Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich Bridge
By Andrew Peterson
The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi
Jan 1, 1999
-
Challenges Associated with the Construction of a Cofferdam – A Case Study
By Eric S. White, Thomas J. Sabourin, Khuram R. Mohib
"This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init
Jan 1, 2017
-
Foundation Base Material Strength Assessment for Drilled Pipe Piles using Force and Displacement Data
By Patrick J. Hannigan, Geir Veslegard, Frank Rausche, Rozbeh B. Moghaddam
A common type of deep foundation used in Norway to support bridge structures is the drilled pipe piles (piles) filled with concrete reinforcement after installation. The standard installation practice
Jan 1, 2018
-
Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial Soil
By Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi
"Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei
Jan 1, 2014
-
Improvement Of The Cost-Effectiveness Of H-Bearing Piles By Using High-Strength Histar Steels. - Summary
By Lucien P. Weber
Over the last few years, increased customer demands as well as strong competition from substitute materials have accelerated the development of advanced technologies to improve both the performance an
Jan 1, 1997
-
Ensuring Performance of Tip Post-Grouted Bored Piles (Drilled Shafts) Through a Comprehensive Quality Assurance Program
By Mary Ellen Bruce Large, Antonio Marinucci, Silas C. Nichols
Tip post-grouting of bored pile (drilled shaft) foundations refers to a method where cementitious grout is injected beneath the tip of a shaft to improve the overall performance of the constructed fou
Jan 1, 2018
-
In Situ Soil Mixing Concepts Explained; Myths Dispelled - What Is Soil Mixing?
By Richard W. Hanford
The geotechnical construction industry generally considers soil mixing to be defined as an in situ ground improvement or treatment method by which a dry or wet reagent is introduced into the ground an
Jan 1, 2001
-
Statnamic Loading Tests On Different Pile Types - 1.0 Introduction
By Patrick Bermingham
This report presents the results of six STATNAMIC loading tests that were carried out on four different pile types at the CALTRANS 280 Test Site (Bridge No. 34-46) in conjunction with the Tension Pile
Jan 1, 1993
-
Ground Freezing For Shoring Of Excavations - A Case History: 1405/SR522 Vault NW-6
By Daniel Mageau
Ground freezing has been used for over 100 years to provide shoring and ground water cutoffs for hundreds of projects worldwide, including drilled shafts, tunnels and cofferdams. Typically, these case
Jan 1, 1998
-
Determination Of Pile Lengths Under Existing Structures
By Mohamad Hussein
Low strain dynamic tests are performed to evaluate the structural integrity of driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed b
Jan 1, 1992
-
Construction Of Effluent Outfall Diffusers For The Boston Harbor Project
By Geoffrey D. Collins
This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay
Jan 1, 1994
-
Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)
By David B. Paul
"ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class
Jan 1, 2014
-
Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)
? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 1997
-
Minipiles And Postgrouted Bored Piles - Two Techniques For Special Site Conditions - Summary:
By Stefan K. Schwank
The paper describes the two foundation techniques - mini piles and postgrouted bored piles. The mini pile system is presented with its design and installation parameters, especially the drilling techn
Jan 1, 1991
-
Modern Procedures For The Design Of Driven Pile Foundations
By G. G. Goble
Significant progress has been made in the past decade in determining the load bearing capacity of pile foundations. Developments in the means of prediction of pile capacity as limited by soil strength
Jan 1, 1988
-
The Use of Seismic Trace Characterization to Guide the Analysis of DST Results to Obtain More Accurate Soil Parameters
By Gerald Verbeek, Erick Baziw
Downhole Seismic Testing (DST) is a very popular applied seismology site characterizing tool within geotechnical engineering. A challenging aspect of DST is to characterize the acquired seismic data s
Jan 1, 2018
-
Excavation Support At The Capitol Visitor Center In Washington DC
By Harald Ludwig
In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site
Jan 1, 2006
-
Permanent Displacement And Pile Driving Vibrations - Summary
By Charles H. Dowding
Whenever piling vibrations are significant, construction activities associated with pile driving and/or excavation can produce permanent displacement. These permanent displacements are more detrimenta
Jan 1, 1991
-
Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a Seawall
By Paul J. Sabatini, Yazen A. Khasawneh
"A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse
Jan 1, 2017
-
Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And Meeting
By Peter J. Nicholson
A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th
Jan 1, 1998