Search Documents

  • SME
    An Innovative Approach to Tunneling in the Swelling Queenston Formation of Southern Ontario

    By Michael Hughes, Paul Bonapace, Harry Charalambu, Stephen Rigbey

    Ontario Power Generation is building a 10.4-km water diversion tunnel in Niagara Falls, Canada. The tunnel is a two-pass, cast-in-place prestressed concrete-lined pres-sure tunnel with a nominal inter

    Jan 1, 2007

  • NIOSH
    RI 3434 Typical Oil-Field Brine-Conditioning Systems: Preparing Brine For Subsurface Injection ? Introduction

    By Sam S. Taylor

    The disposal of oil-field brines by injection into subsurface formations other than fresh-water-bearing strata is a positive method of eliminating the harmful effects of mineralized water on fresh-wat

    Jan 1, 1939

  • NIOSH
    RI 7171 Effect Of End Conditions On Determining Compressive Strength Of Rock Samples

    By John R. Hoskins

    The Bureau of Mines conducted an investigation to more exactly define the influence of some end conditions on the laboratory-determined uniaxial compressive strength of rock samples. Limestone, marble

    Jan 1, 1968

  • SME
    Construction of the West Area CSO Tunnels and Pumping Station

    By Ray Hutton, Darrell Liebno, Taro Nonaka

    Background Population growth and increasingly stringent regulatory controls on water quality across North America have resulted in municipal governments investing heavily in infrastructure to cont

    Jan 1, 2007

  • SME
    Maximizing Value By Protecting Your Intellectual Property Assets ? Introduction

    By S. E. Chetlin

    In the mid-1970?s, the market value of tangible assets of S&P 500 companies far outstripped the value of intangible assets, including intellectual property (e.g., 83% tangible assets v. 17% intangible

    Jan 1, 2012

  • DFI
    Structural Underpinning By Pinpiles

    By D. A. Bruce

    Small diameter cast-in-place bored piles (pinpiles) have been installed throughout the world since 1952, but only more recently in the United States. The special features of their construction and per

    Jan 1, 1992

  • SME
    Extensive Mechanization Produces Record Performance In Drill-Blast Tunnelling

    By Hans Hamrin

    Three drill-blast cycles of 3.1 m advance achieved in one working shift of 7.5 hours at the Holsfjorden Tunnel project in Norway. The tunnel, 5235 m long, with a cross section of 8.6 m2, was completed

    Jan 1, 1987

  • SAIMM
    The Use Of Electron Microbeam Techniques In Metallurgical Analysis

    By L. Andrews

    Electron microbeam analysis of metallurgical samples covers abroad field and has applications in the areas of minerals processing, hydrometallurgy, pyrometallurgy, physical metallurgy and corrosion.

    Jan 1, 2007

  • SME
    Specifications For Initial Support In Rock Tunnels

    By William F. Daly, William H. Hansmire

    Installation of initial tunnel support is often the most uncertain element of work in the design of, and a contractor bidding on, construction of a rock tunnel. The risks the construction contractor a

    Jan 1, 1985

  • ISEE
    Effect of Meteorology on Airblast Overpressure

    By Adrian J. Moore, Alan B. Richards

    Airblast overpressure levels can commonly be increased by up to 20 decibels (dBL) by the effects of meteorology, due to inversions and wind shear. Existing atmospheric refraction models can provide a

    Jan 1, 2005

  • SME
    Lysimeters allow quicker monitoring of heap leaching and tailing sites

    By William R. Bond, Jim V. Rouse

    Introduction The pressure/vacuum (p/v) lysimeter or soil water sampler has become useful for monitoring vadose zone or unsaturated zone water conditions. The soil water sampler was first introduced a

    Jan 4, 1985

  • ISEE
    Predicting the Envelope of Damage Resulting from the Detonation of a Confined Charge (aa576ad1-736a-4e7e-9977-8fe1a93c21b3)

    By Jason M. Ryan, T Michael LeBlanc, John H. Heiiig

    Drill trajectory deviation is a recurring problem in the Mining Industry retreat stoping operations. As a result of this deviation, it is quite concevable that 60 kg (165 mm 0) and 103 kg (203 mm 0) e

    Jan 1, 1995

  • AUSIMM
    MinerÆs Rights: Legal and Illegal Mining by Automatic Citizens under the present Mining Act

    Every automatic citizen is an automatic recipient of a miner's right under the present Mining Act (Chapter 195), but this alone does not entitle any automatic citizen to mine for minerals on

    Jan 1, 1991

  • SAIMM
    Explosives utilization at aWitwatersrand gold mine

    By M. Gaula

    "Gold bearing deposits of the Witwatersrand basin are generally less than 2m thick and require conventional narrow-reef mining methods for extraction and employ explosives as a means of rock breaking.

    Jan 1, 2015

  • AUSIMM
    Exploration for Platinum Group Element Deposits in Mafic and Ultramafic Rocks

    Platiniferous horizons such as the Merensky Reef that are mined chiefly for their PGE contents constitute one end member of a continuum of Ni-Cu-PGE sulfide deposits; Ni-(Cu) sulfide deposits in which

    Jan 1, 2002

  • CIM
    Mill Liner Bolt Removal System

    By Michel Fontaine, Bruno St-Cyr

    "The mission of the CENTRE DE RECHERCHE INDUSTRIELLE DU QUEBEC (CRIQ) is to stimulate economic development by guiding businesses in their pursuit of innovation.With a comprehensive approach to their n

    Jan 1, 2000

  • CIM
    The Aurora Super Pump – Part II: Field Performance of a New Hydrotransport Pump

    By D. Wolfe, R. Cleminson

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The hydrotransport systems at Aurora experience high rates of wear,

    Jan 1, 2014

  • IIMP
    El rol de los circulos de mejoramiento continuo en las operaciones mineras

    By Wilson Bardales

    El presente trabajo describe la experiencia de la Gestión de la Calidad en la Cía. Minera Poderosa S.A., específicamente en el rol que desempeñan los Círculos de Mejoramiento Continuo (CMC´s) como un

    Sep 12, 2005

  • CIM
    Cyanidation in Grinding Circuit: Evaluation of Leaching Parameters in Grinding and Cyanidation Addition Strategy

    By J. Châteauneuf, R. Dupéré, D. Mrabet

    "In gold processing plants, it is common to start gold cyanidation in the grinding circuit by simple cyanide addition or as a result of recycling residual cyanide. In such cases, advantages such as a

    Jan 1, 2016

  • SAIMM
    A Feasibility Study Of Recycling Of Manganese Furnace Dust

    By R. Shen

    This paper presents results of a feasibility study of recycling manganese furnace dust generated in production of ferromanganese and silicomanganese at Tasmanian Electrometallurgical Company, Australi

    Jan 1, 2007