Are Long TBM Tunnels Faster by TBM?

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 1230 KB
- Publication Date:
- Jan 1, 2001
Abstract
A recent analysis of 145 TBM tunnels of more than 1000km total length has helped to quantify the time dependence of utilization (U). In fact U = Tm, where T is time in hours and m is a negative gradient of deceleration. In poor quality ground, gradient m has a strong dependence on rock mass quality Q, for example m ˜ -0.5when Q = 0.1. Good investigation is critical for ensuring faster TBM tunneling then drill-and-blasting, which tends not to slow down (in m/hr) as the tunnel length increases. Anew design model called QTBM allows more reliable prognoses be made, and occasionally will disqualify the TBM solution.
Citation
APA:
(2001) Are Long TBM Tunnels Faster by TBM?MLA: Are Long TBM Tunnels Faster by TBM?. Society for Mining, Metallurgy & Exploration, 2001.