Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Agnico Eagle LaRonde plant: Metallurgical challenges present and future

    By J. Cayouette, C. Bolduc, P. Blatter

    "The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext

    Jan 1, 2017

  • CIM
    Yard and Dock Railways, Town of Wabush

    By E. W. Coderre, R. C. Baxter

    "This paper describes the townsite of Wabush and the two railways operated by Wabush Mines for the loading and unloading of iron ore concentrate. The town of Wabush is located approximately 200 air mi

    Jan 1, 1969

  • CIM
    Requirements for Paste Backfill Preparation in Narrow-Vein Mining

    By Alfred B. Annor

    The introduction and application of paste backfill over the past two decades has resulted in substantial benefits being realised by many backfill reliant mining operations who have used this technolog

    Oct 1, 2001

  • CIM
    World Bank Group Program Requirements - Mining Investments in Developing Countries

    By Barbara A. Filas

    The IFC goal is to promote private sector investment in developing countries which will reduce poverty and improve people?s lives. The developing country goal is to promote health, education and emp

    May 1, 2002

  • CIM
    Sherritt Gordon Mine

    By W. J. Farley

    "The Sherritt Gordon mine is 100 miles north of The Pas in northern Manitoba. Copper-zinc ore was discovered on the property in 1922. Production began in 1931 and continued to June, 1932, when operati

    Jan 1, 1954

  • CIM
    Energy Conservation Measures at Syncrude Oil Sand Processing Operations

    By George J. Cymerman

    Since 1978, Syncrude Canada Ltd. has been expanding steadily its oil sand mining and processing capacity while reducing unit energy requirements. At the current rate of ~180 M tonne/year oil sand, the

    May 1, 2006

  • CIM
    Using the discrete-element method to investigate ball milling power draw, load behaviour, and impact energy profile

    By M. B. Kime

    "Discrete-element method (DEM) modelling is a powerful tool for studying particulate systems within the mineral processing industry. DEM simulations were conducted to investigate the power draw, load

    Jan 1, 2017

  • CIM
    Recycling of Zinc and Lead Bearing Materials at Hydrometal (Belgium)

    By P. Henry

    Hydrometal provides an adequate technology to reintroduce lost metal units into the industrial cycle, thereby saving resources and energy, while keeping the environment cleaner. Two case studies of ou

    Jan 1, 2008

  • CIM
    McWatters mine

    By M. E. Wilson

    "The property of McWatters Gold Mines, Limited, is in the east-central part of Rouyn township and about 6 miles east-southeast of the town of Rouyn. It includes 35 claims, the group of 5, staked origi

    Jan 1, 1954

  • CIM
    Effective Modeling and Estimation of Stratified Deposits

    By Garth D. Kirkham

    The Problem The Don deposit is a series of two sub-vertical zones that pose a number of challenges with respect to modeling and interpolation. The first challenge is that, based on data and observa

    May 1, 2013

  • CIM
    Altered Mining Extraction Sequence and Rock Mass Response in Vale 402 OB at Creighton Mine

    By C. Denis Thibodeau

    Outline Introduction 402 OB Mining Sequence Trial to Verify Sequence Change Monitoring Observations Numerical Modelling Conclusion

    May 1, 2013

  • CIM
    Geology of Gypo quartz vein, Oliver·, British Columbia

    By D. MOORE, A. REINSBAKKEN, A. J. Sinclair

    The Gypo quartz vein lies near Oliver, British Columbia, and was quarried between 1955 and 1968 for decorative chips. The vein is one of many quartz veins hosted by the Late Jurassic Oliver Plutonic C

    Jan 1, 1984

  • CIM
    Early Nova Scotia gold mining

    By John Hartlen

    "The 19th century was an ""age of gold"" and Nova Scotia experienced its share of early gold rushes. Gold mining activity in the province was focussed into three ""rushes"" which occurred, approximate

    Jan 1, 1999

  • CIM
    From Open Cast to Block Cave and the Effects on the Autogenous Milling Circuit at Palabora Mining Copper (4c86e50a-2cf3-4106-bb4f-6a8b452c0d68)

    By J. Makgatho, P. Condori, J. Winnett, Fischerm D.

    "Palabora Mining Copper (PMC) has two autogenous mills that have been in operation since 1976. The mills were originally designed to treat 30 000 t/d of open cast copper ore in a closed circuit with c

    Jan 1, 2012

  • CIM
    The Influence of Underground Voids on the Stability of Pit Wall Slopes ? A Probabilistic Approach

    By Kamran Esmaieli

    Open Pit Mining Through Underground Voids: Challenges Main Challenges/Hazards: Unexpected collapse of the pit floor and/or pit walls; The loss of equipment and/or people into underground voids;

    May 1, 2013

  • CIM
    Joining Geomechanical and Geophysical Monitoring at Coal and Ore Mines

    By V. V. Zubkov

    The systems of geophysical monitoring have been already put into operation at coal mines and ore mines. Since at present it is rather difficult to conduct mine experiments; it is necessary to start a

    Aug 1, 2013

  • CIM
    Evolution of Grade Control at Falconbridge Kidd Creek Mine

    By S. D. Tolgyesi

    Kidd Creek Background ? Located in Northern Ontario, Canada ? Underground base metal mine ? Operating since 1966 ? Total of 125Mt mined to date (2.43% Cu, 6.60% Zn) ? Current plan at 2.4Mt/Y (657

    May 1, 2003

  • CIM
    Flowsheet development, commissioning, and start-up of the Voisey’s Bay mill

    By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes

    "The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat

    Jan 1, 2017

  • CIM
    Design Guidelines for Permanent Tunnel Plugs

    By Brennan Lang

    Why Seal Tunnels? ?Restore groundwater levels to pre-mining conditions. ?Saturate rock mass to reduce acid rock drainage. ?Reduce discharge flow to the environment. ?Reduce or regulate flows to a

    May 1, 2002

  • CIM
    Ionic Equilibria and Precipitation Reactions of Slag Components in Seawater

    By A. Yoshida, H. Miura, S. Yamaguchi, Y. Oyama

    A discussion is given on the ionic equilibria and precipitation reactions in seawater based on thermodynamic analysis, in order to understand the solubility of nutrient salts from dephosphorization sl

    Jan 1, 2004