    A New Method of Reactive Ground Testing

    By Gary Cavanough

    The spontaneous exothermic reaction of ammonium nitrate explosives with sulphide-containing rocks, commonly referred to as reactive ground, is a site-specific condition that can lead to spontaneous de

    Feb 6, 2023

  • ISEE
    Rational Methodologies for Setting Blast Vibration Limits for Houses

    By Adrian Moore, Alan Richards

    "It has been common practice to set blast vibration limits for structures using an “observational”approach whereby limits are set at a level based on observations of damage, or the lack ofdamage, comb

    Jan 1, 2013

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

    Feb 1, 2020

  • ISEE
    Analyzing and Modeling Presplit Vibration Attenuation to Improve Mine Productivity

    By Tyler Rockley, J. P. Remi Proulx, Ruilin Yang

    A highwall blast vibration project was carried out to quantify the level of blast vibrations produced from a trim blast in soft rock and a combined production and trim blast in hard rock. Combining pr

    Feb 1, 2020

  • ISEE
    New Methodology for Calculating Dynamic Pressure

    By Jorge Cárdenas, José Luis Hurtado

    The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar

    Jan 21, 2025

  • ISEE
    Explosion Hazards and Quantity-Distance Regulations – A Review of their Physical Basis

    Currently there exist several explosive quantity-distance (Q-D) rules variously exercised by most countries to protect personnel and property against the effects of accidental explosions. These regula

    Jan 1, 2011

  • ISEE
    HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground

    By K. Dufresne

    Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron

    Jan 1, 2024

  • ISEE
    Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building

    By M V. Van Bers, A L. McAnuff, A Curic

    During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca

    Jan 1, 1999

  • ISEE
    Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam

    By Jennifer Williams, Donald J. Berger

    Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of

    Jan 1, 2014

  • ISEE
    The Importance of Keeping Accurate Records Time Trails

    By Brad Bockey

    Whether you are a driver, blaster, or are in charge of filing, you must recognize the importance associated with DOT-required recordkeeping. As various agencies become intertwined with rules governing

    Jan 1, 2011

  • ISEE
    Blasters' Survival

    By John C. Brulia

    The IME member companies, the ISEE along with its chapter organizations, the Federal, state and municipal regulatory agencies, and the industry consultants and suppliers have developed safety equipmen

    Jan 1, 1994

  • ISEE
    Journal: Safety Talk / Crisis Management

    By William Reisz

    The explosives and blasting industry has a commendable safety and security record, especially over the last several decades. This is due in large part to our newer technologies, better training and ed

    Jan 1, 2012

  • ISEE
    Advantages in Using Real-Time Blasting Simulation in Surface Blast Planning and Grade Control

    By Peter Dare-Bryan, Will Hunt, Lee Julian

    It is well-known that blasting has an economic effect on grade control activities. However, until recently, methods did not exist for measuring the grade control value change caused by the blast. Rule

    Feb 6, 2023

  • ISEE
    Controlled Hard Rock Trench Blasting Close to a Buried Gas Pipeline under Pressure

    By M. Ganster

    Austria’s biggest supplier of oil and gas, transports gas through the West Austria Gasline for domestic consumption. In addition, the OMV also works as gas carrier and ensures the transit into neighbo

    Jan 1, 2010

  • ISEE
    Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical Simulation

    By A. Vishwakarma, V. Himanshu, K. Dey

    Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method

    Jan 1, 2024

  • ISEE
    The Fragmentation-energy Fan, a Universal Behavior of Blasted Rock?

    By Peter Moser, Finn Ouchterlony, José A. Sanchidrián

    "Blast fragmentation data in the form of percentile fragment sizes as function of specific charge oftenform a set of straight lines in log(size)-log(energy) space that tend to converge on a common foc

    Jan 1, 2017

  • ISEE
    Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System

    By Jorge Cárdenas, Gustavo Huerta, Regina Rocha Oriundo, Miguel Angel Humpire, Johan Salas Flores

    Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in

    Feb 6, 2023

  • ISEE
    Investigating the Use of Complex Geometry Shock Tunnels to Model Urban Bombings

    By Barbara Rutter, Phillip Mulligan

    This research investigates how changes in shock tunnel geometry affect the pressure versus time waveform. The Large Arena Test Simulator (LATS), which is composed of four different rectangular section

    Feb 1, 2020

  • ISEE
    Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TN

    By William Gates, Gabe McClain, Thomas Pallua, Joe Schrank

    The Tennessee Capitol Corridor connects the Cordell Hull Building (CHB) to the State Capitol, which isa 232-foot-by-124-foot (71 x 38 m) structure in Nashville that includes porticoes built from local

  • ISEE
    Drilling & Blasting of a Small Diameter Shaft Next to Historic Structure

    By Corry Goumans, Ron J. Elliot

    This paper discusses the challenges encountered in drilling and blasting of a small diameter shaft underneath a parking garage in historic Gastown, Vancouver, BC. This project involved drilling in a r

    Jan 1, 2004