Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Inadequate Water Management Planning Resulting in Long-term Closure LiabilitiesBy H J. J Boshoff
Mine closure planning integrated into life-of-mine (LOM) planning during the operational phase consists of many subcategories. One of these subcategories that needs to be fully integrated into the LOM
Jul 16, 2014
-
Reducing ventilation change downtime and increasing operational uptimeBy J A. Rowland
When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during
Oct 12, 2022
-
Geology, Alteration and Mineralisation of the Tampakan Copper DepositBy A Madera, R Watt
The Tampakan deposit is a strongly telescoped high-sulphidation-epithermal/ porphyry deposit pair which is hosted by a sequence of probable Pliocene age subaerial andesite flows. These host units lie
Jan 1, 1999
-
Development in Cut and Fill Mining at ISA MineBy Jansen N
Production from the narrow, high grade silver-lead-zinc orebodies below 15 level commenced in mid 1985.Geological, mining research and recent mining experience determined that a mechanised drill, fire
Jan 1, 1985
-
Recent Developments in the Solvent Extraction of MetalsBy Lott JB, Scuffham JB
Until very recently the application of solvent extraction to. the recovery of metals has been considered only for ithose operations where no other process was available. In general, .these operations
Jan 1, 1970
-
On Structural Analyses of Oriented Bore Cores from the West Wallsend No.2 Colliery HoldingStructural analyses of oriented bore core sections from the West Wallsend No.2 Colliery Holding together with investigations in adjac- ent collieries and on the surface delineated structural phenome
Jan 1, 1972
-
Failure Rate of Process ComputersBy Weber W
Methods of calculation of the reliability of process computers are getting more and more important. The paper presents long period observations of 21 process computers with online applications in the
Jan 1, 1985
-
Initial Operation of the Hismelt Research and Development FacilityBy Winrove G. S, Herdie G. J, McCarthy C. A
Production of hot metal from the Hlsmelt Research and Development Facility at Kwinana, Western Australia commenced in October 1993. The stand-alone facility is a unique, coal-based, integrated ironw
Jan 1, 1995
-
Some Operating Practices in the 1100 Orebody at Isa MineBy Dolan P
Various operating practices have been developed over many years to ensure safe and efficient production from the 1100 orebody. Some of these practices are described.
Jan 1, 1982
-
Coal Resource Planning in the Hunter RegionBy Short KC
The Hunter Region, with a major part of the coal resources of New South Wales and a long history of coal mining, has experienced a rapid expansion of coal resource development in recent years. Whi
Jan 1, 1987
-
The Gassiness of Face Coal and the Occurrence of Gas Dynamic PhenomenaGas dynamic phenomena, particularly instantaneous outbursts of coal and gas are problems experienced in gassy, highly stressed coal, both usually the result of depth. Diff- erent mining geometries
Jan 1, 1986
-
The Thalanga Massive Sulphide DepositBy Hartley JS, Wills KJA
The Thalanga massive sulphide deposit is hosted by Upper Cambrian rhyolites and volcaniclastics of the Mt. Windsor Volcanics near their contact with overlying dacites, rhyolites and sediments of t
Jan 1, 1987
-
Six Metre Raisboring at Z.C. MinesProduction from a major, deep orebody requires the construction of two 6 m diameter, 1000 m deep ventilation shafts over the next three years. Further ventilation upgrades have foreshadowed an ad
Jan 1, 1988
-
Sinking the New Broken Hill Consolidated Circular AirshaftThe New Broken Hill Consolidated Airshaft is the first major undertaking in the development of New Broken Hill Consolidated Ltd's. property, which adjoins that of The Zinc Corporation Ltd. on the
Jan 1, 1940
-
Pre-Drainage of Methane in West German Coal MiningAt the beginning of the seventies pre- drainage of methane was introduced in West German coal mining in order to reduce the gas emission from the worked seam. After three pilot tests on the "Rheinl
Jan 1, 1982
-
Perimeter Blast Design at Mt Whaleback Mine, Newman, Western AustraliaThe Mt Whaleback open cut mine South Wall is, in part, developed as an unbenched dip slope. The remainder of the rock slope consists of asymetrical overturned folds which have been locally truncated
Jan 1, 1989
-
Advances in Particulates Aggregation-Flotation SeparationBy J Rubio
This work presents design features of an innovative in-line mixing helical (coiled) reactor for flocculation and flotation as a solid-liquid separation process for suspended particles (including liqui
Jan 1, 2005
-
Exploration Possibilities for Diamonds in VictoriaDiamonds occur in N.S.W., Victoria and north west Tasmania. Diamonds from different areas appear to have their own characteristics, lending weight to the suggestion that three or four different sou
Jan 1, 1979
-
A geostatistical Approach to Coal Reserve ClassificationBy Just GD, Gillies ADS
There is an increasing need for reliable and comparable coal resource data and it is necessary to standardize the traditional classification procedures by quantifying the three basic evaluation crit
Jan 1, 1987
-
Rehabilitation at Strongman Mine, West Coast, New ZealandCoal mining ceased at Strongman Mine this year after 70 years of production. Underground mining finished in 2003 and opencast methods began in 1998. During the life of the mine, 8 million tonnes of co
Jan 1, 2006