Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Purification of Low-Grade Quartz Ore by Flotation and its Mechanism

    The Purification of Low-Grade Quartz Ore by Flotation and its Mechanism

    Sep 13, 2010

  • AUSIMM
    Epithermal Gold-Silver Mineralisation - Karangahake

    A subsurface study of the Maria Lode and associated hydrothermal alteration of andesites within the Karangahake epithermal gold-silver deposit defined the local evolutionary sequence in the once activ

    Jan 1, 1984

  • AUSIMM
    Geochemistry of Molybdenum-Bearing Granodiorite Porphyries in West Nelson, with Special Reference to Elliot CK, Karamea Bend and Taipo Spur

    By S D. C Rabone

    An elongate belt containing granodiorite stocks with associated stockwork molybdenum mineralisation in west Nelson is correlated with the I-type Separation Point Suite of mid Cretaceous age. Trace ele

    Jan 1, 1987

  • AUSIMM
    The Underutilised Role for Economic Geologists and Geochemists in Environmental Aspects of Mineral-Resource Development

    By K S. Smith

    Mineral-deposit geology, geochemical processes, and biogeochemical processes are fundamental controls on the environmental conditions that exist naturally in mineralised areas prior to mining, and tha

    Jan 1, 1995

  • AUSIMM
    Contrasting Epithermal Gold Mineralisation in the Northern Coromandel Volcanic Zone, New Zealand

    By M R. Stevens

    The Kauri Block (Hauraki Hill) andMatawai Valley epithermal vein systems, near Coromandel township, are hosted by hydrothermally altered Miocene andesites and Mesozoic greywackes of the Coromandel Vol

    Jan 1, 1993

  • AUSIMM
    Structural Controls in the Tarnagulla Goldfield, Central Victoria: Implications for Metamorphically Derived Auriferous Fluids

    By V Morand, W R. H Ramsay

    Structural, mineralogical, and textural data from the Tarnagulla Goldfield demonstrate that the area has undergone three significant phases of deformation. The first phase of deformation (D1) predates

    Jan 1, 1995

  • AUSIMM
    Size Patterns of Gold-Silver Deposits in the Hauraki Goldfield, Coromandel Peninsula

    This paper presents an analysis of the production data for the period 1861 - 1953 from hydrothermal gold-silver deposits of the Hauraki Goldfield. To directly compare the metal content of the deposits

    Jan 1, 1981

  • AUSIMM
    Mechanism of Modified Sodium Silicate on Fluorite Ore Flotation

    Mechanism of Modified Sodium Silicate on Fluorite Ore Flotation

    Sep 13, 2010

  • AUSIMM
    A Mineralogical Examination of the McArthur Lead-Zinc-Silver Deposit

    The mineralisation consists principally of layered pyrite, phalerite and galena, situated conformably within a sequence of tuffaceous, bituminous shales and dolomitic sediments that include slump brec

    Jan 1, 1968

  • AUSIMM
    Commercialisation of Ni Heap Leaching at Murrin Murrin Operations

    Commercialisation of Ni Heap Leaching at Murrin Murrin Operations

    Sep 13, 2010

  • AUSIMM
    A Case Study on the Impact of Hedging Against Foreign Exchange Risk and Energy Price Risk

    By A A. Ndiaye, A Galli

    In a companion paper on current hedging practices in the mining industry (Armstrong et al, 2009) we showed that contrary to popular belief, mining groups are still using financial derivatives to hedge

    Jan 1, 2009

  • AUSIMM
    Leachwell Versus Fire Assay: Comments from Assay Quality Assurance at Tarmoola Gold Mine

    A fundamental component of grade control at Tarmoola Mine has been the monitoring of assaying through quality assurance programs. The programs have concentrated on issues related to accuracy and preci

    Jan 1, 2000

  • AUSIMM
    Iron ore benefits from neutron pulsed geochemical tools

    By R A. M Maddever, P Jeanneau, V Flahaut

    Over the entire life cycle of a mine, from early resource evaluation to the blasting of benches, the collection of geochemical data is crucial for the site operator, who must routinely and intensively

    Jul 24, 2017

  • AUSIMM
    When Organisations Fail: New Thinking on Disasters

    Disasters are often tragic outcomes of high-risk technologies such as mines. In Australia, more mines are being developed every day, and the risk of disasters is ever increasing. No matter how effecti

    Jan 1, 1999

  • AUSIMM
    Groundwater modelling support for closure approvals at Ranger Uranium Mine

    By J Sigda, T Jones, D Staggs, J Ewing, C Cheng, J Pickens, S Paulka

    Mine-derived solutes from Energy Resources of Australia’s (ERA’s) Ranger uranium mine have been closely monitored for decades. Ranger is surrounded by the Northern Territory’s Kakadu National Park and

    Jul 1, 2021

  • AUSIMM
    Seismic Response Prior to Spalling Failure in Highly Stressed Underground Tunnels

    By E Villaescusa, A Kusui

    The depth of underground mines has been increasing due to several factors, such as material demand growth and improving technology. It is a challenge to understand severe failure mechanisms such as sp

    May 9, 2016

  • AUSIMM
    Alluvial Sapphire Mining in the New England Region of New South Wales

    The richer, shallower sapphire deposits of the New England region of New South Wales which have been traditionally mined by the small miner are almost worked out. Larger mining and exploration compani

    Jan 1, 1990

  • AUSIMM
    Geochemistry of Wall Rock Alteration at the Waihi and Favona Epithermal Deposits, New Zealand

    By D N. Castendyk, J L. Mauk

    The world-class Waihi (>6.6 Moz Au, >41.8 Moz Ag) and adjacent Favona (>0.5 Moz Au) deposits are within a single volcanic-hosted epithermal Au-Ag district located in the southern Coromandel P

    Jan 1, 2003

  • AUSIMM
    Mine to Tunnel Scale Discontinuum Simulation of Repeated Dynamic Loading of Mine Excavations

    Underground excavations are subjected to complex stress changes caused by nearby mining, but may also be affected by repeated dynamic loading from blasting and seismic events. In some cases, the combi

    Nov 25, 2010

  • AUSIMM
    The Methodology Behind the Development of the Vera/Nancy Mine

    Within ten months of the first significant intersection on the Vera deposit, approval was given to proceed with a $28.3 M underground development of the Vera-Nancy gold mine. Contrary to what the time

    Jan 1, 1998