Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Finding Added Value At Newmont Through Large-Scale Mining Sequence, Cutoff Grade And Process Optimization Using Mixed Integer Linear Programming
By L. Clark
Despite near-record commodity prices, the mining industry continues to search for ways to maintain profits in these times of steadily increasing energy prices and steadily decreasing grades. The pres
Jan 1, 2007
-
Field Application of NTH Fracture Classification at the Second Manapouri Tailrace Tunnel, New Zealand
By Don F. Macfarlane
This paper describes the field application of the NTH fracture classification to rock encountered in the construction of the 9.6 km long, 10m diameter, Second Manapouri Tailrace Tunnel. Excavation of
Jan 1, 2008
-
Molecular Gate® Adsorption System For The Removal Of Carbon Dioxide And / Or Nitrogen From Coalbed And Coal Mine Methane
By Micheal Mitariten
The recovery of natural gas (primarily methane) from coalbed deposits is an established and growing source for the U.S and accounts for over 7% of its total production. The gas from on-purpose degass
Jan 1, 2005
-
Industrial Minerals 2005 – Construction Aggregates
By T. J. Nelson
Natural aggregates, primarily stone, sand and gravel, are recovered from widespread, naturally occurring mineral deposits and processed for use primarily in the construction industry. They are mined,
Jan 1, 2006
-
Multi-Attribute Selection Method For Mining Trucks
By D. Komljenovic, V. Kecojevic
Selection of the best possible truck type (model) is of crucial importance for the mine decision-makers. In this paper, authors contribute to the body of knowledge by developing a novel methodology f
Jan 1, 2007
-
Ventilation on demand (VOD) auxiliary fan project ? Vale Inco Limited, Creighton Mine
By O?Connor. D. F.
The ever increasing energy costs associated with mining at depth has become an important issue that needs to be addressed for future sustainable production. Vale Inco Limited?s Creighton Mine being th
Jan 1, 2009
-
Review Of EPA Mandatory Reporting Of Greenhouse Gases (GHG) Rule Or ?MRR? ? Introduction
By S. M. Carpenter
In response to the FY2008 Consolidated Appropriations Act (H.R. 2764; Public Law 110?161), the United States Environmental Protection Agency (USEPA) issued the final Mandatory Reporting of Greenhouse
Jan 1, 2011
-
Emplacement And Mineralization Of The San Cristobal Ag-Zn-Pb Deposit, Southern Bolivia
By S. E. Phillipson
The Late Miocene San Cristobal Ag-Zn-Pb deposit represents syngenetic and epigenetic mineralization with low- and high-sulfidation characteristics. Geology is characterized by barren dacitic ring fra
Jan 1, 2001
-
CFD Analysis Of Two-Phase Flow In A Self Aerated Flotation Machine
By H. Fayed
Two-phase (water and air) flow in a self aerated WEMCO flotation machine has been investigated using computational fluid dynamics (CFD). A 0.8 m3 model is considered. The flow is modeled by Euler-Eule
Jan 1, 2012
-
Investigation And Modeling Of Longwall Face-To-Face Transfers
By E. Topuz, C. Patrick
Longwall face-to-face transfers can cost more than $100 per minute in lost production potential and $100,000 for personnel and supplies. Such high costs make extensive planning and control of the tran
Jan 1, 1994
-
Northern Dynasty Mines’ Pebble Project: A Strategic Resource For Alaska
By Stephen Hodgson, Ken Brouwer
September 2005, Northern Dynasty Mines announced the discovery of a new, high-grade deposit at its Pebble project in southwest Alaska. The product of insightful geological investigation, Pebble East,
Jan 1, 2007
-
Improving Truck-Shovel Energy Efficiency Through Discrete Event Modeling
By K. Awuah-Offei
Energy efficiency has become significant due to cost and environmental considerations. Comminution and material handling have been identified as the two most energy intensive processes in mining. The
Jan 1, 2012
-
Pre-conditioning/Pre-excavation Grouting of the Soils Prior to Tunneling Below Highways and Railways: Case Histories from the Past Decade
By Alex Naudts
Pre-excavation grouting is a predictable and reliable technique performed to prevent or minimize settlement in advance of, or during the tunneling operation. It safeguards the infrastructure above the
Jan 1, 2008
-
Tunnelling Under Glaciers - Construction Update: Galore Creek Mine Access Tunnel, British Columbia, Canada
By Dean Brox
The Galore Creek Mine project is one of the newest major mining projects under development in Canada. The project is located in a very remote area of northwestern British Columbia and is being develop
Jan 1, 2008
-
Mill Feed: By 8 m Ore Block Assay, Or By 8 cm Rock Sensing? Sorting Technology Can Fill The Gap Between Mine And Mill.
By G. Van Weert
Mining project feasibility is projected from a geological model and a mining plan. Ore grade is assumed to be continuous, based on drill hole assays as much as 80 m apart. Eighty meter is 80,000,000 m
Jan 1, 2008
-
A Patent Licensing Regime for the Development and Protection of the Area’s Resources
By Yao Zhou
Under the United Nations Convention on the Law of the Sea (UNCLOS), the international seabed area (Area) and its resources are the common heritage of humanity (CHH). Patent rights can be incompatible
Sep 1, 2014
-
Estimation of Grinding Time for Desired Particle Size Distribution and for Hematite Liberation Based on Ore Retention Time in the Mill Mining, Metallurgy and Exploration
By Rameshwar Sah, Bharath Kumar Shanmugam, Govinda Raj Mandela, Marutiram Kaza, Harsha Vardhan, Harish Hanumanthappa
Iron ores obtained from different sources differ in their chemical and physical properties. These variations make the process of grinding a difficult task. The work carried out in this context focuses
-
Estimation of Grinding Time for Desired Particle Size Distribution and for Hematite Liberation Based on Ore Retention Time in the Mill Mining, Metallurgy and Exploration (ff4e1177-21df-44a1-9ca7-c600c2bd555d)
By Rameshwar Sah, Bharath Kumar Shanmugam, Govinda Raj Mandela, Marutiram Kaza, Harsha Vardhan, Harish Hanumanthappa
Iron ores obtained from different sources differ in their chemical and physical properties. These variations make the process of grinding a difficult task. The work carried out in this context focuses
-
Proactive Interburden Fracturing Using Underground Inseam Drilling with Validation Monitoring
A series of gas inrush events occurred during development at Grosvenor mine resulting in exposure to elevated levels of methane at the production face. A total of 22 gas inrush events occurred releasi
Jan 7, 2020
-
Geologic Data Collection and Assessment Techniques in Coal Mining for Ground Control
By Mark Van Dyke, Ted Klemetti, Joe Wickline
"The identification and mitigation of adverse geologic conditions are critical to the safety and productivity of underground coal mining operations. To anticipate and mitigate adverse geologic conditi
Jan 1, 2019