    Bearing Capacity Of Long Piles Driven Into Soft Soil ? Synopsis

    By F. Z. Suo

    Baoahan Iron and Steel Complex is situated at lower beaches of the Yangtze River. The subsoils 50~70 M below the surface is a deposite of Yangtze River delta, consisting mainly of weak silty clay and

    Jan 1, 2010

  • DFI
    Impact Of Offshore Site Investigation Practice On Reliability Of Axial Pile Design In Siliceous Sands

    By James A. Schneider

    The evolution of the American Petroleum Institute (API) design method for axial capacity of driven piles in siliceous sands is explored, and complemented with an overview of how changes in offshore si

    Jan 1, 2006

  • DFI
    Short Comparison Of The Determination Of Allowable Loads Of Steel H-Piles Following The Practice Applied In Different European Countries - Synopsis

    By L. P. Weber

    During the years 1983-1987, a research programme, jointly performed by the steel producers ARBED, British Steel Corporation, Peine-Salzgitter, Unimetal, and co-sponsored by the European Community for

    Jan 1, 1991

  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002

  • DFI
    Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West Yorkshire

    By J. A. Elliot

    Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou

    Jan 1, 1989

  • DFI
    Installation And Testing Of Instrumented Tieback Anchors - Introduction

    By Joan Stoupa

    The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili­

    Jan 1, 1990

  • DFI
    Quality Control of Production Pile Installations for US-90 Replacement Bridge Over St. Louis Bay

    By Kevin Kuhl

    With the destruction of the US-90 Bridge spanning St. Louis Bay by Hurricane Katrina, the State of Mississippi awarded its first major design-build contract in order to have a completed four-lane brid

    May 11, 2007

  • DFI
    Design Of Pile Foundations For The Sand Creek Byway, Sandpoint, Idaho

    By Dean E. Harris

    The realignment of U.S. Highway 95 in Sandpoint, Idaho, is being designed on a site underlain by glaciolacustrine soil that includes very thick deposits of soft, sensitive clay to estimated depths of

    Jan 1, 2003

  • DFI
    Micropiles And Anchor Piles - The Liberty Bridge

    By Daryl W. Wurster

    The Liberty Bridge in Greenville, South Carolina is a curved, cable-stayed, pedestrian bridge with primary support provided by two towers. The bridge is part of the Falls Park redevelopment. The bridg

    Jan 1, 2006

  • DFI
    Pile Load Test Results For Highway 280 Pile Uplift Test Site

    By Douglas Brittsan

    This paper presents pile tension and compression load test results for the Southern Freeway Viaduct (North) pile load test site. The testing program represents a collaboration between California Depar

    Jan 1, 1993

  • DFI
    Environmental Considerations For Foundation Construction In The Boston Area - The New MCP

    By James V. Errico

    On October 1, 1993 the regulations for assessing and cleaning up contaminated soil and groundwater in the Commonwealth of Massachusetts were revised. These new regulations, known as the Massachusetts

    Jan 1, 1994

  • DFI
    Installation of 10 Feet Diameter CIDHs in Soft Clay Using Rotator/Oscillator on Trestle

    By Babak Mamaqani, Pirooz Barar

    The Moanalua trestle spanned over Moanalua Stream, Honolulu, HI and was designed to accommodate construction of five 10 feet diameter cast in drilled hole (CIDH) piers as a part of Honolulu Authority

    Jan 1, 2019

  • DFI
    Prediction Of Jet Grout Column Diameter In Cohesive Soil

    By Chu E. Ho

    Current methods of determining jet grout column diameters are highly empirical and site specific, and do not take into account the jet hydrodynamics and soil parameters explicitly. A theoretical model

    Jan 1, 2006

  • DFI
    RD Pile Wall – A Water Tight Retaining Wall Structure

    By Antti J. Perala, Teemu J. Yli-Kovero

    "Efficient use of land is constantly requiring more underground construction. Minimized execution time and disturbance to surroundings and nearby structures are essential benefits for all construction

    Jan 1, 2017

  • DFI
    Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)

    By Anne Lemnitzer

    Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group

    Jan 1, 2010

  • DFI
    Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil Mixing

    By Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden

    Jan 1, 2014

  • DFI
    Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist

    By James P. Stewart

    This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une

    Jan 1, 2003

  • DFI
    Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:

    By Paul Morrison

    The paper describes the design process, trial testing and contract pile installation of 772 pre­cast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig

    Jan 1, 2000

  • DFI
    Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction

    By Brian R. Zuckerman

    The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State

    Jan 1, 2002

  • DFI
    6000 Ton Osterberg Load Test Reduces Foundation Costs For Delaware River Tramway

    By Aly M. Mohammad

    The Delaware River Tramway will link civic and retail developments in Philadelphia, Pennsylvania and Camden, New Jersey. Twin 300-foot towers will anchor the cables at either side of the river. Four h