Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Distributions of Flow Characteristics and Physicochemical Properties of Acid Mine Drainage in a Settling PondBy Dong-kil Lee
Field tests have been conducted to investigate the characteristics of flow and physical chemistry of acid mine drainage(AMD) in the Hwangji-Yuchang settling pond in south Korea. pH and ferrous concent
May 1, 2011
-
Calcium Aluminate Kiders in Hard Rock and Coal MiningBy Bernard Woolley
The history of the use of calcium aluminates in mining is discussed including a review of very rapid hardening concretes, anchoring using cement capsules and pumped ground control systems. Specific re
Jan 1, 1997
-
Why Do We Invest in New Technology in the Mining Industry?Thank you for the invitation to address The AusIMM Young LeadersÆ Conference here today. When I first saw the conference theme û æadvancing technologies and their future applications in the mining ind
Jan 1, 2003
-
Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMSBy Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13
Jan 1, 2007
-
The Synergy Between Theory And Practice In Geo-EngineeringBy Bas R. Hemmen
GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper
Jan 1, 2006
-
Railroad Crossing by Microtunneling: MTBM Successfully Mines Side-by-Side Twin Tunnels Six Feet Below Railroad - West Elizabeth Avenue Storm Drainage Project, Linden, New JerseyBy Keith Schaeffer
This paper presents a history of the planning, engineering and construction completed for the railroad tunnel crossing part of the West Elizabeth Avenue Storm Drainage Project, undertaken to relieve f
Jan 1, 2008
-
The Price Is Right?Planning Large Water Tunnel Contracts In New YorkBy Christian Maguire
Tunnel contracts in New York have in recent years had few bidders with the bids received being much higher than anticipated. Since 9/11, security has become a key issue in planning key infrastructure
-
Pile Load Test On 1200 Mm Dia Pile In Cemented Soil - Synopsis:By B. Ramanathan
The results of a pile load test on a 1200 mm dia and 25 m long bored Cast-in-situ pile in soft rock is reported. The subsoil has a high N value of above 60 from 7 m to 21 m. The soft rock was observed
Jan 1, 1996
-
Front abutment effects on supplemental support in predriven longwall equipment recovery roomsBy Jeffrey M. Listak
This report describes a study, conducted jointly by BethEnergy Mines Inc. and the Bureau of Mines, to assess the effects of longwall front abutment loading on various supplemental support materials u
Jan 1, 1989
-
Geology and the Search for Mineral DepositsFor the purposes of this discussion it is assumed that contributors should express the thoughts that arise from their personal experience. So wide is the range of mineral deposits, and so varied the m
Jan 1, 1950
-
Hydraulic Stope Filling on the Golden MineG. R. Compton (Gold Mines of Kalgoorlie (Australia) Ltd., Fimiston, W. A.) : In congratulating Mr. Hooker upon his resume of Mr Parry's paper I have in mind the fact that he carried out the resea
Jan 1, 1965
-
Coal-Pyrite Flotation: A Modified Technique Using Concentrated Second-Stage PulpBy Kenneth J. Miller
The Bureau of Mines two-stage coal-pyrite flotation process was modified to provide a more concentrated final clean coal slurry underflow which could be dewatered economically by filtration or centrif
Jan 1, 1975
-
OFR-3(2)-85 Caving Mine Rock Mass Classification And Support Estimation - Volume II - ManualBy Robert A. Cummings
A rock mass classification system has been developed for support estimation in mines using caving methods. The developed system (MBR System) accepts readily-obtainable geotechnical properties, and min
Jan 1, 1984
-
6000 Ton Osterberg Load Test Reduces Foundation Costs For Delaware River TramwayBy Aly M. Mohammad
The Delaware River Tramway will link civic and retail developments in Philadelphia, Pennsylvania and Camden, New Jersey. Twin 300-foot towers will anchor the cables at either side of the river. Four h
Jan 1, 2002
-
Geotechnical Investigation For Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, CaliforniaBy Lawrence P. Goldfarb
This paper presents the results of the geotechnical investigation for the repair of the Fashion Island Boulevard Bridge, Bridge No. 350160, in San Mateo, California. The concrete, precast girder bridg
Jan 1, 1993
-
Copper prices : History not necessarily precursor to futureBy Simon D. Strauss
This article is part of a presentation Strauss made Dec. 3, 1988 at the sixth annual American Mining Hall of Fame (AMHofF) banquet in Tucson, AZ. At the banquet, the Mining Club of the Southwest honor
Jan 1, 1989
-
Recent research directions at CANMET’s Cape Breton Coal Research LaboratoryBy David J. Forrester
"CANMET’s research into underground coal mining is primarily conducted at the Cape Breton Coal Research Laboratory (CBCRL), established in 1981 to conduct safety research in underground coal mines. Lo
Jan 1, 1996
-
The Utilization Of Coarse Pre-Concentration Rejects In The Preparation Of Underground Backfills At Xstrata Nickel?s Ontario OperationsBy T. Weatherwax
As part of a strategic research initiative at UBC to design and evaluate integrated underground mining and mineral processing systems, work has been done to determine how to utilize the coarse rejects
Jan 1, 2008
-
Earth Retention Using Augered Cast-In-Place Piles - A. Introduction - 1. ApplicationsBy William S. Heckman
a. When to use: high surcharges, vertical capacity required, limit noise and eliminate vibrations, low headroom, eliminate vibration induced settlements. b. Advantages: eliminates impact noise and
Jan 1, 1997
-
Performance of the Tankcell® E500 at the Kevitsa MineBy Ben Murphy, Tomi Maksimainen, Antti Rinne, Ishmael Muzinda, Toni Mattsson
"A 500m3 flotation cell was commissioned during 2014 at the Kevitsa Mine in northern Finland working as the first rougher in the copper flotation circuit. Treating around 850tph with an average grade
Jan 1, 2016