Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Overview Of Enabling Works For Waterfront Structures – Design & Construction

    By Nagarajan. D, Raja Rajan. K, Vijayakumar. T

    Major bridges crossing mighty rivers must be constructed in flowing water. Constructing the sub-structure in water has been a challenging job for contractor. Special construction techniques with marin

    Nov 1, 2022

  • DFI
    Sustainable Products For Geotechnical Works

    By Marcus Daubner, Karsten Beckhaus, Florian Bauer

    The construction industry can and needs to contribute to a more sustainable world. Accordingly, geotechnical works potentially have a significant share. In this context, Bauer understands “sustainable

    May 1, 2022

  • DFI
    Underwater Pile Hammers

    By Douglas L. Scaggs

    Driving piles in under water applications has become more common place over the past twenty years. Where only a water depth reachable with a follower or dewatered cofferdam was the rule in the past,

    Jan 1, 2013

  • DFI
    Oakland Turning Basin Bulkhead Spin Fin® Pile

    By Todd Nottingham

    Channel deepening of major ports is challenging designers to explore innovative solutions to ensure stability of bulkheads, such as for the Oakland Inner Harbor. This particular challenge was met with

    Jan 1, 2008

  • DFI
    Evaluation Of Ultimate Resistance Of Steel-Concrete Composite Drilled Shafts Through Static Loading Tests

    By Moonkyung Chung

    Static pile load tests were performed in order to evaluate bearing capacities and mechanical behaviors of three different pile types: (1) steel-concrete composite drilled shaft with rebar reinforcemen

    Jan 1, 2010

  • DFI
    Back-Calculations Of Centrifuge Tests On Pile Groups Subjected To High-Cyclic Loading

    By Torsten Wichtmann, Jan Macheck, Frederik Broz, Patrick Staubach, Hauke Zachert

    The majority of heavy or strongly loaded structures, for instance high-rise buildings, large span bridges or gas storage tanks are founded on pile groups. However, current design codes and guidelines

    May 1, 2022

  • DFI
    Design, Prediction And Performance Of Tied Back Shotcrete Walls Supporting Masonry Hospital Structures

    By Frank Borda

    Two recent projects were completed in Ontario, Canada for major hospital additions that involved excavation support of heritage masonry structures. Conventional continuous caisson wall schemes were re

    Jan 1, 2004

  • DFI
    Environmentally Friendly Geothermal Piles At Keble College, Oxford, UK

    By Tony P. Suckling

    This paper presents a case study of a piling contract undertaken at Keble College in Oxford in the year 2001. Unusually, and for the first time in the United Kingdom, piles were successfully construct

    Jan 1, 2002

  • DFI
    Settlement Control Of A Road Embankment Using Vertical Drains

    By Wei Tu

    A grade separation was required to allow uninterrupted traffic crossing for a busy rail spur and a county road. The grade separation was achieved by creating a 30-foot (9-meter) high embankment that

    Jan 1, 2009

  • DFI
    Helical Piles With Grouted Shafts - A Case History

    By Shawn Downey

    A helical pile with in-situ grouted shaft was used to underpin the existing slab of a large retail store in the Edmonton, Alberta Canada area. The existing structural slab did not have the capacity to

    Jan 1, 2003

  • DFI
    Multiple Foundation Types For Bridges Over The Same Coal Mine

    By Kenneth M. Berrry

    A unique situation has developed at an abandoned coal mine in St. Clair County, Illinois. Subsidence features have been observed at the ground surface over the mine including settlement of a pair of b

    Jan 1, 2001

  • DFI
    Session 16 "Deep Mixing Method IV"

    By Mary Ellen Bruce

    Let me first address the issue of the wet grab samples. The wet grab samples that were attempted to take on the Central Artery were hindered by the fact that the way the mixing was being done was only

    Feb 10, 2003

  • DFI
    Access And Riser Shafts-Detroit River Outfall #2 ? Introduction

    By Edmund J. Cardoza

    The Detroit Water and Sewerage Department (DWSD) provides water and wastewater services to the Greater Detroit Metropolitan Area. Sewerage is treated at the DWSD Wastewater Treatment Plant (WWTP) loca

    Jan 1, 2001

  • DFI
    Unique Anchor Pile SOE System

    By Andrew Stauble

    This project included the replacement of the Long Island Railroad (LIRR) Atlantic 6 Bridge in New York City, which services rail traffic and spans the Van Wyck Expressway and frontage roads. The bridg

    Aug 1, 2023

  • DFI
    Downdrag Effects on the Pile Groups Supporting Bridge Abutments

    By M. Hesham El Naggar, Tony Sangiuliano, Alper Turan

    "Bridge abutments supported on pile foundations are often constructed over weak and compressible soils. The consolidation settlements induced by the embankment loads are known to result in downdrag an

    Jan 1, 2015

  • DFI
    TBM Recovery Shaft Construction - SR-99 Tunnel

    By Lance Rasband, Richard Hanke, John Starcevich

    "The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure

    Jan 1, 2016

  • DFI
    New Ground Freeze Method for Groundwater Cutoff below Foundation Excavations in Permeable Soils

    By Daniel W. Mageau, Larry W. Applegate, Aaron K. McCain

    "An innovative method of ground freezing was successfully tested to create a “dry” excavation condition for a new building foundation at a site in downtown, Miami, Florida. The subsurface conditions i

    Jan 1, 2015

  • DFI
    Installation Checklist For Driving Mega Piles

    By Douglas L. Scaggs

    Over the past several years, pile foundations have grown to meet the demands of larger and heavier structures. As the foundations have grown, so has the need for larger and more robust piles to carry

    Jan 1, 2013

  • DFI
    Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic Environment

    By Thomas M. Caruso

    Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,

    Jan 1, 2008

  • DFI
    Testing Foundations for Major Minnesota Bridges

    By Dan A. Brown, Rich A. Lamb, Paul J. Axtell

    "Over the last 10 years, the Minnesota Department of Transportation (Mn/DOT) has had a very active program of replacing many major bridges, large structures spanning the Mississippi River. The deep fo

    Jan 1, 2013