The Development and Integration of a Carbon-In-Pulp Gold Circuit within the Kambalda Nickel Concentrator

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
682 KB
Publication Date:
Jan 1, 1984

Abstract

The reasons for and the methods of inte- gration of the gold treatment plant with the existing nickel concentrator are discussed. The integration was accomplished in three stages commencing in May 1980 and attain- ing current throughput in December 1982. The problems encountered and their solution, including the design and construction of a new tailings dam are also discussed.
Citation

APA:  (1984)  The Development and Integration of a Carbon-In-Pulp Gold Circuit within the Kambalda Nickel Concentrator

MLA: The Development and Integration of a Carbon-In-Pulp Gold Circuit within the Kambalda Nickel Concentrator. The Australasian Institute of Mining and Metallurgy, 1984.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account