Production Capacity Optimisation in the Presence of Grade Uncertainty

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
11
File Size:
1096 KB
Publication Date:
Dec 6, 2010

Abstract

Grade uncertainty can have a number of important implications for a mining operation. One of the most significant risks in not considering grade uncertainty in planning is the over or under allocation of processing or mining capacity when compared to realised grades. This could lead to wasted capital expenditure or missed opportunities to add value. This paper demonstrates a method that optimises production capacity and mining schedules in the presence of grade uncertainty. Applying this method to the case study of a nickel deposit recommended a reduction in processing capacity, an increase in mining capacity and more extensive utilisation of stockpiles than optimisations completed with traditional methods. As a result, average NPV improvements of between seven per cent and 27 per cent were gained.
Citation

APA:  (2010)  Production Capacity Optimisation in the Presence of Grade Uncertainty

MLA: Production Capacity Optimisation in the Presence of Grade Uncertainty. The Australasian Institute of Mining and Metallurgy, 2010.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account