Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Seismic Monitoring of Production BlastsBy Klaus G. Hinzen
Seismic observations offer the only possibility for remote sensing of physical processes like shock-front spreading, material crushing and ground movement. A better understanding of these processes wi
Jan 1, 1989
-
Stope Blast Improvement by a New Blast Design in Leeville Underground MineBy Miquel Lamadrid, Changshow Sun, Chris Johnson
To reduce blasting overbreak and improve stope stability, several new blast designs were proposed for current and future stopes. Based on the analysis of the powder factor, and the extent of damage zo
Jan 1, 2008
-
Geomechanical differentiation of cratering mechanisms with two degrees of freedom and burden dependency investigated through single hole blast tests.By J. D. Aubertin
Rock blasting is a complex engineering process that requires in-depth knowledge of operations and geomechanical conditions. Acknowledged design precepts are based on cratering behavior associated with
Jan 1, 2024
-
Study of the Detonation Process of Novel Hydrogen Peroxide-based Explosives Using High Speed VideoBy Italo Onederra, Miguel Araos
"In order to characterize non-ideal explosives, the explosives industry rely on unconfined velocity ofdetonation tests and where possible underwater pond tests. The information obtained from such test
Jan 1, 2017
-
The Testing of Structures and Structure-combinations to be Applied as Explosive-proof EnclosureBy C. Heiss, A. Hofmann
Due to an explosion in an Austrian steel works during the basic oxygen process, the Chair of Mining Engineering and Mineral Economics at the Montanuniversitaet Leoben was assigned with the set-up of a
Jan 1, 2012
-
Considerations in Pre-Split Blasting for Mines and QuarriesBy J Lyall Workman, Peter N. Calder
"Presplitting is a technique mines and quarries may use to produce high quality final pitwalls. Damage from backbreak can be minimized, thereby insuring the final pit walls standat the designed angle.
Jan 1, 1993
-
Journal: Safety Talk, Managing the Blast Site (The Known Unknowns)By William Reisz
Managing the blast site at almost any operation can be a daunting task. There are so many details that must be observed, understood, and acted upon. It goes without saying that there are no two locati
Jan 1, 2014
-
Vibration Control Using a Smartphone- Accuracy, Validation and PotentialitiesBy Francisco Sena Leite, Vinicius Miranda
Mine blasting is directly associated with ground vibration. If these affect critical structures (buildings pit walls, etc.) they must be mitigated to reduce the environment and social impacts. Vibrati
Jan 1, 2018
-
The Effect of Prill Specifications on Emulsion-ANFO Blends (dfcf65b3-c26f-475a-ba27-2ec8841d710f)By Greg S. Williams, David L. McDorman, Richard W. Givens
This paper examines the effect of prill size consistency, internal particle density, and oil absorbency on Ammonium Nitrate Fuel Oil (ANFO)-emulsion blends. By analyzing these physical properties of p
Jan 1, 1990
-
MS Initiation, a Possible Risk in Blasting Tall StructureBy Bob de Raadt
After a review of the general principles for blasting stacks, the stagnations of two stack demolitions are investigated. The author concludes and demonstrates that MS-delay blasting can be risky under
Jan 1, 1982
-
Peak Particle Velocity versus Gravitational Acceleration as a Stability Criterion for Earth Retaining Walls Subjected to Production Blast VibrationsBy Dale Preece, Joergen Pilz, Zavis Zavodni
An overland conveyor was constructed at a surface coal mine to reduce the truck haul distance and make the operation more efficient. An important element in this system is a truck dump facility to tra
Jan 1, 2010
-
Rebuild of a Flash Smelting Furnace Using ExplosivesBy Scott G. Giltner, Terry Millar, Ben Bringhurst
"Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo
Jan 1, 2016
-
How the USDA Uses Explosives to Remove Beaver Dams in Unique LocationsBy Bruce R. Leland, Steven H. Smith, John D. Paulson
The USDA - Wildlife Services has been removing beaver dams with explosives for over 30 years. This paper will discuss the history of the explosives program, summarize how we've evolved, and highlight
Feb 1, 2020
-
Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures (a3ef629c-b178-4045-bc88-d04c273fd2c0)By Ewan Selers, Gary Cavanough
Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech
Jan 1, 2016
-
An Energy Equality Approach to BlastingBy Daniel Scott
Mines have used explosives for economical fragmentation for many years. It can therefore be expected that the mining industry has thoroughly researched how to achieve the most efficient blast. However
Jan 1, 2012
-
Modeling Blast-Induced Damage in Open Pit Mines with Numerical ModelsBy Cristian Castro, Patricio Gomez, Jason Furtney, Augusto Lucarelli
Understanding the effect of blast-induced damage on wall stability is critical to safe and economical operation of a large open pit mine. In this paper, a numerical modeling methodology is used to inv
-
Modeling Blast-Induced Damage in Open Pit Mines with Numerical ModelsBy Cristian Castro, Patricio Gomez, Jason Furtney, Augusto Lucarelli
Understanding the effect of blast-induced damage on wall stability is critical to safe and economical operation of a large open pit mine. In this paper, a numerical modeling methodology is used to inv
Feb 1, 2020
-
Journal: USDA’s Wildlife Services Explosive Safety Program “Managing Wildlife Damage”By Alton Dunaway, Kevin Sullivan, Charles Gray, Doug Hall, Kevin Grant, Kelly Thiel, John Paulson, Bruce Leland, Cole Boyd
Beaver (Castor canadensis) are responsible for economic losses exceeding $4 billion over the last 4 decades in the southeastern United States alone. A large portion of these damages occurs to public r
Jan 1, 2007
-
Journal: 100 Years / The Engineering And Mining Journal New York August 10, 1907 Ground Breaking In The Joplin District Q786 Holes Are Drilled With Air Drills And Squibbed Before Charging. About 1 Pound Of Dynamite Is Required Per Ton Of Rock BrokenBy Doss Brittain
The term ground breaking is taken to include the process of so loosening the ground as to enable it to be readily loaded into buckets or cars and hoisted from the shaft or drift. In the Joplin distric
Jan 1, 2008
-
Fragmentation Mill Throughput Improvement Through a Dual-Salt Sodium Nitrate Emulsion ProductBy Khushaal Popli, Vanessa Roeland, Brian Hall, Carl Diederichs
Highland Valley Copper (HVC) has embraced an integrated Mine to Mill approach to comminution since the late 1990s. Previous blasting optimization was carried out through adjustments to blast pattern g
Feb 6, 2023