Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Non-Linear Analysis Of Large Pile Groups For The New Wembley Stadium

    By S. Hardy

    The paper describes state of the art non-linear analyses of the pile groups that were employed during the raising of the 133m high triumphal arch which forms the centre piece of the new Wembley stadiu

    Jan 1, 2006

  • DFI
    Vibration-Free Driven Tubular-Piles

    By S. Doombos

    To convert the railway-bridge across the Oude Maas between Dordrecht and Zwijndrecht into a vertical lifting bridge, a drastic adaptation of the existing piers is necessary. Extra piles have to be pla

    Jan 1, 1989

  • DFI
    Drilled Pier Foundations In Downtown Seattle - Introduction

    By Thomas M. Gurtowski

    This paper presents a summary of allowable bearing pressures and skin friction values that have been used to design drilled pier foundations for support of high-rise structures in downtown Seattle, Wa

    Jan 1, 1990

  • DFI
    A Case Study of Wet Soil Mixing for Bearing Capacity Improvement in Turkey

    By Arash Maghsoudloo, Asli Can

    "Abstract This paper presents a ground improvement implementation case under a raft foundation of a local hospital. The selected ground improvement method is Wet Soil Mixing (WSM) technique. Soil mixi

    Jan 1, 2014

  • DFI
    Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm Walls

    By B. Sivarama Sarma, Biswabikash Rout

    "Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes

    Jan 1, 2017

  • DFI
    Pile Test Results - 1-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only) - DFI Member Conference - Seattle, 1998

    By D. M. Holloway

    As a part of the 1-15 Reconstruction Project, static and dynamic (high-strain) testing methods formed the basis to estimate long-term axial capacities, and to assess the magnitudes of bearing capacity

    Jan 1, 1998

  • DFI
    Reducing Construction Interference when Implementing Geotechnical Instrumentation and Monitoring in Urban Excavation Projects

    By Martin B. Hudson, Daniel Brescia, Zhangwei Ning

    Due to the complexity and sensitivity of surrounding environments, instrumentation and monitoring (I&M) is critical for many urban deep excavations. The objects to be monitored include shoring bulkhea

    Jan 1, 2018

  • DFI
    Characteristic Features of Deep Excavations in the Metropolis and the Probable Hazards.

    By Sudhir Kumar Das

    "The exorbitant price of the land in the metropolis has restricted the horizontal expansion and compelled the owners, the developers and the engineers to opt for vertical expansion. This has resulted

    Jan 1, 2015

  • DFI
    Design and Construction of the New VDOT Midtown Tunnel

    By Rick Ellman, Ian Chaney

    "The Hampton Roads area encompassing the Norfolk, Virginia Beach and Newport News metropolitan region experiences some of the worst traffic congestion in Virginia. With continued growth of the ports a

    Jan 1, 2014

  • DFI
    Deep Mixing Ground Improvement Design to Support Large MSE Walls for Kitimat LNG, BC

    By Randy R. Williams, Roberto R. Olivera, Brian W. Wilson, Marina S. W. Li

    "An extensive, deep mixing (DM) ground improvement program using the Cutter Soil Mixing (CSM) technique was designed and constructed in 2013 to support up to 20 m (66 ft) high Mechanically Stabilized

    Jan 1, 2017

  • DFI
    Slope Stabilisation Of A Section Of The Thirlmere Aqueduct By The Use Of Spaced Micropiles And Permeation Grouting

    By David Preece

    The Thirlmere aqueduct was constructed over 110 years ago to provide water from the Lake District (in the north-west of England) to the city of Manchester some 60 miles (100 km) away. The aqueduct rem

    Jan 1, 2011

  • DFI
    Application Of Global Strain Extensometer (Glostrext) Method For Instrumented Bored Piles In Malaysia

    By Abdul Aziz Hanifah

    A novel instrumentation and analysis technique, called GLOSTREXT method has recently been introduced for bored pile load tests in Malaysia. This technique provides an innovative and improved alternati

    Jan 1, 2006

  • DFI
    Design Development & Installation Of Glass Fibre Reinforced Polymer (GRP) "Soft Eyes" In Diaphragm Wall Reinforcement Cages.

    By Paul M. Wiltcher

    This paper discusses how benefits in engineering design can be achieved from combining existing GRP concrete design guidelines with carbon steel design codes primarily made possible due to the increas

    Jan 1, 2006

  • DFI
    Soil-Cement Pile Foundations For A Large Storage Tank And Retaining Wall - Case History - Summary

    By Roy A. Bell

    A 200-foot diameter, 72-foot high petroleum storage tank was built in a hillside ravine where a portion of the site contained soft clay fill. Soil-cement piles, 40 inches in diameter and up to 38 feet

    Jan 1, 1997

  • DFI
    Wave Equation Analysis And Dynamic Monitoring - A Presentation At The Deep Foundations Institute?McGill University Symposium Montreal, September 1983

    By Bengt Fellenius

    The conventional wave equation analysis without control of the representativeness of the parameters to the actual conditions does not provide accurate results. However, the representatives can be vast

    Jan 1, 1984

  • DFI
    Prediction Of Settlement Of Structure With Piled-Raft Foundation Using Nodular Piles

    By Koichi Kobayashi

    Performance-based approach to design of structures including foundations was adopted after enforcement of the revised Building Standard Law in Japan in 2000. The use of piled-raft foundation is favora

    Jan 1, 2006

  • DFI
    An Innovative Approach To Load Testing Of High Capacity Piles

    By P. Bermingham

    A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma

    Jan 1, 1989

  • DFI
    Behavior Of Large Bored Piles With Grouted End

    By Zhang Yaonian

    This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati

    Jan 1, 2004

  • DFI
    Anchoring Tall Buildings In Lower Manhattan

    By Andrew Pontecorvo

    The design of foundations for the tall buildings of lower Manhattan rely on the use of high capacity, rock anchors to resist overturning forces generated by lateral loads from wind, earth, water and,

    Jan 1, 2011

  • DFI
    The Waterloo Barrier - A Sealable Joint Steel Sheet Piling For Groundwater Control And Remediation - Presented At The Deep Foundations Institute Annual Meeting & Conference Toronto, Ontario, October 15-17, 1997 - Summary

    By Murray Gamble

    A new type of groundwater cutoff wall has been developed at the University of Waterloo. The Waterloo Barrier? is a steel sheet piling system that incorporates a sealable cavity at each interlocking jo

    Jan 1, 1997