    Austin's New Delay Primper Relay

    By Roger N. Prescott

    This report presents a new process in delay blasting with the use of ANFO and slurry explosives.

    Jan 1, 1977

  • ISEE
    A New Detonating Cord for Reducing Unwanted Damage in Controlled Blasting

    By Thomas Bakley, Rob Lee, Jay Rodgers

    The present state of technology in Controlled Blasting uses standard explosives’ products to create a crack between holes along a desired line of break. The resulting pre-split, post-shear or cut line

    Jan 1, 2001

  • ISEE
    Fragmentation Measurement Results for Fourteen Full-Scale Production Blasts: A Comparison With a Three Dimensional Wave Code

    By Charles H. Dowding, Catherine T. Aimone

    Rock particle sizes were measured at fourteen steep-slope Appalachian coal mines during production blasting. The distribution of rock sizes shows the effects of inter-hole timing, sequence of hole ini

    Jan 1, 1983

  • ISEE
    The Relationship between Strain Energy Density and Micro-cracking in the Rock Strata

    By Vilem Petr

    Optimization blast design parameters for rounds used at surface mines, quarries or cast blast has taken on a new importance with the increased the cost of the explosives and electronic detonators. Thi

    Jan 1, 2008

  • ISEE
    An Innovative Approach to Blasting a Marine Plug in Winter

    By Andre Pinsonnault, Francois Lefebvre, Yves Newman

    In 1989, Les Entreprises Kiewit Ltee signed a C$32 million contract with the Societe d'energie de la Baie James, on behalf of HydroQuebec, to excavate the intake and tailrace channels for a second pow

    Jan 1, 1991

  • ISEE
    Reducing Coal Loss During Cast Blasting At Rix’s Creek Mine

    Bloomfield Collieries Rix’s Creek Mine is an open cut coal operation located in the Hunter Valley region of Australia. The mine produces approximately 1.1 mt of saleable product per year and routinely

    Jan 1, 2006

  • ISEE
    Vibration prediction from controlled blast tests

    By Nadir Plasencia, Rogerio: Neves Mota

    The evaluation of vibrations induced to build structures is one of the main concerns when dealing with blast works. EDP, the main Portuguese producer of electricity is presently incrementing energy pr

    Jan 1, 2008

  • ISEE
    Concrete Demolition

    By Duane A. Houkom

    Explosive demolition of concrete has been accepted as a safe and economical means of concrete removal for many years. I imagine that the early concrete blasters were experienced rock blasters who appl

    Jan 1, 1982

  • ISEE
    The Development of Redundant Nonelectric Delay Systems for Surface Coal Mining

    By Gary L. Self, Ronnie Daniel

    With the advent of large scale blasts utilizing overburden casting techniques, it was imperative that an ultra reliable surface delay system be developed. Shock tube and detonating cord surface delay

    Jan 1, 1989

  • ISEE
    Simple Technique for Selecting Explosives based on Explosive/Rock Acoustic Impedance

    By Alejandro Ferrada Vergara, María Jesús Barros Godoy

    The need for a basic method for selecting explosives based on rock mass or intact rock properties for mining and construction arises from the limited consideration given to these factors when choosing

    Jan 21, 2025

  • ISEE
    The Chemical Kiloton Experiment the Utilization of 50/50 Heavy ANFO at the Nevada Test Site

    By Don Larson, Gordon Coleman

    The United States Department of Energy, through its contractor Lawrence Livermore National Laboratory, has entered into a contract with Alpha-IRECO, Inc. for the emplacement of approximately 2.9 milli

    Jan 1, 1994

  • ISEE
    Improvement of the technology for performing blasting works in Studena quarry

    By Valeri Mitkov

    Studena Quarry is one of the main suppliers of inert materials for concretes production in Sofia. It is characterized by massif heterogeneity in density and fissuration. Failure to take into consider

    Jan 1, 2010

  • ISEE
    Blasting at Operating International Airport

    By Earl C. Hutchison, John Loviza

    At the Metropolitan Nashville International Airport, with its more than 600 scheduled daily flights from American Airlines hub operations, other scheduled airline flights, Tennessee Air National Guard

    Jan 1, 1992

  • ISEE
    A New Tool for Managing Risk Associated with Commercial Explosives Operations

    By Lon Santis, David Leidel, John Tatom, Meredith Hardwick

    This paper describes the development and methodology of the Institute of Makers of Explosives’ Safety Analysis for Risk (IMESAFR), a risk analysis software program for commercial explosives operations

    Jan 1, 2007

  • ISEE
    CO Migration from Trench Blasting in Amherst, New York

    By Marcia Harris, Richard Mainiero

    The New York State Department of Transportation recently commenced highway widening and drainage improvement projects in Clarence and Amherst, NY. Drainage improvements including the installation of s

    Jan 1, 2004

  • ISEE
    Vibration Control During the Construction of an In-Pit Lime Kiln (8311e31c-6f16-4a2a-8cda-6570ebbd2b33)

    By Paul Worsey, Ron Ecklecamp, Scott G. Giltner, Ronnie Inman, Terry Drechsler

    A blast monitoring program conducted at Chemical Lime Companys new lime calcining facility near Ste. Genevieve, Missouri is discussed. The purpose was to develop blasting criteria for the construction

    Jan 1, 1996

  • ISEE
    Creating Awareness About Carbon Monoxide - Blasters Should Know About the Silent Hazard

    By Unknown

    [Executive Director’s note: According to 17th edition of the ISEE Blasters Handbook in its section on trench blasting, “...consideration must be given to the proper venting of gases generated from the

    Jan 1, 2002

  • ISEE
    Multiple Raise Round Blasting Technique

    By Dave I. McGregor

    The Multiple Raise Round Blasting Technique (MRRBT) is a safe, efficient, cost effective method of blasting thee will use existing mine personnel. The MRRBT, developed from the conventional 'drop rais

    Jan 1, 1994

  • ISEE
    Potential Cost Cutting Methods for Permitting Deactivation Furnaces/Explosive Waste Incinerators

    By Katherine L. Heineken, Timothy J. Tope, Kim David Murphy

    One method for small arms disposal is the use of a deactivation furnace or explosive waste incinerator. There are numerous hurdles a facility typically encounters to get the furnace or incinerator ful

    Jan 1, 1997

  • ISEE
    Method for Determining Amplitude-frequency Components of Blast Induced Ground Vibrations

    By O E. Jr Crenwelge

    Recently promulgated regulations governing blast induced ground vibrations in the mining industry contain a frequency criterion as one option for verifying compliance. This criterion is based upon an