Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Bio-Liquefaction of Fushun Coal and its Model Compounds by White Rot Fungi Hypocrea Lixii Ah

    By Xiu-Xiang Tao

    This study investigated bio-liquefaction of lignite and its model compounds of thymol, bezioc acid and quinoline by a fungus, Hypocrea lixii AH. It analyzed, during bio-liquefaction, enzyme activity o

    Aug 1, 2013

  • CIM
    The single train ultra reformer - an integrated catalytic design approach to PEMFC-quality hydrogen production

    By P Hulteberg

    In this article, an integrated catalytic reactor design approach to produce PEMFC-quality hydrogen is evaluated. The design is based on a high level of heat exchanging perfonned internally, highly act

    Jan 1, 2005

  • CIM
    Fuelcell Mine Loader and Prototype Locomotive

    By Arnold R. Miller

    Overview ? Vehicle Projects LLC (prime contractor) and the Fuelcell Propulsion Institute have developed the world?s first fuelcell locomotive. ? Principal applications are underground mining and tun

    May 1, 2002

  • CIM
    Creep of Mg-Alloys

    By W. Blum

    Progress made in improving the creep resistance of Mg alloys is reviewed with the emphasis on microstructural interpretation. Experimental results on the increase of creep strain with time at constant

    Jan 1, 2006

  • CIM
    Guided wave radar transmitters: Meeting the challenge for level detection under harsh conditions

    By K. Hambrice, E. Fauveau

    "When it comes to measuring the level of bulk solids, liquids, and everything in between, guided-wave radar technology now offers more level-detection capabilities than ever before. For an ever-wideni

    Jan 1, 2003

  • CIM
    Experimental Investigation on Thermo-Hydro-Mechanical-Chemical Behaviour of Cemented Paste Backfill

    By A. Ghirian

    Once cemented paste backfill (CPB) is transferred and placed into a mine stope, various coupled mechanisms will take place in the CPB material or structure. It will be subjected to strong coupled ther

    Aug 1, 2013

  • CIM
    Mirador Copper - Gold Project

    Mirador - Overview ? Located in Andean foothills of SE Ecuador ? Copper-gold porphyry hosted by calc-alkaline Late Jurassic granitic and porphyritic rocks ? 438 MT of 0.61% Cu and 0.19 g/t Au measu

    May 1, 2006

  • CIM
    Predicting Misruns in LPPM Casting of Light Metal Parts (Aluminum A356 and Magnesium AZ91E)

    By F. Chiesa

    Experimental results on thin and thick castings poured in aluminum A356 and magnesium AZ91E by the low pressure permanent mold process have been compared to the result of filling simulations for thin

    Jan 1, 2011

  • CIM
    Ventilation System Design for the Wassa Underground Mine

    By B. S. Prosser, K. G. Wallace, A. Akansobe

    "This paper describes a ventilation project at the Wassa gold mine in Ghana. Golden Star (Wassa) (GSWL), a subsidiary of Golden Star Resources, owns and operates the mine. Golden Star holds a 90% inte

    Jan 1, 2019

  • CIM
    Valuation of Non-Producing Mineral Properties Using Market Comparables

    By William E. Roscoe

    "Non-producing mineral properties include those at various stages of exploration, properties at the pre-feasibility or feasibility stage, properties with currently uneconomic mineral resources, and pa

    Jan 1, 2003

  • CIM
    Séquences optimales d’exploitation dans les gisements très inclinés

    By A. Coulombe

    "RésuméL’analyse des séquences d’exploitation, actuellement en usage pour les gisements très inclinés, a démontré qu’elles ne sont pas toujours optimales du point de vue du contrôle des terrains et de

    Jan 1, 1998

  • CIM
    Industrial natural gas technologies for the mining and metallurgy industry

    By A. Zaidi

    "The mining and metallurgy industry is highly energy intensive and one of the largest energy users in Canada. Energy costs are also a major component of total production costs in this industry as desc

    Jan 1, 1993

  • CIM
    Basic Brick in Canada

    By J. W. Craig

    THERE are, broadly speaking, three classes of refractories: acid, basic, and neutral. Fireclay, diaspore, silica, and the sillimanite group of minerals are included in the acid class, which for the mo

    Jan 1, 1936

  • CIM
    Shaft-Sinking Practice and Equipment at the Hallnor Mine

    By R. J. A. Fricker

    IT is the purpose of this essay to give a reasonably complete description of shaft sinking under a rock pentice in a small Northern Ontario gold property. Hallnor is in many ways an exceptional mine

    Jan 1, 1941

  • CIM
    Benefits of Pillar Destressing in Narrow Vein Mining

    By Hani S. Mitri

    Overhand cut-and-fill mining of narrow vein orebodies inevitably leads to the creation of horizontal pillars. As the thickness of the overlying crown pillar diminishes, stresses build up in the pillar

    Oct 1, 2001

  • CIM
    Impurities at HBM&S' Flin Ron copper smelter

    By A. M. Salomon de Friedberg

    With respect to impurities, HBM&S' copper smelter, located in Flin Flon, Manitoba, is in an unusual position. In addition to the usual concerns, the fact that copper and zinc production at Fl

    Jun 1, 1993

  • CIM
    Development of Ni-Co-Base Superalloys for Turbine Disk Applications

    By J. Fujioka, Y. F. Gu, C. Cui, D. Ping, A. Sato, H. Harada

    "A new kind of cast & wrought (C&W) Ni-Co base superalloys named as ""TMW alloys"" are developed recently for compressor or turbine disks of gas turbine engines in High Temperature Materials 21 Projec

    Jan 1, 2006

  • CIM
    Phase Relations and Activities of Arsenic and Antimony in the Cu-O-As and Cu-O-Sb SYSTEMS at 1523 K

    By L. Voisin, K. Yamaguchi, D. G. Mendoza, K. Ltagaki

    The behavior of arsenic and antimony in the Cu-0 system was thermodynamically investigated to understand their elimination during a blister-making stage in copper smelting. Firstly, the phase relation

    Jan 1, 2007

  • CIM
    Stratigraphy, Mineralogy, Geochemistry, and Genesis of the Au-Rich Volcanogenic Massive Sulfide (Vms) System from the Bate Verte Peninsula, NW Newfoundland, Canada: The 1806 Zone As An Example From The Ming Mine, Rambler Camp

    By P. J. Sylvester, S. J. Piercey, S. Maloney, S. M. Brueckner, L. Pilgrim, D. Hyde, G. Ogilvie

    The 1806 zone is part of a Au-rich volcanogenic massive sulfide deposit at the Rambler Camp on the Baie \/erte Peninsula, northwestern Newfoundland, and is characterized by high Au grades (3.97 g/t),

    Jan 1, 2011

  • CIM
    The Economics of Coal Cleaning

    By G. A. Vissac

    IN THE preliminary design of a coal washery, the most important factor to evaluate is the ash content of the final product. The ash content permissible may be imposed by market demands, but, in the

    Jan 1, 1957