Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blasting In Close Proximity to Densely Populated Communities

    By Radhe Krishna, Mutale William Chanda, Timothy Mwale

    Blasting as a process is the emplacement of industrial explosives into blast holes suitably located to a free surface and detonated. Every blast hole containing a certain amount of explosive charge un

    Jan 1, 2015

  • ISEE
    Blasting as a Method for Abandoned Mine Land Reclamation

    By J Lyall Workman, Larry R. Fletcher

    Blasting methods have been proposed for reclaiming abandoned underground coal mine sites having unstable conditions. The objective of blasting is twofold: the permanent stabilization of an area by the

    Jan 1, 1991

  • ISEE
    Precision Blasting in the Nation's Captial: A Case History Showing the Use of a Seismograph as a Tool to Control Blasting Variables

    By Bill Rose, Alan Foster

    This paper will outline blasting as undertaken at the Flour Mill project in the Georgetown area of Washington, D.C. It will discuss the vibration and blasting problems found in blasting in high risk a

    Jan 1, 1979

  • ISEE
    Blast Vibration Monitoring & Calibration in the 21st Century

    By W. J. Birch, R. Farnfield

    Nuisance caused by perceived high vibration levels as a result of blasting on quarries and opencast coal mine is now the number one environmental concern of residents living adjacent to such operation

    Jan 1, 2014

  • ISEE
    Overpressure and Ground Vibration for Pipeline Construction Blasting - Measurements and Predictions

    By David Jones, Jeff Bregar, Damien Bell

    We have analyzed overpressure and ground vibration measurements for construction blasting for a large pipeline project. These field-measured levels have been compared to existing prediction curves in

    Feb 1, 2020

  • ISEE
    Destress Mass Blast in the North Regional Pillar at Brunswick Mine

    By Philemon Desrochers, Ken Qian Liu

    Following the success of the West Ore Zone distress mass blast in 2001 at Brunswick Mine, a similar approach was taken to distress the North Regional Pillar (NRP) which contained over 3 million tonnes

    Jan 1, 2004

  • ISEE
    The Effect of Available Energy on Blast Design

    By Lyall Workman, P D. Katsabanis

    Energy released by the explosive is typically partitioned in brisance, heave and losses. The fact that energy released in the P-V expansion curve below a certain point is lost has resulted in the conc

    Jan 1, 1998

  • ISEE
    The Thermal Basis for Explosive Decomposition with Heat due to External heating or reactive ground

    By Alastair Torrance, Gary Cavanough

    Over the past two years a research project has been performed on reactive and hot ground. A key finding is that host materials including carbonates and coal are inhibitors to the reaction of sulphide

    Jan 21, 2025

  • ISEE
    Blast Fume Management

    By Alan B. Richards, Aleks Todoroski

    The undesirable effects of blasting fumes can be controlled by minimising the amount of fume created, and by avoiding the movement of the fume plume to sensitive locations. Substantial progress has be

    Jan 1, 2017

  • ISEE
    Blasting in the Lower Shaft Station of Atomic Energy of Canada Limited's Underground Research Laboratory

    By P A. Lang, J G. Ayotte, R W. Humphries

    Atomic Energy of Canada Limited (AECL) has the responsibility for research, and development of technologies, for the safe and permanent disposal of Canada's nuclear fuel wastes. As part of this compre

    Jan 1, 1986

  • ISEE
    Implementation of Combined Blasting at Oyu Tolgoi

    By Bilegt Batbold, Bayu Saputra, Chris Batten

    The ability to fire multiple blasts simultaneously can provide significant benefits to any open pit mining operation. Reduced blast-related downtime by reducing blast events can increase equipment uti

    Jan 21, 2025

  • ISEE
    Electronic Detonator Failed by Electromagnetic Waves Emitted on Detonation of Nearby Explosive Charges

    By Tuan Nguyen, Dirk Hummel, Ruilin Yang

    In a tunnelling site in Japan, it was found that detonators failed to initiate with their shells and primary explosive intact. Their capacitors, however, were discharged due to some damage on the appl

    Feb 6, 2023

  • ISEE
    Preventing Slope Failure: Establishing Safe Vibration Limits in Discontinuous Rock Masses

    By Jorge Cardenas, David Martinez

    Blasting-induced vibrations can be predicted with high precision, allowing for the optimization of sequence design, delay timing, and charge configurations to minimize their indirect impact on rock ma

    Jan 26, 2026

  • ISEE
    Improved Techniques for Reactive Ground, Density and Performance Testing of Bulk Explosives

    By Italo Onederra, Gary Cavanough, Ewan Sellers

    Reactivity of ammonium nitrate based explosives is associated with the presence of iron sulfides in the ground reacting with explosive products and in some instances causing spontaneous reactions whic

    Jan 1, 2018

  • ISEE
    A New Blasthole Location Error Detection and Compensation System for Open Pit Mines

    By S. Klerkx, R Battulwar, J Valencia, J Sattarvand, E Emami, M. Soleymani Shishvan

    A new technology for energy distribution optimization, supported by NIOSH.

    Feb 1, 2020

  • ISEE
    Electronic Initiation System in Fosterville Gold Mine Development

    By C. Zuniga, S. Combrinck, C. Peters

    Agnico Eagle Gold have partnered with Enaex Australia at their Fosterville gold mine to leverage a combination of drill and blast technologies to optimise underground development mining. The mine is t

    Feb 6, 2023

  • ISEE
    Elements of Dynamic Airblast Overpressure Modelling

    By A. S. Romphf, C. K. McKenzie

    Recent full-scale field studies involving single-hole charges fired to free faces under a wide range of operating conditions have delivered precious insights into airblast characteristics and propagat

    Jan 26, 2026

  • ISEE
    A Holistic Approach to Developing a Narrow Cutback at an Open Cut Copper Mine

    By Stephen Mansfield, Nathan West, El Khalil Seyed

    In October 2017, a multi-bench failure occurred in the east wall of the Guelb Moghrein copper and gold mine in Mauritania. The failure extended 100 m (328 ft) vertically and horizontally and resulted

    Jan 21, 2025

  • ISEE
    Optimized Blasting Methods for TBM Launching Shaft Construction Beneath the Panama Canal: A Case Study

    By Jose Pineda, Abraham Lindo

    The Panama Metro System’s Network expansion involves excavating a launching shaft for a tunnel boring machine (TBM) to traverse beneath the Panama Canal. The blasting needed for this shaft constructio

    Jan 21, 2025

  • ISEE
    Drilling and Blasting on the Ty Nant Project.

    By Rob Farnfield, Ben Williams

    The A5 road in the United Kingdom forms an ancient and well-used route through the hills and mountains of North Wales. In the 1990?s a programme of work was conducted to upgrade the road to modern sta

    Jan 1, 2011