A History of Bock Burst Research in the Coeur D'Alene Mining District

    By Michael Jenkins

    This paper reviews the history of rock burst research in the Coeur d'Alene Mining District of northern Idaho over the last 30 years. Rock bursting is a problem because of a combination of geologi

    Jan 1, 1987

  • SME-ICGCM
    Vertical Load Capacities of Roof Truss Cross Members

    By David F. Gearhart, Khaled M. Mohamed

    "Trusses are primarily used as passive roof supports in coal mines. They are constructed of three main parts: two grouted bolts installed at opposing forty-five degree angles into the roof so that the

    Jan 1, 2015

  • SME-ICGCM
    Subsidence Over Room and Pillar Retreat Mining in a Low Coal Seam

    By Andre Zingano, Anderson Weiss

    "The objective of this paper is to study the behavior of a low thick and low depth coal seam and the overburden rock mass. The mining method is room and pillar in retreat and partial pillar recovery.

    Jan 1, 2018

  • SME-ICGCM
    Three Dimensional Modeling of a Surface Displacements As a Result of an Underground Longwall Panel Extraction

    By Anton Sroka, Antoni Tajdus, Axel Preusse, Krzysztof Tajdus

    "In Europe, the magnitude and range of mining deformation predicted on the surface have been, in most cases, determined using methods based on Gauss' influence function (e.g., Knothe's theory, Ruhrkoh

    Jan 1, 2010

  • SME-ICGCM
    Support Strategy for Tailgates below Gob Edge Using Split-Level Longwall Panel Layout for Deep Inclined Coal Seams

    By Pengfei Wang, Guorui Feng

    With increase of cover depth, dynamic incidents, such as large gateroad convergences and coal bursts, are frequently encountered when mining deep longwall panels. It would be more adverse due to large

    Jan 1, 2018

  • SME-ICGCM
    Energy Concepts in the Analysis of Unstable Coal Pillar Failures

    By Eric C. Poeck, Ryan Garvey, Ugur Ozbay, Kun Zhang

    "A coal bump is characterized by the sudden failure of one or more pillars and an associated release of kinetic energy. Although the geologic conditions surrounding coal bumps are often similar, their

    Jan 1, 2015

  • SME-ICGCM
    Geotechnical Monitoring of Rock Mass and Support Behaviour around the UCG Georeactor: Two Case Studies in Polish Coal Mining Industry

    By Zbigniew Lubosik, Andrzej Walentek, Stanislaw Prusek, Sylwester Rajwa, Aleksander Wrana

    "Underground coal gasification (UCG) provides a solution to supply electricity from high ash coal or deep deposited seams. The coal is consumed in situ, and, accordingly, the ash is left underground.

    Jan 1, 2017