Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Metropolitan Boston Transit Authority Red Line Project Harvard Square To Porter Square Tunnels Cambridge, Massachusetts
By Daniel F. Meyer
INTRODUCTION The Metropolitan Boston Transit Authority (MIA) Red Line has served greater Boston commuter needs from its Harvard Square terminus since its opening in 1912. Since then, the population
Jan 1, 1983
-
Upgrading Gasifier Slag – Preprint 97-69
By M. S. Klima, V. Choudhry
Coal gasification solid residue (slag) contains unconverted carbon (char) which is considered an impurity for utilization applications of slag. Under this study, table concentration was used to proces
Feb 24, 1997
-
Diversity of Spontaneous Vegetation on Post-Industrial Sites - Importance in Reclamation Process
By G. Wozniak, R. Rostanski, H. Pfanz, G. Aschan, E. Sierka
"Industrial wasteland is a typical element of the landscape of all the industrialised regions in Europe. There are many examples from Poland as well as from other European countries that post-industri
Jan 1, 2005
-
Are Long TBM Tunnels Faster by TBM?
By Nick Barton
A recent analysis of 145 TBM tunnels of more than 1000km total length has helped to quantify the time dependence of utilization (U). In fact U = Tm, where T is time in hours and m is a negative gradie
Jan 1, 2001
-
Application Of Dynamic Systems Modeling To Integrate Hydrologic Processes In Mine Settings
By R. C. Ford, W. L. Niccoli, J. B. Finley
All mining operations are superimposed on natural hydrologic systems. As a result, mining operations are influenced by natural hydrologic processes and require water management systems to successfull
Jan 1, 2002
-
A Method To Calculate Hydrodynamic Loads On Underground Bulkheads
By G. Watson, S. Sawyer
A Method to Calculate Hydrodynamic Loads on Underground Bulkheads Bulkheads are structures built in openings in underground mines to impound water, preventing the water from entering the active mine
Jan 1, 2007
-
Analyzing the Implications of a Change in Mining Regulations on a Small City Economy
There is wide agreement that sustainability has multiple dimensions, but substantially less agreement on the appropriate balance among those dimensions. This occurs because peoples’ vision of a sustai
Jan 1, 2005
-
Environmental Regulations in the Powder River Basin
By Marion Loomis
Environmental regulation is an ever growing cost to the mining industry. Requirements for such items as air quality modeling, hazardous waste disposal, selenium concentration in water and sagebrush pl
Jan 1, 1994
-
How acid rain legislation might change coal use patterns
By Earl L. Rau
At the present time, whether an electric utility uses high-sulfur coal is largely determined by geographical location, clean air legislation, and the age of the power plant. Acid rain legislation may
Jan 1, 1987
-
Porphyry Copper-Gold Deposits of the Southwest Pacific
By R. L. Andrew
The southwest Pacific has produced at least four of the world’s premier porphyry copper-gold deposits, and the current level of exploration is likely to produce even more. An appreciable amount of gol
Jan 1, 1995
-
The Atlanta West Area CSO Storage Tunnel and Pumping Station Project—15 Months of Design Accomplished Within 10 Months
By Refik Elibay, Lawrence A. Williamson, George D. Barnes
Under an extremely aggressive schedule, final design of 13.5 km (8.4 miles) miles of 8.2 m (27 ft) diameter deep rock tunnel, 322 ML/day (85 million gallons / day)submersible pumping station and assoc
Jan 1, 2005
-
Tamerlane Hoist And Vertical Belt Project
By Shawn Collins
BACKGROUND The history of the Pine Point Mine is a rich one. This property once boasted one of the largest and most profitable lead-zinc mines in Canada's long and storied mining history. The Pi
-
Cerrejon North Block project is making Colombia a major coal exporter
By Gregory D. Savage, Bruce M. Everett
Introduction The growing role of Colombia as a major supplier of internationally traded steam coal has been widely discussed in the industry. Although Colombian coal has been produced and exported in
Jan 6, 1986
-
Assessment of equipment operator?s noise exposure in western underground gold and silver mines
By Ellsworth R. Spencer
An assessment of U.S. western hardrock miners? noise exposures was conducted as part of a multi-year National Institute for Occupational Safety and Health (NIOSH) survey of noise exposures in each sec
Jan 3, 2010
-
The Deep Underground Science And Engineering Laboratory And The Construction Of Physics Megacaverns
By C. Laughton
The Deep Underground Science and Engineering Laboratory (DUSEL) is to be constructed at the defunct Homestake Mine, in South Dakota. As a cornerstone of DUSEL?s research program, it is intended to con
-
Construction Aggregate Properties of the Sombrerito Formation, Dominican Republic
By S. J. Stokowski
Abstract An extensive drilling and laboratory testing program indicates that a construction aggregate resource is present within the Oligocene Sombrerito Formation limestone, southwestern Dominican Re
Jan 1, 1991
-
Dry Jigging Coal: Case History Performance - Preprint 09-052
By R. Snoby
Since its introduction in 2002, the modern air jig has processed a wide array of coals throughout the world. This paper explores the reasons and justifications for the installations and provides case
Jan 1, 2009
-
Promoting Cooperation Between Small- and Large-Scale Miners in Ghana
By C. Anim-Sackey, R. K. Amankwah
Some large-scale mining companies in Ghana have adopted proactive management strategies in dealing with small-scale (galamsey) miners who have encroached on their concessions. This has been mainly ac
Jan 1, 2004
-
Tunneling Data: Turning Information into Intelligence on the NEIS Project
By John McDonald, Peter C. Raleigh, Christopher Dishlip
This paper will discuss how the construction management team and the contractor working together on the City of Los Angeles, North East Interceptor Sewer project, managed information on a daily basis.
Jan 1, 2005
-
Secondary Grouting at the Chattahoochee Tunnel
By Judy B. Jones, Bradley A. Crenshaw, Theodore DePooter
This paper reviews groundwater issues leading to a secondary grouting program at the Chattahoochee Tunnel that was implemented subsequent to the contact grouting program. The secondary grouting progra
Jan 1, 2005