Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction Fatigue

    By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam

    Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions

    Jan 1, 2019

  • DFI
    Advanced Continuous Surface Wave Testing (Acsw): Geologic And Geotechnical Site Characterization For The 21St Century

    By David Wilshaw

    Continuous Surface Wave (CSW) testing has been the “next big thing” in ground characterization for the last 25 years. The technique uses surface geophones to measure the speed at which Rayleigh waves

    Oct 1, 2022

  • DFI
    Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry Practice

    By Martin D. Larisch, Ronald Damen

    The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre

    May 1, 2022

  • DFI
    The Influence Of RC Nonlinearity On P-Y Curves For CIDH Bridge Piers (1bc0f905-8225-4716-af5c-0878cbc0d1a4)

    By Leonardo Massone

    The p-y method is one of the most popular methods in pile design and has been calibrated for various boundary conditions using numerical and experimental studies during recent years. Most studies on r

    Jan 1, 2011

  • DFI
    Keynote Lecture 5: Giovanni Lombardi Grouting of Rock Masses

    By Giovanni Lombardi

    In order to get a clear overview of the grouting works carried out, to avoid misinterpretations of the data and functions shown on the display of the grout monitoring device, it is recommended to keep

    Feb 10, 2003

  • DFI
    DFI and NDT – Parallel Histories and Mutual Benefits

    By Bernard H. Hertlein

    "When the Deep Foundations Institute (DFI) was founded, quality assurance and quality control (QA/QC) of foundation construction was rudimentary. Nondestructive testing (NDT) was a nascent technology,

    Jan 1, 2017

  • DFI
    Digitalization in Reverse Circulation Drill Rigs

    By N. Schmitz

    This paper explains how new digital solutions improve reverse circulation drilling operations. Upgrading field-proven reverse circulation drilling (RCD) rigs with new digital technologies enables sem

    Sep 8, 2021

  • DFI
    Bearing Capacity of Post Grouted Drilled Shafts Using a Load Transfer Approach

    By Miguel E. Ruiz, America L. Fernandez, Miguel A. Pandon

    "Post-grouted drilled shafts (PGS) are a deep foundation system in which grout is injected at high pressure throughout the tip after the drilled shaft has been installed. Pressure grouting of drilled

    Jan 1, 2005

  • DFI
    Design and Construction of Nysted Offshore Wind Farm, Denmark

    By Jørn Thomsen, Christoffer Brodbaek

    "As governments increasingly accord high priority to sustainable energy, policymakers are finding that wind energy has a long track record as a proven alternative to conventional energy supply.Over th

    Jan 1, 2009

  • DFI
    St. Anthony Falls I-35W Bridge - Deep Foundation Monitoring Methods And Equipment For Bridge Construction

    By Bryan C. Field

    The proposed construction schedule for the St. Anthony Falls I-35W Bride challenged the abilities of the design-build teams to utilize the best and most efficient methods to meet Minnesota Department

    Jan 1, 2009

  • DFI
    Pile Foundation, Retaining Structures For Deep Excavation And Anti-Buoyancy Anchors In Shanghai Soft Soils

    By Sun Gengsheng

    Geotechnical properties of soils, usual types of pile foundations, pile capacity, calculation of settlements of pile foundations, usual types of retaining structures for deep excavation, stability ana

    Jan 1, 1991

  • DFI
    Drilled Shaft Foundations For The Float-In Dam On The Monongahela River At Braddock, Pa

    By Robert B. Bittner

    The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative ?In-the-Wet? technology. A key feature of this technology involv

    Jan 1, 2013

  • DFI
    St. Anthony Falls, I-35w Bridge Drilled Shaft Load Test Program

    By Jeffrey A. Gebhard

    As part of the design and construction of the new St. Anthony Falls I-35W Bridge, a full-scale load test was conducted on a 6 1/2-foot diameter drilled shaft in the St. Peter Sandstone. This load tes

    Jan 1, 2009

  • DFI
    Ultimate Lateral Load of a Pile in Cohesive Soil under Static Loading

    By Dileej M. Dewaikar, Poonam A. Patil

    "In this paper, the ultimate lateral resistance of a long, flexible, unrestrained vertical pile in a cohesive soil is computed under static loading condition using py curves. A simple and improved met

    Jan 1, 2005

  • DFI
    A Study on Bearing Capacity of Waveform Micropiles Using Centrifuge Test

    By Chengcan Wang, Jin-Tae Han, Young-Eun Jang

    "The waveform micropile is a newly developed foundation type for increasing the bearing capacity with the created shear keys on the pile’s shaft. Analyzing the increment of resistance at the shear key

    Jan 1, 2016

  • DFI
    Double Rotary Head Piling Systems (Cased CFA)

    By Franz-Werner Gerressen

    In the changing construction environment clients are searching for new technology to complete their projects in shorter times. Manufacturers are therefore developing solutions to speed up established

    Jan 1, 2009

  • DFI
    TBM Recovery Shaft Construction - SR-99 Tunnel

    By Lance Rasband, Richard Hanke, John Starcevich

    "The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure

    Jan 1, 2016

  • DFI
    Session 11 Jet Grouting II

    By George Burke

    Of the three projects, particularly the extensive Nimitz II (downtown) project, a single system, which was part of the operation, was used to control the spoil. Spoil control was continuous with the w

    Feb 10, 2003

  • DFI
    Sonic Drilling and Sensitive Infrastructure

    By George Burnhart

    "Sonic drilling is a relatively new technology even though it has been in development since the late 1940s. It was initially funded by the U.S. petroleum industry and then, in the late 40s, Russian sc

    Jan 1, 2008

  • DFI
    Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance (8f2b4a54-c8f3-43f2-a476-24a3cd46424e)

    By Charles M. Wilk

    "Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o

    Jan 1, 2015