Evinos-Mornos Tunnel – Greece Construction of a 30 Km Long Hydraulic Tunnel in Less Than Three Years Under the Most Adverse Geological Conditions

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 21
- File Size:
- 1274 KB
- Publication Date:
- Jan 1, 1995
Abstract
The EVINOS-MORNOS tunnel project with its 30 km of length is one of the longest hydraulic tunnel in the world realised with TBM method. The adverse geological conditions, the high cover and the short construction schedule were a great challenge for the successful construction of this tunnel. The paper will describe: the criteria adopted for the tunnel design, the selection of the construction methods and equipment, the productions of the 4 TBMs adopted and the comparison of the behaviour of the different type of TBMs in the various rock conditions, including special conditions, the characteristics of the adopted in situ and precast linings, a comparison between the foreseen and actual construction schedules, the contractual implications of realising a tunnel in such a severe and complex conditions.
Citation
APA:
(1995) Evinos-Mornos Tunnel – Greece Construction of a 30 Km Long Hydraulic Tunnel in Less Than Three Years Under the Most Adverse Geological ConditionsMLA: Evinos-Mornos Tunnel – Greece Construction of a 30 Km Long Hydraulic Tunnel in Less Than Three Years Under the Most Adverse Geological Conditions. Society for Mining, Metallurgy & Exploration, 1995.