Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 1By N Clarke, J Hunt, A Barros, L Keeney
The Gramalote orebody is a large low-grade gold deposit situated in the San Roque municipality, 124 km north-east of Medellin in Antioquia, Colombia. It is jointly owned by AngloGold Ashanti (AGA) and
Nov 10, 2020
-
Coalmine methane emission estimates – an evolving understandingBy S Raval
The estimation of greenhouse gas emissions from coalmines is increasingly becoming a priority for both operators and regulators. At the same time, involved scientific challenges in the methane measure
Sep 1, 2024
-
Sublevel Caving - Today's Dependable Low-Cost 'Ore Factory'Much of the theory upon which the Sublevel Caving (SLC) method is based was developed in Scandinavia many years ago. It was based mainly on æbinÆ theory and æellipsoid of drawÆ configurations derived
Jan 1, 2000
-
A Day in the Life of a Mine Worker in 2025By V Srinivasan, P Knights, C T. Farrelly
By 2025, with the widespread industry adoption of remote operation centres and advanced analytics, mining companies will find themselves making better, more informed decisions across the value chain.
Jan 1, 2008
-
Cities as Mine Sites of the FutureBy M Warnken
Major cities are not only the focal point for AustralianÆs work, leisure and homes, they also are the focal point for the flow of resources into the built environment, motor cars and transportation an
Jan 1, 2006
-
An Integrated Technology Solution for Optimised and Environmentally-controlled BlastsBy C Parihar, R Garg, A Bhandari, S Bhandari
Blasting can impact the efficiency of entire downstream mining operation. Individual technology solutions for blasting have been available in the industry for many years but all of them only cater for
Aug 24, 2015
-
Diversion decision making with an integrated approach to design for operations and mine closureBy M Rafty, A Markham, S Atkinson
Australia contains some of the most productive mining areas and is characterised by ancient landscapes and highly variable hydrology. Historical mining of iron ore, coal and other minerals has targete
Jul 25, 2018
-
An economic approach to optimising mill reline frequency – a case study of SAG mill relines at Rasp mineBy C M. Standen
The SAG mill at Rasp Mine has undergone a number of liner design modifications since commissioning in 2012, making liner wear and failure difficult to predict from historical data. During 2017, severa
Aug 29, 2018
-
Feasibility Study and Economic Evaluation for Deposit No 3 of Gol-e-Gohar Iron Ore DepositBy H Dehghan Jan Abadi, K Shahriar
The iron ore district of Gol-e-Gohar (GEG) is located 60 km south-west of the city of Sirjan, in the Kerman Province of the Islamic Republic of Iran. Six exploration targets have been identified and i
Jan 1, 2007
-
Some Bosh and Hearth Features of Blast Furnaces in India Operating with High Ash CokeBy Singh BN, Chakravarty PK, Chatterjee LM
Indian blast furnaces operate with coke gener- ally containing 24 to 28% ash compared to 10-15% ash in coke in most other parts of the world. The operating problems are further aggravated by the hi
Jan 1, 1981
-
The Development and Integration of a Carbon-In-Pulp Gold Circuit within the Kambalda Nickel ConcentratorThe reasons for and the methods of inte- gration of the gold treatment plant with the existing nickel concentrator are discussed. The integration was accomplished in three stages commencing in May 1
Jan 1, 1984
-
Improved Flotation Process Control at Newcrest's Telfer OperationBy S Hille, J Karageorgos
With the increased variability of todayÆs large-scale mining operations, consistent flotation performance is important to improving and sustaining overall recovery through the circuit. The Newcrest Te
Jan 1, 2007
-
The Integration of Geometallurgy with Plant DesignBy G Harbort
Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat
Aug 8, 2011
-
Paper No. 126. Silver-Lead Ore Mining And The Various Systems of Stoping And Timbering Employed in Broken Hill, New South Wales.As this district is so far distant from the other mining centres and its mode of approach so circuitous, I am afraid that many residents of other portions of the Commonwealth never think of paying thi
Jan 1, 1903
-
Mixed Media Grinding - A Refractory Gold Case StudyBy C Bartle
In many operations the use of less electrochemically reactive grinding media in the first grinding stage (for example, rod milling and high aspect ratio SAG milling) is rarely considered. Therefore, i
Jan 1, 2008
-
Beyond NPV - A Review of Valuation Methodologies and Their Applicability to Water in MiningBy D Brereton, C J. Moran
In this era of rising focus on the social and environmental costs and benefits of mining operations, the valuation methodologies used to assess such impacts become increasingly important. Within an in
Jan 1, 2006
-
Utilisation Technologies for Australian Iron Ore in ChinaBy D Duan
In this study, aimed at two kinds of ore (lump ore and iron ore fines) and four types of Australian iron ore resources (haematite iron ore, Mara Mamba iron ore, limonite iron ore, and mixed iron ore,
Jul 11, 2011
-
Telfer Project Process Plant DesignBy R Dunne, G Lane, S Ha, D Dreisinger
The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine
Jan 1, 2003
-
The Intec Copper Process: A Detailed Environmental AnalysisBy N J. Welham
The Intec Copper Process is an environmentally advantageous hydrometallurgical process for the production of high purity copper and associated precious metals from copper sulphide concentrates. The pr
Jan 1, 2002
-
A Guide to Selecting the Optimal Method of Resource Estimation for Multivariate Iron Ore DepositsBy H Arvidson, J Vann
When only wide-spaced drilling is available, for example at concept, prefeasibility and feasibility stages, properly implemented linear estimation (including ordinary kriging) predicts grade tonnage r
Jan 1, 2007