Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Permitting, Construction and Commissioning of the Gosowong Gold Mine, Halmahera, Indonesia

    By D J. Corp

    The Halmahera Contract of Work is a sixth generation contract held 82.5 per cent by Newcrest Mining Limited and 17.5 per cent by PT Aneka Tambang and takes in the Gosowong Project area. In 1991 Newcre

    Jan 1, 1999

  • AUSIMM
    Dilution, Ore Grade and Blast Movement Calculation Model

    By I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite

    This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope

    Aug 24, 2015

  • AUSIMM
    Wireframe-Free Geological Modelling – An Oxymoron or a Value Proposition?

    By E J. Cowan

    Efficiency demands that mine geologists devote the most time to tasks where they can have the biggest effect on production. One of the most time-consuming tasks is geological interpretation of the ore

    Aug 22, 2011

  • AUSIMM
    Stripping of the Southern Exhaust Airway at Mount Lyell

    In the latter half of 1973 a contract was given to Roberts-Holland Joint Venture for the stripping of the southern exhaust airway.The contract was carried out efficiently and relatively cheaply. It wa

    Jan 1, 1974

  • AUSIMM
    The Occurrence of Gold in the Broken Hill Lode

    The smelting of the Broken Hill lead concentrates at the Broken Hill Asso,ciated Smelters produced, among other products, approximately 4,900 ounces of gold and 8,800,000 ounces of silver during the y

    Jan 1, 1940

  • AUSIMM
    The Acid Leaching Process for the Synthesis of Zeolitic Material from Paper Sludge Ash

    The Acid Leaching Process for the Synthesis of Zeolitic Material from Paper Sludge Ash

    Sep 13, 2010

  • AUSIMM
    Dip Sampling Cyanide Gold Bullion at the Sons of Gwalia Gold Mine, Gwalia, Western Australia

    The difficulty of accurately sampling cyanide gold bullion for valuation is well known, and nothing new or original is claimed in presenting this paper, but it was thought that a record of differences

    Jan 1, 1931

  • AUSIMM
    Economics of Mine Planning and Equipment Selection

    This paper examines some of the fundamental economics of mining - in particular, for optimisation studies, for production rate determination and for reserve estimates.It includes introductory discussi

    Dec 6, 2010

  • AUSIMM
    Production Capacity Optimisation in the Presence of Grade Uncertainty

    Grade uncertainty can have a number of important implications for a mining operation. One of the most significant risks in not considering grade uncertainty in planning is the over or under allocation

    Dec 6, 2010

  • AUSIMM
    The Treatment of Silicosis by Aluminum Powder

    By Blaisdell J. L, MacPherson G

    The present communication records the results of a research investigation conducted in the Porcupine Gold Mines in Timmins, Onto. Soon after silicosis became a compansable disease in Ontario under the

    Jan 1, 1945

  • AUSIMM
    Challenges and limitations in development of large thermodynamic databases for multiple molten phases using the Modified Quasichemical Formalism

    By E Jak, M Shevchenko, E Nekhoroshev, D Shishin

    In the field of pyrometallurgy, the presence of multiple molten phases with distinct chemical compositions, such as slags, mattes, speiss liquids, metals and molten salts, is a well-known phenomenon.

    Aug 21, 2024

  • AUSIMM
    Interactions between Flash Flotation and Gravity Concentration – An Industrial Case Study of a Refractory Gold Concentrator

    By D Semini, B Newcombe

    Base-metal sulfide refractory gold ores often contain a portion of ‘free’ gold that is amenable to recovery using gravity concentration methods, whilst the refractory portion of the gold is better rec

    Sep 1, 2014

  • AUSIMM
    Three-Dimensional Hydromechanical Simulation for Large, Faulted Pit Slopes

    Owing to improvements in computer capacity, it is now possible to undertake fully coupled or partially coupled, three-dimensional (3D) hydromechanical Finite Element (FE) simulation of mines, includin

    May 1, 2010

  • AUSIMM
    Effects of FeO/SiO2 ratio and optical basicity on viscosity and melt structure of FeO–SiO2–Al2O3–CaO–MgO–Cr2O3 melts

    By C Samuelsson, Q Shu, A Lennartsson, F Gyakwaa, A Andersson, J Isaksson

    The physico-chemical property, viscosity, is essential for pyrometallurgical processes and influences the settling rate of valuable metal droplets in slag, affecting the metal recovery. The copper sla

    Jun 19, 2024

  • AUSIMM
    Determination of the Structure of the Bulli Coal Seam at Appin Colliery, N.S.W., by the Seismic Reflection Method

    The structure of the Bulli coal seam at Appin Colliery was detailed by the seismic reflection method. This unusual application of the seismic method was possible because there is a reflector near the

    Jan 1, 1965

  • AUSIMM
    High Temperature Interactivity of Iron Ores in the Cohesive Zone of the Blast Furnace

    By X L. Liu, W Huang, J M. Zhu, S L. Wu

    The shape, position and thickness of the cohesive zone have a great influence on the operational performance of the blast furnace. Many researchers have found that the high temperature properties of i

    Jul 13, 2015

  • AUSIMM
    Blast Hole Burden Design Introducing A Formula

    In blasting large tonnages of ore or material, the economy of the operation 'depends mainly on the mine manager's judgment in placing the holes to the best possible advantage and in determin

    Jan 1, 1952

  • AUSIMM
    Flotation Energy Consumption and Opportunities for Improvement

    By B Murphy

    Traditionally comminution optimisation has been focused on energy minimisation, whereas flotation optimisation has been focused on recovery improvement. One of the largest, if not the largest, operati

    Jul 15, 2013

  • AUSIMM
    Application of Gold Fineness to the Search for Ore

    It has been fairly firmly established (Fisher, N. H., 1945) that the fineness of the gold in any ore deposit varies with the depth from the surface at which the deposit was formed, and, as a corollary

    Jan 1, 1950

  • AUSIMM
    Platinum Mining and Sustainability - Understanding the Environmental Costs of Future Technologies

    By G M. Mudd

    The growing popularity of platinum and platinum group metals (or PGMs, including palladium, rhodium and others) for a wide range of applications leads to some interesting issues for mining and sustain

    Jan 1, 2009