Are Long TBM Tunnels Faster by TBM?

Society for Mining, Metallurgy & Exploration
Nick Barton
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
1230 KB
Publication Date:
Jan 1, 2001

Abstract

A recent analysis of 145 TBM tunnels of more than 1000km total length has helped to quantify the time dependence of utilization (U). In fact U = Tm, where T is time in hours and m is a negative gradient of deceleration. In poor quality ground, gradient m has a strong dependence on rock mass quality Q, for example m ˜ -0.5when Q = 0.1. Good investigation is critical for ensuring faster TBM tunneling then drill-and-blasting, which tends not to slow down (in m/hr) as the tunnel length increases. Anew design model called QTBM allows more reliable prognoses be made, and occasionally will disqualify the TBM solution.
Citation

APA: Nick Barton  (2001)  Are Long TBM Tunnels Faster by TBM?

MLA: Nick Barton Are Long TBM Tunnels Faster by TBM?. Society for Mining, Metallurgy & Exploration, 2001.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account