Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Studies On Effect Of Cu(Ii) On Growth Of Thiobacillus Ferrooxidans Using Series Piezoelectric Quartz CrystalBy M. Okido, W. Wei, L. Chai
The kinetics on the growth of Thiobacillus ferrooxidans was studied by use of series piezoelectric quartz crystal ( SPQC ). Arsenic ioninhibits the growth of Thiobacillus ferrooxidans, which is consis
Jan 1, 2000
-
Improved Process Control Through Real-Time Measurement Of Mineral ContentBy D. Hopkins, D. Türler, R. D. Giauque, W. B. Davis, M. Karaca
In a highly collaborative research and development project with mining and university partners, sensors and data-analysis tools are being developed for rock-mass characterization and real-time measure
Jan 1, 2002
-
Development And Large-Scale Testing Of Innovative Tunnel Support SystemsBy Robert M. Semple, Harvey W. Parker
INTRODUCTION Two promising innovative tunnel support systems are being developed by the Civil Engineering Department of the University of Illinois. One of these is a lining which can be placed by a
Jan 1, 1997
-
International education of mining engineers ? an update on the Australian experience and international opportunities for collaborationCollaboration between education providers is the key to long-term sustainability and improved quality in mining education. The mining industry is now, more than ever, an industry doing business on a g
Jan 2, 2010
-
Evinos-Mornos Tunnel – Greece Construction of a 30 Km Long Hydraulic Tunnel in Less Than Three Years Under the Most Adverse Geological ConditionsBy Remo Grandori, Manfred Jaeger, Fabrizio Antonini, Luis Vigl
The EVINOS-MORNOS tunnel project with its 30 km of length is one of the longest hydraulic tunnel in the world realised with TBM method. The adverse geological conditions, the high cover and the sho
Jan 1, 1995
-
Some MINExpo Exhibitors PreviewedBortech’s BoreClad corrosion protection system will be displayed at MINExpo. BoreClad is an innovative system for inside diameter cladding of nozzles, tubes and other circumferential devices. Pressu
Jan 1, 2004
-
Capillary Cover Design For Leach Pad ClosureBy K. Burke, G. Zhan, A. Mayer
A cover with capillary barrier effects (CCBE) is being constructed on the AA Leach Pad at the Barrick Goldstrike Mine site near Carlin, Nevada. The purpose of the cover is to eliminate/minimize infil
Jan 1, 2001
-
Challenges Of Conveyors In TunnelingBy Marco Sonnenschein
As time is costly, engineering companies have developed methods, procedures and mechanical equipment to tunnel faster. But the best excavation method will not be able to cope with the time pressure if
Jan 1, 2012
-
The Tai Po to Butterfly Valley Aqueduct in Hong KongBy Derek. C. Arnold
In order to meet increasing demands for water supply in the next millennium, the Government of the Hong Kong Special Administrative Region have identified the need for a major new water treatment and
Jan 1, 1999
-
Optimum Chain Pillar Design at the Deepest Multi-Seam Longwall Workings in India Mining, Metallurgy and Exploration (c1221f6a-70cf-4429-9a4d-13a3e324a05a)By Nilabjendu Ghosh, Satyendra Kumar Singh, Gautam Banerjee, Harshit Agrawal
High-production methods like longwall mining with hydraulic powered supports are necessary to increase underground coal production in India. Longwall mining had a mixed success record for Indian geo-m
-
Energy Dissipation and Fragmentation of Granite Core During High Velocity Impact Mining, Metallurgy and ExplorationBy Ying Lu, Jeffrey C. Johnson, Chen-Luh Lin, Jan D. Miller, Sindhoora Puvvada
Energy dissipation and fragmentation of rock is of interest for mine-to-mill operations in order to understand breakage and to minimize energy consumption during blasting at the mine site, and comminu
-
Boart Longyear Coring Bits Pass Field TestsUsing mines in Canada, Boart Longyear, a leading provider of drilling services and products, has put its Stage 3 Coring Bit to the test and each time the bit has passed the test with great success. A
Jan 1, 2009
-
Plant Design, Practice Conference Attracts Processing SpecialistsBy William R. Yernberg
The Mineral Processing Plant Design, Practice and Control Conference was held from Oct. 20through 24, 2002, at the Fairmont Hotel, Vancouver, British Columbia, Canada. The conference was attended by
Jan 1, 2003
-
Optimum Chain Pillar Design at the Deepest Multi-Seam Longwall Workings in India Mining, Metallurgy and ExplorationBy Nilabjendu Ghosh, Satyendra Kumar Singh, Gautam Banerjee, Harshit Agrawal
High-production methods like longwall mining with hydraulic powered supports are necessary to increase underground coal production in India. Longwall mining had a mixed success record for Indian geo-m
-
Rheological Behaviors In Wet Ultrafine Grinding Of LimestoneThis paper investigates the effects of solids concentration and the addition of Dispersant S40 on the flowability of original and ground limestone slurries. A rotational viscometer with a concentric c
Jan 1, 2007
-
Maximizing Efficiencies In Thickeners - Automatic Flocculant Dosing Control For Mining Thickeners And ClarifiersBy J. Evans
Including: Tailings thickeners, CCD?s, paste thickeners, HI-rate thickeners, lamella thickeners, high compression thickeners, clarifiers etc. Flocculant dosing control for mining thickeners and clarif
Jan 1, 2011
-
Geology Of The Biwabik Iron Formation And Duluth ComplexBy Mark A. Jirsa
The Biwabik Iron Formation is a ~1.9 billion year-old sequence of iron-rich sedimentary rocks that was metamorphosed at its eastern- most extent by ~1.1 billion year-old intrusions of the Duluth Comp
Jan 1, 2007
-
Long-Term Stability Of Overburden Above Room And Pillar MinesBy Gennaro Gerald Marino
Vast improvement in methods of design and analysis of the long- term stability of overburden above room and pillar mines is needed. Improved methods are vital for planning and land development and for
Jan 1, 1986
-
Pumping and DrainageBy Christopher J. Bise
INTRODUCTION The control of nuisance water in a mine is extremely important; left uncontrolled, nuisance water can have a severe effect on haulage, ventilation, production, and the health and safe
Jan 1, 1986
-
Energy Dissipation and Fragmentation of Granite Core During High Velocity Impact Mining, Metallurgy and Exploration (1de527b1-559a-4ec3-825e-46bd7ac58c2b)By Ying Lu, Jeffrey C. Johnson, Chen-Luh Lin, Jan D. Miller, Sindhoora Puvvada
Energy dissipation and fragmentation of rock is of interest for mine-to-mill operations in order to understand breakage and to minimize energy consumption during blasting at the mine site, and comminu