Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Bath Level Measurement for a Closed Dc Furnace

    By A. Scheltema Beduin, H. Oterdoom, A. Haaks, C. Kempe, A. Liedtke

    The bath level measurement is applied in many furnaces to keep control of the level of slag and metal or matte inside. The BLM is used mainly in bath processes, and has not seen much evolution in its

    Jan 1, 2015

  • CIM
    The Role of Oxygen in Xanthate Flotation of Galena, Pyrite and Chalcopyrite

    A study was made to determine the effect of increasing concentrations of dissolved oxygen on the floatability of galena pyrite and chalcopyrite. Adsorption, flotation and contact-angle tests were done

    Jan 1, 1970

  • CIM
    Wettability Measurements in the Selection of Extender Oils For Potash Ore Flotation

    By A. Atrafi, L. Barroilhet

    The top size of particles in the flotation of potash ores, which can be as large as 4 mm, exceeds by far the top size in other flotation plants. It is then understandable that while long chain amines

    Jan 1, 2016

  • CIM
    The Interface of TiB2 and Al3Ti in Molten Aluminum

    By Haibin Ma, Jie Song, Qingyou Han, Xiaoming Wang, Wei Vian

    In the grain refinement of aluminum, Al3Ti and TiB2 particles are introduced to reduce the casting grain size down to 200 micrometer level, which makes cold working possible. The particles are brought

    Jan 1, 2015

  • CIM
    Increased SAG Grinding Capacity at Goldex Secondary Crushing of SAG Mill Feed

    By A. Allaire

    The Goldex operation of Agnico-Eagle Mines (AEM) commenced operations in the spring of 2008. Following some months of initial operation, the grinding circuit capacity was under-performing according to

    Jan 1, 2012

  • CIM
    Crystallization of Zinc and Iron Sulphates Causing Major Scaling Problems in the Kidd Metallurgical Site Leach Plant Autoclave

    By L. Becze, B. Pierre, S. Di Carlo, G. P. Demopoulos

    From January to June 2007, the autoclave production at the Kidd Metallurgical Site was severely affected as a result of plugged discharge lines and extensive precipitation/crystallization of sulphates

    Jan 1, 2008

  • CIM
    Total Acid Mist Quantification within a Full-Scale Copper Electrowinning Cell

    By W. Yang, R. Rajasingam, B. Tadesse, K. Mohanarangam

    Copper electrowinning is a complex electrochemical process that involves the production of LME grade copper from copper rich electrolyte. The process involves the deposition of the copper ions onto th

    Jan 1, 2019

  • CIM
    Verification of a CFD Code use for Air Flow Simulations of Fractured and Broken Rock

    A direct comparison has been undertaken between laboratory wind tunnel experimentation and computational fluid dynamics simulation of a 3D manufactured analogue for a body of fractured broken rock, cr

    Aug 1, 2013

  • CIM
    Concepts of Gearless Bali Mill Drives

    By P. Hale

    "The trend to drives of more than 10,000 hp on large-capacity ball and autogenous mills for increased operating efficiency has been limited by factors in the conventional drive system. A solution to t

    Jan 1, 1970

  • CIM
    Mining 1n Canada's Sub-Arctic . . . The Iron Ore Company of Canada

    By P. W. A. Mayer

    "As the push toward the northern regions of Canada steadily increases to exploit the rich mineral reserves, interest is steadily rising in respect to accessibility and climatic conditions and the prob

    Jan 1, 1966

  • CIM
    The Kaiser Coal Project

    By P. J. Urso

    "The coal reserves of the Crow's Nest Basin in British Columbia have been known since the late 1860's. The 51.0-million-long-ton (over 15 years) sale of low-volatile coking coal to Japanese steel mill

    Jan 1, 1969

  • CIM
    Underground and Laboratory Tests of Slusher Cables

    By G Anders

    Underground tests of slusher cables at first might seem to be quite simple and inexpensive. They do, however, take a long time and give results that may be ambiguous and unreliable. Also, because unde

    Jan 1, 1964

  • CIM
    Modern Approaches and CFD Simulation in the Green Ventilation of Process Buildings

    By S. U. Baltuch, E. G. Baltuch

    "Ventilation in process buildings is key to proper mill function. Correctly engineered systems to evacuate surplus thermal energy from process areas allow optimized rates of air change, thus assuring

    Jan 1, 2012

  • CIM
    Eagle Mine and Mill Commissioning

    By Jennifer Abols

    In July of 2013, Lundin Mining acquired the 2,000 tpd Eagle nickel and copper project from Rio Tinto. The project had been put on hold earlier in the year and construction was approximately 50% comple

    Jan 1, 2015

  • CIM
    Design-By-Analysis of Water-Cooled Gas Handling Ducts

    By T. Plikas, T. Porretta, M. Al-Dojayli, B. Pretorius, J. Woloshyn, H. Ghorbani

    "Water-cooled ducts represent an integral part of high temperature off-gas systems in metallurgical processes. Typically, off-gas enters these ducts at significantly elevated temperatures; therefore,

    Jan 1, 2017

  • CIM
    Coal-Dust Explosions. Suggestions for their Prevention, and the Recovery of Mines After Explosions

    By W. T. Gotheridge

    The principal sources of coal-dust underground are, of course, coal, and the working of coal. Coal-dust is most dangerous when it is in the finest state of division. This class of dust is found mostly

    Jan 1, 1924

  • CIM
    Arsenic Immobilization and Metal Recovery from El Teniente Smelter Dust

    By R. Ichimura

    This paper summarizes the results of a five-year project, which aimed at improving the current method to process the arsenic-bearing smelter dust of El Teniente. This project, which was started in 200

    Jan 1, 2007

  • CIM
    The Effect of LPF on the Leaching Process of a Weathered Crust Elution-Deposited Rare Earth Ore

    By Yan Qun, Chen Xiao-ming, Ma Pei-long, Luo Xian-ping, Luo Cai-gui, Feng Bo

    The effect of leach promoting reagent LPF on the leaching process of a weathered crust elution-deposited rare earth ore has been investigated and the mechanism is discussed. The result shows that the

    Jan 1, 2014

  • CIM
    Bath Ratio Control Improvements at Alcoa Poços De Caldas - Brazil -An Update

    By L. Paulino, R. A. Camilli, J. Yamamoto, J. C. Araujo

    The first paper presented on this work [1], showed how bath ratio was increased from 78% to over 95% using a structured approach to reduce bath chemistry variability. This update will illustrate the s

    Jan 1, 2006

  • CIM
    Development of a Two-Stage Middlings Circuit at Inco's Clarabelle Mill PART 2: On-Site Pilot plant Testwork and Full Plant Implementation

    By A. Bouchard

    "Based on laboratory testwork, a two-stage cleaner / re-cleaner circuit with feed regrind was proposed to replace an existing single-stage middling circuit treating a scavenger concentrate at Inco’s C

    Jan 1, 2001